TDOT contract CN264036 bid tabulation
The grading, drainage, construction of bridges, and paving on s.r. 54 from near howard road (l.m. 22.07) to the kentucky state line (l.m. 24.95). Let by Tennessee DOT on May 8, 2026, Henry County. 4 bids received; low bid $38,326,692 by Delta Contracting Company, LLC.
- Owner
- Tennessee DOT
- Letting
- 08 MAY 2026
- Pay items
- 222
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Delta Contracting Company, LLC | $38,326,692 | Low |
| 2 | Hal Coffey Contracting LLC | $42,273,459 | +10% |
| 3 | Vaughn Contractors, Inc. | $43,784,593 | +14% |
| 4 | Jones Bros. Contractors, LLC | $48,779,831 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delta Contracting Company, LLC | 2. Hal Coffey Contracting LLC | 3. Vaughn Contractors, Inc. | 4. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $360,000 | $250,000 | $300,000 | $250,000 |
| 2 | CPM project schedule (108-03) | LS | 1 | $118,230 | $125,000 | $143,000 | $120,000 |
| 3 | Trainee (109-10.01) | HR | 4,960 | $0.80 | $0.80 | $0.80 | $0.80 |
| 4 | Clearing and grubbing (201-01) | LS | 1 | $824,988 | $934,500 | $1,350,000 | $1,600,000 |
| 5 | Removal of buildings (tract no. 4) (202-06.01) | LS | 1 | $1,500.00 | $5,000.00 | $25,000 | $100.00 |
| 6 | Removal of buildings (tract no. 17) (202-06.02) | LS | 1 | $8,000.00 | $5,000.00 | $25,000 | $100.00 |
| 7 | Road & drainage excavation (unclassified) (203-01) | CY | 360,613 | $3.00 | $6.48 | $8.00 | $6.98 |
| 8 | Road & drainage excavation (stream mitigation) (203-01.13) | CY | 4,598 | $8.50 | $18.00 | $20.00 | $26.00 |
| 9 | Borrow excavation (graded solid rock) (203-02.01) | TON | 83,854 | $37.00 | $33.25 | $32.50 | $36.00 |
| 10 | Borrow excavation (select material) (203-03.01) | CY | 68,447 | $2.00 | $16.45 | $28.00 | $41.00 |
| 11 | Placing and spreading topsoil (203-04) | CY | 25,497 | $4.20 | $3.55 | $6.00 | $5.50 |
| 12 | Undercutting (203-05) | CY | 62,498 | $2.00 | $4.75 | $8.50 | $7.50 |
| 13 | Channel excavation (unclassified) (203-08) | CY | 1,427 | $18.00 | $15.00 | $20.00 | $37.00 |
| 14 | Channel substrate (203-20.01) | CY | 180 | $105.00 | $10.00 | $100.00 | $88.00 |
| 15 | Construction of haul road (203-50) | LS | 1 | $491,919 | $450,000 | $120,000 | $100,000 |
| 16 | Foundation fill material (204-08) | CY | 367 | $85.00 | $85.00 | $70.00 | $100.00 |
| 17 | Backfill material (flowable fill) (204-08.01) | CY | 10 | $400.00 | $450.00 | $350.00 | $450.00 |
| 18 | 18" temporary slope drain (209-02.07) | LF | 400 | $15.00 | $3.00 | $25.00 | $35.00 |
| 19 | Filter sock (18 inch) (209-03.22) | LF | 300 | $9.75 | $9.75 | $10.00 | $10.00 |
| 20 | Stream mitigation - log riffle (209-03.40) | LF | 222 | $222.00 | $155.00 | $150.00 | $200.00 |
| 21 | Stream mitigation - live brush layering (209-03.42) | LF | 329 | $85.00 | $75.00 | $150.00 | $161.00 |
| 22 | Stream mitigation – wood toe W/reinforced earth (209-03.67) | LF | 329 | $94.00 | $134.00 | $300.00 | $375.00 |
