TDOT contract CNZ182 bid tabulation

The grading, drainage, construction of a concrete i-beam bridge, and paving on u.s. 79 (s.r. 76) for industrial access support serving project mallard (l.m. 1.07 - l.m. 2.05). Let by Tennessee DOT on June 27, 2025, Crockett County. 3 bids received; low bid $17,854,046 by Hal Coffey Contracting LLC.

Owner
Tennessee DOT
Letting
27 JUN 2025
Pay items
166
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hal Coffey Contracting LLC$17,854,046Low
2Delta Contracting Company, LLC$18,319,031+3.0%
3Ford Construction Company$21,367,676+20%
TDOT contract CNZ182: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hal Coffey Contracting LLC2. Delta Contracting Company, LLC3. Ford Construction Company
1Construction stakes, lines and grades (105-01)LS1$185,000$165,000$190,000
2Clearing and grubbing (201-01)LS1$700,000$155,279$250,000
3Removal of structures and obstructions (202-01)LS1$2,500.00$25,000$90,000
4Removal of asphalt pavement (202-03.01)SY9,365$5.50$9.00$6.00
5Removal of structures (exist. BR. ID no. 17SR0760001) (202-04.04)LS1$250,000$50,000$10,000
6Road & drainage excavation (unclassified) (203-01)CY104,003$2.10$5.50$8.00
7Road & drainage excavation (stream mitigation) (203-01.13)CY32,960$14.00$8.00$10.60
8Borrow excavation (unclassified) (203-03)CY276,423$6.25$6.98$10.50
9Select granular material (203-03.10)TON40,903$2.50$35.00$37.00
10Water (203-06)MG2,210$5.50$30.00$35.00
11Furnishing & spreading topsoil (203-07)CY811$8.00$9.00$30.00
12Settlement plate / monitoring device (203-10.05)EACH2$5,500.00$5,000.00$5,000.00
13Foundation fill material (204-08)CY599$90.00$99.00$85.00
14Stream mitigation-log vanes (209-03.34)LF60$89.00$270.00$100.00
15Stream mitigation-log drop structure (209-03.35)LF1,250$147.00$130.00$70.00
16Stream mitigation – wood toe W/reinforced earth (209-03.67)LF1,272$72.00$95.00$100.00
17Protected area marker (white with decal) (209-03.99)EACH45$200.00$125.00$200.00
18Sediment removal (209-05)CY1,078$7.50$9.00$16.00
19Temporary silt fence (with backing) (209-08.02)LF857$5.50$5.50$5.50
20Temporary silt fence (without backing) (209-08.03)LF3,952$1.90$1.90$1.90
21Enhanced silt fence check (V-ditch) (209-08.05)EACH2$750.00$750.00$750.00
22Enhanced rock check dam (209-08.08)EACH9$650.00$1,200.00$1,100.00
23Sandbags (209-09.01)BAG300$3.50$6.00$8.00
24Sediment filter bag (15' X 15') (209-09.03)EACH2$550.00$400.00$1,400.00
25Curb inlet protection (type 4) (209-09.43)EACH24$450.00$450.00$450.00
26Polyethylene sheeting (6 mil. minimum) (209-20.03)SY500$4.00$3.00$6.00
27Catch basin protection (type A) (209-40.30)EACH2$600.00$850.00$600.00
28Catch basin protection (type D) (209-40.33)EACH8$600.00$600.00$600.00
29Catch basin protection (type E) (209-40.34)EACH3$600.00$600.00$600.00
30Catch basin filter assembly(type 1) (209-40.41)EACH1$900.00$900.00$900.00
31Catch basin filter assembly(type 3) (209-40.43)EACH1$900.00$900.00$900.00
32Catch basin filter assembly(type 4) (209-40.44)EACH4$900.00$900.00$900.00
33Catch basin filter assembly(type 6) (209-40.46)EACH15$900.00$900.00$900.00
34Catch basin filter assembly(type 7) (209-40.47)EACH4$900.00$900.00$900.00
35Temporary diversion channel (209-65.03)LF737$25.00$15.00$100.00
