TDOT contract CN263001 bid tabulation
The miscellaneous safety improvements on various local roads. Let by Tennessee DOT on February 6, 2026, Houston And Stewart Counties. 4 bids received; low bid $287,811 by Mountain Home Construction LLC.
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 27
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mountain Home Construction LLC | $287,811 | Low |
| 2 | Lu, Inc. | $304,449 | +6.0% |
| 3 | Superior Traffic Control, LLC | $308,489 | +7.0% |
| 4 | Vulcan Construction Materials, LLC | $318,110 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mountain Home Construction LLC | 2. Lu, Inc. | 3. Superior Traffic Control, LLC | 4. Vulcan Construction Materials, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Guardrail terminal (type-in-line) (705-04.05) | EACH | 3 | $1,200.00 | $1,080.00 | $2,000.00 | $1,950.00 |
| 2 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 6 | $1,700.00 | $1,800.00 | $1,300.00 | $1,000.00 |
| 3 | Earth pad for guard rail end treatment (705-04.10) | EACH | 3 | $1,000.00 | $1,800.00 | $1,300.00 | $1,000.00 |
| 4 | Guardrail delineation enhancement (705-04.21) | LF | 12,841 | $2.10 | $2.51 | $2.55 | $3.25 |
| 5 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 1,677 | $28.00 | $29.20 | $27.00 | $27.50 |
| 6 | Weak-post guardrail attachment to culvert(MASH TL-3) (705-06.09) | LF | 2 | $150.00 | $483.10 | $450.00 | $1,000.00 |
| 7 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 6 | $3,000.00 | $3,226.80 | $2,000.00 | $2,800.00 |
| 8 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 3 | $2,800.00 | $2,837.40 | $3,400.00 | $2,600.00 |
| 9 | Guardrail removed (706-01) | LF | 1,662 | $1.00 | $1.20 | $1.00 | $1.00 |
| 10 | Traffic control (712-01) | LS | 1 | $6,000.00 | $23,700 | $7,000.00 | $10,800 |
| 11 | Roadside obstacle delineation (713-02.20) | SF | 131 | $5.00 | $7.59 | $15.00 | $22.00 |
| 12 | Sign post delineation enhancement (713-02.21) | LF | 804 | $2.50 | $4.14 | $3.55 | $4.25 |
| 13 | "U" section steel posts (713-11.01) | LB | 1,174 | $2.65 | $3.29 | $3.85 | $3.75 |
| 14 | Perforated/knockout square tube post (713-11.02) | LB | 8,487 | $3.25 | $3.92 | $3.55 | $4.75 |
| 15 | P post slip base (713-11.21) | EACH | 12 | $400.00 | $431.25 | $500.00 | $275.00 |
| 16 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 158 | $9.50 | $9.89 | $12.56 | $13.00 |
| 17 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 2,265 | $9.50 | $10.18 | $13.76 | $14.25 |
| 18 | Remove sign, support & footing (713-15.36) | EACH | 167 | $5.00 | $10.00 | $10.00 | $35.00 |
| 19 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 300 | $25.00 | $18.00 | $25.00 | $18.00 |
| 20 | Plastic pavement marking (stop line) (716-02.05) | LF | 556 | $20.00 | $25.00 | $20.00 | $25.00 |
| 21 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 40 | $45.00 | $55.00 | $45.00 | $55.00 |
| 22 | Plastic word pavement marking (stop ahead) (716-03.03) | EACH | 1 | $900.00 | $550.00 | $900.00 | $550.00 |
| 23 | Plastic word pavement marking (stop) (716-03.07) | EACH | 1 | $650.00 | $400.00 | $650.00 | $400.00 |
| 24 | Plastic pavement marking (noise strip) (716-04.16) | LF | 108 | $20.00 | $16.00 | $20.00 | $16.00 |
| 25 | Painted pavement marking (4" line) (716-05.01) | LM | 53.60 | $1,200.00 | $900.00 | $1,200.00 | $900.00 |
| 26 | Painted pavement marking(4"dotted line) (716-05.21) | LF | 1,755 | $3.00 | $0.25 | $3.00 | $0.25 |
| 27 | Mobilization (717-01) | LS | 1 | $7,000.00 | $3,500.00 | $7,000.00 | $9,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.