| 23 | Protected area marker (white with decal) (209-03.99) | EACH | 51 | $280.00 | $200.00 | $250.00 | $280.00 |
| 24 | Sediment removal (209-05) | CY | 2,280 | $8.00 | $7.50 | $10.00 | $10.00 |
| 25 | 12" dia coir log (low flow channel) (209-06.02) | LF | 471 | $18.50 | $18.50 | $12.00 | $15.00 |
| 26 | Temporary silt fence (with backing) (209-08.02) | LF | 50,416 | $3.85 | $3.85 | $4.75 | $4.75 |
| 27 | Temporary silt fence (without backing) (209-08.03) | LF | 48,288 | $1.75 | $1.75 | $1.90 | $1.90 |
| 28 | Enhanced rock check dam (209-08.08) | EACH | 48 | $800.00 | $525.00 | $1,200.00 | $1,050.00 |
| 29 | Filter sock check dam (209-08.09) | EACH | 1,035 | $295.00 | $195.00 | $295.00 | $295.00 |
| 30 | Sandbags (209-09.01) | BAG | 3,517 | $4.00 | $3.75 | $6.00 | $8.00 |
| 31 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 7 | $460.00 | $750.00 | $500.00 | $800.00 |
| 32 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 500 | $0.72 | $2.00 | $5.00 | $3.00 |
| 33 | Polyethylene sheeting (10 mil.) (209-20.04) | SY | 500 | $1.20 | $2.50 | $6.00 | $4.00 |
| 34 | Catch basin filter assembly(type 1) (209-40.41) | EACH | 5 | $525.00 | $525.00 | $750.00 | $750.00 |
| 35 | Catch basin filter assembly(type 3) (209-40.43) | EACH | 1 | $800.00 | $800.00 | $900.00 | $900.00 |
| 36 | Temporary diversion channel (209-65.03) | LF | 1,442 | $7.00 | $12.00 | $40.00 | $45.00 |
| 37 | Temporary in stream diversion (209-65.04) | LF | 110 | $60.00 | $98.00 | $200.00 | $134.00 |
| 38 | Granular backfill (roadway) (303-01.01) | TON | 5,615 | $40.00 | $65.00 | $25.00 | $50.00 |
| 39 | Mineral aggregate (size 57) (303-10.01) | TON | 2,924 | $50.00 | $38.00 | $60.00 | $48.00 |
| 40 | Mineral aggregate (size 68) (303-10.03) | TON | 177 | $50.00 | $35.00 | $75.00 | $60.00 |
| 41 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 3,838 | $107.00 | $107.00 | $107.00 | $120.00 |
| 42 | Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21) | TON | 17,228 | $101.00 | $98.50 | $101.00 | $110.00 |
| 43 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 18,518 | $103.00 | $104.40 | $103.00 | $107.00 |
| 44 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 12,136 | $107.00 | $103.00 | $107.00 | $107.00 |
| 45 | Bituminous material for prime coat (PC) (402-01) | TON | 205 | $200.00 | $100.00 | $200.00 | $1,040.00 |
| 46 | Aggregate for cover material (PC) (402-02) | TON | 723 | $5.00 | $5.00 | $5.00 | $51.00 |
| 47 | Bituminous material for tack coat (TC) (403-01) | TON | 82 | $200.00 | $1,000.00 | $200.00 | $930.00 |
| 48 | Saw cutting asphalt pavement (407-20.05) | LF | 1,500 | $3.05 | $5.50 | $2.00 | $2.00 |
| 49 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 2,172 | $113.00 | $124.00 | $113.00 | $119.00 |
| 50 | Acs mix(PG64-22) grading D (411-01.10) | TON | 97 | $135.00 | $200.00 | $135.00 | $250.00 |
| 51 | Acs mix(PG70-22) grading D (411-02.10) | TON | 7,141 | $140.00 | $129.50 | $140.00 | $130.00 |