36Mineral aggregate, type A base, grading D (303-01)TON28,483$35.00$42.00$40.00
37Granular backfill (roadway) (303-01.01)TON15,976$59.00$42.00$43.00
38Mineral aggregate, type B base, grading (D) (303-02)TON500$45.00$42.00$43.00
39Mineral aggregate (size 57) (303-10.01)TON9,483$15.00$60.00$56.00
40Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON3,416$112.00$126.00$112.00
41Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON3,806$118.00$129.00$118.00
42Bituminous material for prime coat (PC) (402-01)TON45$200.00$300.00$200.00
43Aggregate for cover material (PC) (402-02)TON160$5.00$25.00$5.00
44Bituminous material for tack coat (TC) (403-01)TON17$965.00$300.00$965.00
45Saw cutting asphalt pavement (407-20.05)LF440$5.00$6.00$13.00
46Acs mix(PG64-22) grading D (411-01.10)TON2,121$167.00$164.00$167.00
47Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM0.75$11,000$7,600.00$11,750
48Class A concrete (roadway) (604-01.01)CY1,447$1,050.00$1,050.00$1,350.00
49Steel bar reinforcement (roadway) (604-01.02)LB205,347$1.65$1.15$1.70
50Class A concrete (box bridges) (604-02.01)CY3,187$855.00$625.00$950.00
51Steel bar reinforcement (box bridges) (604-02.02)LB342,141$1.65$1.65$1.80
5218" concrete pipe culvert (class III) (607-03.02)LF1,137$65.00$77.00$105.00
5324" concrete pipe culvert (class III) (607-05.02)LF841$80.00$100.00$130.00
5430" concrete pipe culvert (class III) (607-06.02)LF203$110.00$125.00$140.00
5536" concrete pipe culvert (class III) (607-07.02)LF43$135.00$160.00$150.00
5642" concrete pipe culvert (class III) (607-08.02)LF82$150.00$200.00$155.00
5754" concrete pipe culvert (class III) (607-10.02)LF98$255.00$300.00$215.00
58Manholes, > 12' - 16' depth (611-01.04)EACH1$18,000$11,000$19,000
59Rework manhole (611-01.21)EACH3$3,500.00$2,500.00$8,000.00
60Junction box (see plans) (611-02.16)EACH1$22,000$16,000$25,000
61Class A concrete (pipe endwalls) (611-07.01)CY10$1,500.00$2,000.00$1,900.00
62Steel bar reinforcement (pipe endwalls) (611-07.02)LB405$5.00$2.50$3.50
6324IN endwall (side drain) (611-07.32)EACH1$6,000.00$7,000.00$5,500.00
6430IN endwall (side drain) (611-07.33)EACH1$12,000$13,000$8,800.00
6518IN endwall (cross drain) 6:1 (611-07.56)EACH4$2,800.00$4,000.00$2,000.00
6624IN endwall (cross drain) 3:1 (611-07.57)EACH6$2,800.00$4,000.00$2,200.00
6736IN endwall (cross drain) 6:1 (611-07.65)EACH1$12,000$6,500.00$5,500.00
68Rework catchbasin (611-09.02)EACH1$4,700.00$3,000.00$6,500.00
69Catch basins, type 10, 0' - 4' depth (611-10.01)EACH1$5,500.00$4,500.00$6,200.00
70Catch basins, type 12, 0' - 4' depth (611-12.01)EACH2$5,800.00$5,700.00$6,400.00
71Catch basins, type 12, > 4' - 8' depth (611-12.02)EACH12$7,500.00$6,000.00$7,200.00
72Catch basins, type 14, > 4' - 8' depth (611-14.02)EACH4$10,500$11,000$10,000
73Mobilization (prefabricated vertical drains) (627-01.01)LS1$120,000$71,000$70,000
74Prefabricated vertical drain (627-01.02)LF35,682$2.10$2.10$1.82
75Drainage layer material (627-01.03)CY6,935$48.00$30.00$58.00
76Concrete sidewalk (4 ") (701-01.01)SF22,520$5.00$7.85$5.00
77Concrete curb ramp (701-02.03)SF1,120$17.05$30.00$17.05
78Concrete combined curb & gutter (702-03)CY285$365.75$510.00$365.75
79Portland cement concrete ditch paving (703-01)CY94$500.00$650.00$1,000.00