| 52 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 0.30 | $5,500.00 | $5,500.00 | $5,500.00 | $2,245.00 |
| 53 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 5.10 | $1,600.00 | $1,600.00 | $1,600.00 | $2,245.00 |
| 54 | Cold planing bituminous pavement (415-01.01) | TON | 309 | $49.00 | $50.00 | $49.00 | $140.00 |
| 55 | Class A concrete (roadway) (604-01.01) | CY | 330 | $627.00 | $1,100.00 | $1,375.00 | $1,200.00 |
| 56 | Steel bar reinforcement (roadway) (604-01.02) | LB | 66,444 | $1.00 | $1.95 | $1.37 | $1.30 |
| 57 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 730 | $86.00 | $65.00 | $65.00 | $90.00 |
| 58 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 170 | $110.00 | $85.00 | $85.00 | $120.00 |
| 59 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 726 | $155.00 | $125.00 | $140.00 | $180.00 |
| 60 | 18" pipe culvert (side drain) (607-39.02) | LF | 242 | $35.00 | $55.00 | $55.00 | $95.00 |
| 61 | 24" pipe culvert (side drain) (607-39.03) | LF | 66 | $52.00 | $65.00 | $72.00 | $105.00 |
| 62 | Trench drains (611-05.01) | LF | 211 | $546.00 | $590.00 | $450.00 | $625.00 |
| 63 | 12IN PVC pipe for trench drains (611-05.02) | LF | 5 | $150.00 | $60.00 | $500.00 | $50.00 |
| 64 | Class A concrete (pipe endwalls) (611-07.01) | CY | 10 | $1,250.00 | $2,500.00 | $2,000.00 | $2,300.00 |
| 65 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 378 | $2.00 | $4.00 | $3.00 | $3.00 |
| 66 | 18IN endwall (side drain) (611-07.31) | EACH | 16 | $5,000.00 | $4,500.00 | $4,200.00 | $4,550.00 |
| 67 | 24IN endwall (side drain) (611-07.32) | EACH | 4 | $6,100.00 | $5,500.00 | $5,200.00 | $6,300.00 |
| 68 | 18IN endwall (cross drain) 3:1 (611-07.54) | EACH | 2 | $2,700.00 | $2,200.00 | $3,000.00 | $2,000.00 |
| 69 | 18IN endwall (cross drain) 4:1 (611-07.55) | EACH | 1 | $3,051.40 | $2,500.00 | $3,000.00 | $2,400.00 |
| 70 | 24IN endwall (cross drain) 4:1 (611-07.58) | EACH | 1 | $3,832.56 | $3,300.00 | $4,000.00 | $3,400.00 |
| 71 | 24IN endwall (cross drain) 6:1 (611-07.59) | EACH | 1 | $4,940.97 | $4,500.00 | $4,400.00 | $5,000.00 |
| 72 | 36IN endwall (cross drain) 6:1 (611-07.65) | EACH | 2 | $9,028.99 | $9,500.00 | $11,000 | $11,000 |
| 73 | 42IN endwall (cross drain) 4:1 (611-07.67) | EACH | 1 | $5,900.00 | $11,500 | $10,000 | $13,500 |
| 74 | 42IN endwall (cross drain) 6:1 (611-07.68) | EACH | 1 | $6,700.00 | $12,500 | $13,500 | $16,500 |
| 75 | Catch basins, type 38, 0' - 4' depth (611-38.01) | EACH | 1 | $4,122.51 | $7,000.00 | $5,400.00 | $6,800.00 |
| 76 | Catch basins, type 38, > 4' - 8' depth (611-38.02) | EACH | 1 | $4,413.03 | $7,500.00 | $6,000.00 | $6,900.00 |
| 77 | Catch basins, type 42, 0' - 4' depth (611-42.01) | EACH | 1 | $3,935.29 | $8,500.00 | $5,200.00 | $6,100.00 |
| 78 | Catch basins, type 42, > 4' - 8' depth (611-42.02) | EACH | 2 | $5,998.59 | $9,000.00 | $6,200.00 | $10,600 |
| 79 | Catch basins, type 42, > 8' - 12' depth (611-42.03) | EACH | 1 | $6,775.88 | $9,500.00 | $9,500.00 | $8,000.00 |
| 80 | 18" temporary drainage pipe (621-03.02) | LF | 100 | $37.44 | $80.00 | $45.00 | $70.00 |
| 81 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 5,214 | $27.00 | $31.50 | $28.00 | $27.00 |
| 82 | Short-radius guardrail system (48FT radius) MASH TL-3 (705-06.19) | EACH | 1 | $15,500 | $20,000 | $15,000 | $15,500 |
| 83 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 20 | $3,400.00 | $3,350.00 | $3,500.00 | $3,400.00 |
| 84 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 4 | $2,500.00 | $3,000.00 | $2,800.00 | $2,500.00 |
| 85 | High-visibility construction fence (707-08.11) | LF | 25,438 | $1.60 | $1.60 | $2.50 | $2.50 |
| 86 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 84 | $300.00 | $300.00 | $350.00 | $500.00 |
| 87 | Machined rip-rap (class A-3) (709-05.05) | TON | 2,150 | $50.00 | $55.00 | $52.00 | $59.00 |
| 88 | Machined rip-rap (class A-1) (709-05.06) | TON | 1,530 | $51.00 | $55.00 | $52.00 | $62.00 |
| 89 | Machined rip-rap (class B) (709-05.08) | TON | 1,144 | $51.00 | $55.00 | $52.00 | $62.00 |
| 90 | Aggregate underdrains (with pipe) (710-02) | LF | 24,689 | $13.00 | $13.00 | $13.00 | $13.00 |
| 91 | Lateral underdrain (710-05) | LF | 3,807 | $12.00 | $12.00 | $12.00 | $12.00 |
| 92 | Lateral underdrain endwall (3:1) (710-06.12) | EACH | 9 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 93 | Lateral underdrain endwall (4:1) (710-06.13) | EACH | 18 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 94 | Lateral underdrain endwall (6:1) (710-06.15) | EACH | 114 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 95 | 6" perforated plastic pipe (710-10.02) | LF | 260 | $80.00 | $15.00 | $50.00 | $25.00 |
| 96 | Traffic control (712-01) | LS | 1 | $63,500 | $75,000 | $43,500 | $100,000 |
| 97 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 1,340 | $35.00 | $75.00 | $45.00 | $40.00 |
| 98 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $4,065.00 | $7,350.00 | $5,000.00 | $8,000.00 |
| 99 | Flexible drums (channelizing) (712-04.01) | EACH | 171 | $45.00 | $39.00 | $45.00 | $39.00 |
| 100 | Barrier rail delineator (712-04.50) | EACH | 32 | $10.00 | $10.00 | $10.00 | $10.00 |
| 101 | Warning lights (type A) (712-05.01) | EACH | 62 | $25.00 | $10.00 | $25.00 | $10.00 |
| 102 | Signs (construction) (712-06) | SF | 2,661 | $7.30 | $5.00 | $7.30 | $5.00 |
| 103 | Temporary barricades (type III) (712-07.03) | LF | 372 | $15.00 | $18.00 | $15.00 | $18.00 |
| 104 | Arrow board (type C) (712-08.03) | EACH | 6 | $1,250.00 | $1,500.00 | $1,250.00 | $1,500.00 |
| 105 | Removable black-out tape (6") (712-09.30) | LF | 4,800 | $7.00 | $7.00 | $7.00 | $8.00 |
| 106 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 0.40 | $670.00 | $638.00 | $700.00 | $670.00 |
| 107 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 98 | $3.65 | $4.07 | $4.00 | $3.65 |
| 108 | Sign post delineation enhancement (713-02.21) | LF | 55 | $3.65 | $7.22 | $4.00 | $3.65 |