80Earth pad for type 38 GR end treatment (705-04.09)EACH4$975.00$975.00$975.00
81W beam GR (type 2) MASH TL-3 (705-06.01)LF413$32.75$32.75$32.75
82Tangent energy absorbing term MASH TL-3 (705-06.20)EACH4$3,350.00$3,350.00$3,350.00
83Thrie beam bridge transition MASH TL-3 (705-06.25)EACH4$3,100.00$3,100.00$3,100.00
84High-visibility construction fence (707-08.11)LF518$3.50$3.50$3.50
85Markers (concrete R.O.W. posts) (708-02.01)EACH37$375.00$300.00$375.00
86Machined rip-rap (class A-3) (709-05.05)TON786$49.00$60.00$65.00
87Machined rip-rap (class A-1) (709-05.06)TON754$49.00$60.00$65.00
88Machined rip-rap (class A-2) (709-05.07)TON178$49.00$60.00$65.00
89Machined rip-rap (class B) (709-05.08)TON826$49.00$60.00$65.00
90Traffic control (712-01)LS1$155,000$42,000$50,000
91Interconnected portable barrier rail (712-02.02)LF487$45.00$36.00$35.00
92Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH4$9,500.00$9,200.00$9,483.00
93Flexible drums (channelizing) (712-04.01)EACH40$35.00$35.00$35.00
94Warning lights (type A) (712-05.01)EACH40$25.00$25.00$25.00
95Warning lights (type C) (712-05.03)EACH40$25.00$25.00$25.00
96Signs (construction) (712-06)SF775$7.35$7.35$7.35
97Temporary barricades (type III) (712-07.03)LF240$15.00$15.00$15.00
98Arrow board (type C) (712-08.03)EACH3$1,250.00$1,250.00$1,250.00
99Removable pavement marking (stop line) (712-09.04)LF13$40.00$40.00$40.00
100Removable pavement marking (4" line) (712-09.09)LF911$6.00$6.00$6.00
101Sign post delineation enhancement (713-02.21)LF77$5.50$6.00$5.50
102"U" section steel posts (713-11.01)LB408$4.50$4.00$4.50
103Perforated/knockout square tube post (713-11.02)LB1,148$5.00$4.10$5.00
104Flat sheet aluminum signs (0.080" thick) (713-13.02)SF277$14.50$14.70$14.50
105Flat sheet aluminum signs (0.100" thick) (713-13.03)SF8$15.00$16.00$15.00
106Removal of signs, posts and footings (713-15)LS1$1,250.00$813.00$1,250.00
107Changeable message sign unit (713-16.01)EACH6$5,900.00$6,000.00$5,900.00
108Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH103$62.00$62.00$62.00
109Plastic pavement marking (cross-walk) (716-02.03)LF180$35.00$35.00$35.00
110Plastic pavement marking(channelization striping) (716-02.04)SY77$48.00$48.00$48.00
111Plastic pavement marking (stop line) (716-02.05)LF155$40.00$40.00$40.00
112Plastic pavement marking (turn lane arrow) (716-02.06)EACH9$300.00$300.00$300.00
113Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF54$58.00$58.00$58.00
114Plastic word pavement marking (RXR) (716-03.02)EACH1$2,000.00$2,000.00$2,000.00
115Plastic pavement marking (straight-turn arrow) (716-04.01)EACH5$700.00$700.00$700.00
116Painted pavement marking (4" line) (716-05.01)LM1.38$3,100.00$3,100.00$3,100.00
117Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM3.82$9,500.00$9,500.00$9,500.00
118Mobilization (717-01)LS1$550,000$776,923$450,000
119Geogrid reinforcement type 2 (740-07.04)SY2,118$5.50$8.50$10.00
120Geotextile (type III)(erosion control) (740-10.03)SY2,034$2.50$3.00$5.00
121Geotextile (type IV)(stabilization) (740-10.04)SY17,017$1.50$3.50$5.00
122Temporary sediment tube 24IN (740-11.05)LF518$8.50$8.50$8.50
123Seeding (with mulch) (801-01)UNIT43$45.00$45.00$45.00
124Grass seed mix (ripzn/FLPL) W/mulch (801-01.35)UNIT6$50.00$50.00$50.00