| 109 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 428 | $8.50 | $9.69 | $10.00 | $8.50 |
| 110 | "U" section steel posts (713-11.01) | LB | 182 | $4.65 | $3.63 | $5.00 | $4.65 |
| 111 | Perforated/knockout square tube post (713-11.02) | LB | 2,236 | $4.50 | $4.49 | $5.00 | $4.50 |
| 112 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 351 | $13.72 | $20.16 | $14.00 | $13.72 |
| 113 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 126 | $15.00 | $20.86 | $15.00 | $14.99 |
| 114 | Extruded aluminum panel signs (713-14) | SF | 90 | $31.00 | $41.94 | $30.00 | $31.00 |
| 115 | Street name sign (rigid 0.100IN thick (713-14.21) | SF | 14 | $28.00 | $75.00 | $20.00 | $28.00 |
| 116 | Removal of signs, posts and footings (713-15) | LS | 1 | $1,000.00 | $3,291.00 | $1,500.00 | $1,000.00 |
| 117 | Changeable message sign unit (713-16.01) | EACH | 21 | $5,000.00 | $4,250.00 | $5,000.00 | $425.00 |
| 118 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 445 | $49.00 | $49.00 | $50.00 | $52.00 |
| 119 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 444 | $49.00 | $49.00 | $50.00 | $52.00 |
| 120 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 76 | $49.00 | $49.00 | $50.00 | $52.00 |
| 121 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 4,461 | $37.00 | $37.00 | $37.00 | $40.00 |
| 122 | Plastic pavement marking (stop line) (716-02.05) | LF | 106 | $40.00 | $40.00 | $40.00 | $35.00 |
| 123 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 24 | $280.00 | $280.00 | $300.00 | $300.00 |
| 124 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 460 | $6.00 | $6.00 | $8.00 | $4.50 |
| 125 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.10 | $22,000 | $22,000 | $25,000 | $23,760 |
| 126 | Painted pavement marking (4" line) (716-05.01) | LM | 20 | $3,000.00 | $3,000.00 | $3,000.00 | $3,200.00 |
| 127 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 16.70 | $9,000.00 | $9,000.00 | $9,000.00 | $9,500.00 |
| 128 | Mobilization (717-01) | LS | 1 | $2,239,358 | $1,853,500 | $2,080,000 | $1,950,000 |
| 129 | Field office (type 2) (722-01.02) | LS | 1 | $40,000 | $155,000 | $120,000 | $120,000 |
| 130 | Geogrid reinforcement type 2 (740-07.04) | SY | 3,714 | $4.50 | $8.00 | $5.80 | $7.00 |
| 131 | Geotextile (type III)(erosion control) (740-10.03) | SY | 6,156 | $3.00 | $2.25 | $3.00 | $3.00 |
| 132 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 286,839 | $1.89 | $3.15 | $3.00 | $2.85 |
| 133 | Temporary sediment tube 20IN (740-11.04) | LF | 1,948 | $4.15 | $4.15 | $5.00 | $5.50 |
| 134 | Seeding (with mulch) (801-01) | UNIT | 76 | $35.00 | $35.00 | $40.00 | $40.00 |
| 135 | Temporary seeding (with mulch) (801-01.07) | UNIT | 2,642 | $23.50 | $23.50 | $32.00 | $32.00 |
| 136 | Cover crop seed mix (ripzn/FLPL) W/mulch (801-01.30) | UNIT | 32 | $80.00 | $80.00 | $100.00 | $100.00 |
| 137 | Grass seed mix (ripzn/FLPL) (801-01.34) | UNIT | 42 | $65.00 | $65.00 | $100.00 | $100.00 |
| 138 | Grass seed mix (ripzn/FLPL) W/mulch (801-01.35) | UNIT | 32 | $100.00 | $100.00 | $150.00 | $150.00 |
| 139 | Special wetland seed mixture (801-01.36) | UNIT | 32 | $120.00 | $120.00 | $150.00 | $150.00 |
| 140 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 39 | $100.00 | $100.00 | $150.00 | $150.00 |
| 141 | Temporary mulch (801-01.65) | UNIT | 2,642 | $19.25 | $19.25 | $15.00 | $15.00 |
| 142 | Seeding (without mulch) (801-02) | UNIT | 353 | $15.00 | $15.00 | $25.00 | $25.00 |
| 143 | Water (seeding & sodding) (801-03) | MG | 1,775 | $20.00 | $20.00 | $10.00 | $10.00 |
| 144 | Seed (supplemental application) (801-07) | LB | 131 | $15.00 | $15.00 | $5.00 | $5.00 |
| 145 | Fertilizer (supplemental application) (801-08) | TON | 2 | $1,950.00 | $1,950.00 | $400.00 | $400.00 |
| 146 | Cuttings: betula nigra (18IN-24IN) (802-02.29) | EACH | 80 | $10.00 | $10.00 | $10.00 | $10.00 |
| 147 | Cuttings: cornus amomum (18IN-24IN) (802-02.32) | EACH | 80 | $10.00 | $10.00 | $10.00 | $10.00 |
| 148 | Cuttings: alnus serrulata (18IN-24IN) (802-02.37) | EACH | 80 | $10.00 | $10.00 | $10.00 | $10.00 |
| 149 | Cuttings: platanus occidentalis (18IN-24IN) (802-02.38) | EACH | 80 | $10.00 | $10.00 | $10.00 | $10.00 |
| 150 | Cuttings: cephalanthus occidentalis (24-48IN) (802-02.45) | EACH | 80 | $12.00 | $12.00 | $10.00 | $10.00 |
| 151 | Quercus palustris (pin oak 2-5FT CNTNR GRWN) (802-11.37) | EACH | 80 | $75.00 | $75.00 | $65.00 | $65.00 |
| 152 | Quercus phellos (willow oak 2-5FT CNTNR GRWN) (802-11.38) | EACH | 80 | $75.00 | $75.00 | $65.00 | $65.00 |
| 153 | Acer rubrum (red maple seedlng B.R.) (802-12.02) | EACH | 42 | $10.00 | $10.00 | $10.00 | $10.00 |
| 154 | Platanus occidentalis (sycamore seedlng B.R.) (802-12.26) | EACH | 92 | $10.00 | $10.00 | $10.00 | $10.00 |
| 155 | Quercus nigra (water oak seedlng B.R.) (802-12.35) | EACH | 50 | $10.00 | $10.00 | $10.00 | $10.00 |
| 156 | Salix nigra (black willow seedlng B.R.) (802-12.40) | EACH | 42 | $10.00 | $10.00 | $10.00 | $10.00 |
| 157 | Ulmus americana (american elm seedlng B.R.) (802-12.44) | EACH | 42 | $10.00 | $10.00 | $10.00 | $10.00 |
| 158 | Amelanchier arborea ( common serviceberry seedling B.R.) (802-12.67) | EACH | 65 | $10.00 | $10.00 | $10.00 | $10.00 |
| 159 | Cornus amomum (silky dogwood SDLNG bare root) (802-13.54) | EACH | 45 | $10.00 | $10.00 | $10.00 | $10.00 |
| 160 | Amorpha fruticosa (indigobush sdling B.R.) (802-13.65) | EACH | 65 | $10.00 | $10.00 | $10.00 | $10.00 |
| 161 | Sodding (new sod) (803-01) | SY | 164,646 | $3.35 | $4.45 | $4.00 | $4.00 |
| 162 | Turf reinforcement mat (class III) (805-01.03) | SY | 5,791 | $5.35 | $5.35 | $6.50 | $6.50 |
| 163 | Erosion control blanket (type II) (805-12.02) | SY | 32,399 | $1.40 | $1.90 | $1.75 | $1.75 |
| 164 | 700 gram coir fiber erosion blanket (805-12.08) | SY | 613 | $7.00 | $7.00 | $7.50 | $7.50 |
| 165 | Project mowing (806-02.03) | CYCL | 5 | $5,000.00 | $2,800.00 | $12,000 | $12,000 |
| 166 | Class A concrete (box bridges) (604-02.01) | CY | 463 | $825.00 | $890.00 | $800.00 | $850.00 |
| 167 | Steel bar reinforcement (box bridges) (604-02.02) | LB | 93,904 | $1.40 | $1.75 | $1.37 | $1.30 |
| 168 | Dry excavation (bridges) (204-02.01) | CY | 2,643 | $20.00 | $25.00 | $39.00 | $40.00 |
| 169 | Granular backfill (bridges) (303-01.02) | TON | 170 | $70.00 | $95.00 | $62.00 | $50.00 |
| 170 | Steel structures (welded plate girder, 66" web) (602-04.01) | LS | 1 | $4,547,000 | $6,185,215 | $5,200,000 | $7,273,800 |
| 171 | Bearing device (reinforced elastomeric pad, abutments) (602-10.60) | EACH | 16 | $6,000.00 | $5,500.00 | $7,389.00 | $10,000 |
| 172 | Bearing device (plain elastomeric pad, bents) (602-10.61) | EACH | 24 | $6,000.00 | $5,500.00 | $5,976.00 | $12,500 |
| 173 | Epoxy coated reinforcing steel (604-02.03) | LB | 506,622 | $1.60 | $1.95 | $1.57 | $2.00 |
| 174 | Class A concrete (bridges) (604-03.01) | CY | 2,072 | $1,000.00 | $775.00 | $789.00 | $1,200.00 |
| 175 | Steel bar reinforcement (bridges) (604-03.02) | LB | 398,721 | $1.50 | $1.75 | $1.40 | $2.00 |
| 176 | Pavement @ bridge ends (604-03.04) | SY | 440 | $450.00 | $455.00 | $358.00 | $500.00 |
| 177 | Class DS concrete (604-03.32) | CY | 1,468 | $1,500.00 | $990.00 | $960.00 | $1,100.00 |
| 178 | Applied texture finish (new structures) (604-04.01) | SY | 3,521 | $18.00 | $15.00 | $12.00 | $11.50 |
| 179 | Three star state emblem (604-04.41) | EACH | 4 | $1,500.00 | $2,000.00 | $900.00 | $2,514.00 |
| 180 | Bridge deck grooving (mechanical) (604-05.31) | SY | 6,256 | $2.92 | $3.55 | $3.20 | $2.92 |
| 181 | Expansion device (abutments) (604-11.01) | LF | 320 | $1,100.00 | $690.00 | $843.00 | $750.00 |
| 182 | Test piles (steel pipe piles, 14-inch) (606-18.01) | LF | 230 | $150.00 | $225.00 | $137.00 | $200.00 |
| 183 | Loading test (steel pipe piles, 14-inch) (606-18.02) | EACH | 1 | $5,000.00 | $15,100 | $10,146 | $25,000 |
| 184 | Steel pipe piles (14-inch) (606-18.03) | LF | 25,855 | $70.00 | $110.00 | $107.00 | $100.00 |
| 185 | Test piles (steel pipe piles, 16-inch) (606-19.01) | LF | 150 | $160.00 | $255.00 | $151.00 | $150.00 |
| 186 | Loading test (steel pipe piles, 16-inch) (606-19.02) | EACH | 1 | $5,000.00 | $15,100 | $10,146 | $25,000 |
| 187 | Steel pipe piles (16-inch) (606-19.03) | LF | 6,890 | $78.00 | $115.00 | $120.00 | $120.00 |
| 188 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 1,366 | $130.00 | $125.00 | $106.00 | $72.00 |
| 189 | Chain-link fence (bridges) (707-07.01) | SF | 2,076 | $29.00 | $38.00 | $33.00 | $44.50 |
| 190 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 362 | $100.00 | $55.00 | $58.00 | $50.00 |
| 191 | 6" pipe underdrain (710-09.02) | LF | 44 | $20.00 | $55.00 | $7.00 | $25.00 |
| 192 | Pole 35FT class 5 wood (790-02.04) | EACH | 1 | $2,006.00 | $2,090.56 | $2,006.00 | $2,090.50 |
| 193 | Pole 40FT class 4 wood (790-03.03) | EACH | 5 | $2,217.00 | $2,528.93 | $2,217.00 | $2,528.93 |
| 194 | 1PH SGL support 15KV (790-21.04) | EACH | 1 | $325.00 | $321.81 | $325.00 | $321.81 |
| 195 | 1PH DBL primary support 15KV (790-21.05) | EACH | 2 | $347.00 | $397.17 | $347.00 | $397.17 |
| 196 | 1PH primary LG angle 15KV (790-21.07) | EACH | 2 | $690.00 | $599.96 | $690.00 | $599.96 |
| 197 | 1PH primary tap 15KV (790-21.09) | EACH | 1 | $494.00 | $524.57 | $494.00 | $524.57 |
| 198 | Service assembly-pole type (790-31.02) | EACH | 2 | $151.00 | $119.45 | $151.00 | $119.45 |
| 199 | Down guy - through bolt type heavy duty (790-32.02) | EACH | 4 | $516.00 | $411.17 | $516.00 | $411.17 |
| 200 | OH guy - through bolt type (790-32.07) | EACH | 1 | $495.00 | $598.04 | $495.00 | $598.04 |
| 201 | Guy guard (790-32.23) | EACH | 3 | $55.00 | $30.24 | $55.00 | $30.24 |
| 202 | Screw type anchor 10,000LB-12,000LB (790-33.04) | EACH | 3 | $498.00 | $1,010.17 | $498.00 | $1,010.17 |
| 203 | Transfer secondary (790-36.05) | EACH | 2 | $64.00 | $505.03 | $64.00 | $505.03 |
| 204 | Transfer conductor (790-36.14) | EACH | 6 | $150.00 | $382.14 | $150.00 | $382.14 |
| 205 | OH cond 2 7/1 acsr sparate (790-40.02) | LF | 2,016 | $2.31 | $2.90 | $2.31 | $2.90 |
| 206 | 1PH transformer (790-46.01) | EACH | 2 | $4,763.00 | $921.47 | $4,763.00 | $921.47 |
| 207 | 15KVA 1PH OH xformer 7.2KV 120/240 (790-52.04) | EACH | 1 | $4,763.00 | $2,680.15 | $4,763.00 | $2,680.15 |
| 208 | Pole ground rod type (790-68.01) | EACH | 5 | $228.00 | $572.09 | $228.00 | $572.09 |
| 209 | Extension link - epoxy -4FT (790-69.27) | EACH | 5 | $137.00 | $198.57 | $137.00 | $198.57 |
| 210 | Remove wire (790-98.01) | LF | 4,829 | $1.25 | $1.97 | $1.25 | $1.97 |
| 211 | Remove poles (790-98.02) | EACH | 7 | $320.00 | $1,146.97 | $320.00 | $1,146.97 |
| 212 | Remove framing/associated apparatus (790-98.03) | EACH | 27 | $530.00 | $327.71 | $530.00 | $327.71 |
| 213 | 2IN steel gas main (791-01.02) | LF | 800 | $64.00 | $64.00 | $400.00 | $64.00 |
| 214 | 2IN mdpe gas main (791-02.02) | LF | 400 | $28.00 | $28.00 | $185.00 | $28.00 |
| 215 | HDD 2IN PE pipe - unconsolidated (791-04.02) | LF | 50 | $42.00 | $42.00 | $160.00 | $42.00 |
| 216 | HDD 2IN steel pipe - unconsolidated (791-04.20) | LF | 80 | $80.00 | $80.00 | $185.00 | $80.00 |
| 217 | Connect to 2IN EX. PE main (791-06.02) | EACH | 2 | $2,900.00 | $2,900.00 | $5,000.00 | $2,900.00 |
| 218 | Connect to 2IN EX. STL main W/ stopple (791-06.31) | EACH | 2 | $7,000.00 | $7,000.00 | $25,000 | $7,000.00 |
| 220 | Mineral aggregate, type A base, grading D (303-01) | TON | 47,054 | $26.50 | $18.50 | $24.50 | $29.00 |
| 221 | Mineral aggregate (A-CBC) (309-01.01) | TON | 35,051 | $30.80 | $18.50 | $24.50 | $29.00 |
| 222 | Portland cement (A-CBC) (309-01.02) | TON | 1,591 | $372.00 | $475.00 | $475.00 | $367.50 |
| 223 | Bituminous material (A-CBC) (309-02) | TON | 94 | $1,085.00 | $1,250.00 | $1,200.00 | $1,091.10 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.