125Seeding (without mulch) (801-02)UNIT95$40.00$40.00$40.00
126Temporary seeding (without mulch) (801-02.08)UNIT95$35.00$35.00$35.00
127Water (seeding & sodding) (801-03)MG715$20.00$20.00$20.00
128Seed (supplemental application) (801-07)LB74$300.00$300.00$300.00
129Cuttings: salix nigra (18IN-24IN length) (802-02.30)EACH140$8.00$8.00$8.00
130Cuttings: salix sericea (18IN-24IN) (802-02.31)EACH140$8.00$8.00$8.00
131Cuttings: cornus amomum (18IN-24IN) (802-02.32)EACH140$8.00$8.00$8.00
132Cuttings: sambucus canadensis (18IN-24IN) (802-02.33)EACH140$8.00$8.00$8.00
133Acer negundo (box elder seedlng B.R.) (802-12.01)EACH510$8.00$8.00$8.00
134Betula nigra (river birch seedlng B.R.) (802-12.07)EACH420$8.00$8.00$8.00
135Diospyros virginiana (persimmon seedlng B.R.) (802-12.14)EACH510$8.00$8.00$8.00
136Fraxinus pennsylvanica (green ash seedlng B.R.) (802-12.16)EACH420$8.00$8.00$8.00
137Juglans nigra (black walnut seedlng B.R.) (802-12.17)EACH90$8.00$8.00$8.00
138Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19)EACH90$8.00$8.00$8.00
139Platanus occidentalis (sycamore seedlng B.R.) (802-12.26)EACH420$8.00$8.00$8.00
140Quercus phellos (willow oak seedlng B.R.) (802-12.38)EACH510$8.00$8.00$8.00
141Carpinus caroliniana (american hornbeam seedling B.R.) (802-12.45)EACH230$8.00$8.00$8.00
142Cornus amomum (silky dogwood SDLNG bare root) (802-13.54)EACH140$8.00$8.00$8.00
143Hamamelis virginiana (witch hazel SDLNG bare root) (802-13.55)EACH90$8.00$8.00$8.00
144Lindera benzoin (spicebush SDLNG bare root) (802-13.59)EACH140$8.00$8.00$8.00
145Sodding (new sod) (803-01)SY78,082$5.00$4.00$4.00
146Erosion control blanket (type II) (805-12.02)SY30,725$2.00$1.60$1.60
147700 gram coir fiber erosion blanket (805-12.08)SY4,000$7.50$7.50$7.50
148CPM project schedule (108-03)LS1$195,000$56,950$70,000
149Dry excavation (bridges) (204-02.01)CY408$35.00$40.00$16.00
150Granular backfill (bridges) (303-01.02)TON36$105.00$125.00$60.00
151Epoxy coated reinforcing steel (604-02.03)LB70,607$1.75$1.80$1.73
152Class A concrete (bridges) (604-03.01)CY330$1,100.00$1,100.00$1,460.00
153Steel bar reinforcement (bridges) (604-03.02)LB58,532$1.75$1.69$1.55
154Pavement @ bridge ends (604-03.04)SY204$650.00$450.00$405.00
155Class D concrete (bridge deck) (604-03.09)CY235$1,250.00$1,500.00$1,275.00
156Applied texture finish (new structures) (604-04.01)SY1,153$12.95$13.99$13.99
157Bridge deck grooving (mechanical) (604-05.31)SY1,050$3.42$7.40$7.40
158Test piles (precast concrete, size 1) (606-09.01)LF230$300.00$200.00$145.00
159Loading test (precast concrete, size 1) (606-09.02)EACH1$15,000$5,000.00$9,600.00
160Precast concrete piles (size 1) (606-09.03)LF3,070$85.00$100.00$117.00
161Pile anchorage system (seismic) (606-12.01)EACH70$550.00$300.00$465.00
162Prestressed concrete I-beam (type III) (615-01.03)LF998$475.00$350.00$400.00
163Conc parapet single slope (STD-1-1SS) (620-05.01)LF472$175.00$160.00$130.00
164Chain-link fence (bridges) (707-07.01)SF775$32.00$32.00$32.00
1656" perforated pipe with vertical drain system (710-09.01)LF146$35.00$50.00$30.00
1666" pipe underdrain (710-09.02)LF32$35.00$25.00$20.00
TDOT contract CNZ182: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy