Standard Construction Company, Inc.: TDOT bid record
Standard Construction Company, Inc. submitted 32 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 26 JUN 2026, and was the low bidder on 18 of them (56%). When it was not low, its total sat a median +18% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $52,622,510
- Latest bid
- 26 JUN 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 5 | 100% |
| 2020 | 3 | 3 | 100% |
| 2023 | 1 | 1 | 100% |
| 2024 | 2 | 0 | 0% |
| 2025 | 13 | 6 | 46% |
| 2026 | 8 | 3 | 38% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Shelby County | 10 | 2 | 20% |
| Mcnairy County | 4 | 3 | 75% |
| Shelby | 4 | 4 | 100% |
| Hardeman County | 3 | 2 | 67% |
| Fayette County | 3 | 1 | 33% |
| Mcnairy | 2 | 2 | 100% |
| Hardeman | 2 | 2 | 100% |
| Chester And Mcnairy Counties | 1 | 1 | 100% |
| Fayette And Shelby Counties | 1 | 0 | 0% |
| Hardin County | 1 | 0 | 0% |
| Fayette | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removal of asphalt pavement | 202-03.01 | SY | 21 | 12 (57%) | $28.30 | $21.87 |
| Signs (construction) | 712-06 | SF | 22 | 11 (50%) | $6.50 | $8.00 |
| Arrow board (type C) | 712-08.03 | EACH | 17 | 11 (65%) | $997.50 | $1,170.00 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 21 | 7 (33%) | $2,310.00 | $1,400.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 18 | 7 (39%) | $34.50 | $34.50 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 18 | 7 (39%) | $30.30 | $17.30 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 22 | 6 (27%) | $8,702.50 | $7,425.00 |
| Cold planing bituminous pavement | 415-01.01 | TON | 18 | 6 (33%) | $40.25 | $34.00 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 17 | 6 (35%) | $1,850.00 | $1,500.00 |
| Mineral aggregate, type B base, grading (C or D) | 303-02 | TON | 15 | 6 (40%) | $53.00 | $41.50 |
| Warning lights (type C) | 712-05.03 | EACH | 8 | 6 (75%) | $1.05 | $16.24 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 18 | 5 (28%) | $256.25 | $200.68 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lehman-Roberts Company | 18 | 8 of 18 |
| APAC-Tennessee, Inc. | 14 | 9 of 14 |
| Jones Bros. Contractors, LLC | 2 | 1 of 2 |
| Road Worx, Inc. | 1 | 1 of 1 |
| Delta Contracting Company, LLC | 1 | 1 of 1 |
| Asphalt Paving Systems, Inc. | 1 | 1 of 1 |
| Volunteer Bridge Construction, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 JUN 2026 | CN264051 | Mcnairy County | The resurfacing (microsurface or thin mix overlay) on u.s. 45 (s.r. 5) from u.s. 45 (s.r. 15) (l.m. 15.63) to new salem road (l.m. 21.36) | 2 of 2 | $2,706,411 | +42% |
| 08 MAY 2026 | CN264038 | Shelby County | The resurfacing on s.r. 1 in memphis from near danny thomas boulevard (l.m. 3.44) to near tillman street (l.m. 7.82), including bridge repai | 1 of 3 | $4,105,651 | Low, 18% under the second |
| 20 MAR 2026 | CN264025 | Fayette And Shelby Counties | M3-009,79i269-f8-007,79i269-m3-007 the resurfacing on i-269 from s.r. 385 to the shelby county line, and from the fayette county line in she | 2 of 3 | $14,250,158 | 0.0% |
| 20 MAR 2026 | CN264017 | Hardeman County | The resurfacing (using either mill, bm2 and d mix or cir and microsurface) on s.r. 100 from near s.r. 18 (l.m. 15.31) to near firetower road | 2 of 2 | $2,039,834 | +17% |
| 20 MAR 2026 | CN264028 | Hardin County | The resurfacing on s.r. 142 from the mcnairy county line (l.m. 0.00) to s.r. 57 (l.m. 6.35) and on s.r. 69 from u.s. 64 (s.r. 15) (l.m. 22.6 | 3 of 3 | $7,419,397 | +60% |
| 20 MAR 2026 | CN264020 | Mcnairy County | The resurfacing on s.r. 142 from u.s. 45 (s.r. 5) (l.m. 0.00) to near albert robinson road (l.m. 6.10) | 1 of 1 | $3,416,379 | Low |
| 20 MAR 2026 | CN264027 | Shelby County | The resurfacing on i-40 from near sycamore view road (l.m. 16.13) to fletcher creek (l.m. 19.44), including bridge expansion joint repairs | 2 of 3 | $5,894,391 | +1.0% |
| 06 FEB 2026 | CN264014 | Chester And Mcnairy Counties | The resurfacing with cold in-place recycling (microsurface or thin mix overlay) on s.r. 224 from u.s. 64 (s.r. 15) (l.m. 12.15) in mcnairy c | 1 of 1 | $4,335,182 | Low |
| 05 DEC 2025 | CNZ329 | Fayette County | The resurfacing with hot in-place recycling on u.s. 64 (s.r. 15) from near tomlin road (l.m. 8.86) to near woodbridge road (l.m. 15.50), inc | 2 of 2 | $5,308,206 | +12% |
| 05 DEC 2025 | CNZ306 | Mcnairy County | The resurfacing with cold in-place recycling on u.s. 45 (s.r. 5) from s.r. 57 (l.m. 6.00) to u.s. 64 (s.r. 15) (l.m. 11.71), including concr | 1 of 1 | $5,325,644 | Low |
| 03 OCT 2025 | CNZ265 | Shelby County | The resurfacing on i-240 from near s. perkins road (l.m. 12.71) to near park avenue (l.m. 15.00) | 3 of 3 | $4,020,663 | +17% |
| 25 JUL 2025 | CNZ238 | Hardeman County | The resurfacing on u.s. 64 (s.r. 15) from davis way (l.m. 18.65) to lockwood way (l.m. 21.90) | 1 of 1 | $3,266,200 | Low |
| 25 JUL 2025 | CNZ242 | Shelby County | The resurfacing on i-240 from i-40 (l.m. 0.00) to i-55 (l.m. 6.00), including repair work on bridge | 3 of 3 | $13,404,956 | +42% |
| 25 JUL 2025 | CNZ241 | Shelby County | The resurfacing on i-240 from near elvis presley boulevard (l.m. 6.00) to near south perkins road (l.m. 12.72), including repair work on bri | 3 of 3 | $17,609,270 | +34% |
| 27 JUN 2025 | CNZ168 | Fayette County | The resurfacing on s.r. 193 from near s.r. 195 (l.m. 11.00) to s.r. 76 (l.m. 15.68) | 1 of 3 | $1,364,978 | Low, 28% under the second |
| 09 MAY 2025 | CNZ146 | Fayette County | The resurfacing on s.r. 57 from s.r. 194 (l.m. 5.72) to cowan loop (l.m. 20.14), including bridge expansion joint repair and thin epoxy over | 2 of 3 | $3,752,521 | +2.0% |
| 21 MAR 2025 | CNZ115 | Mcnairy County | The resurfacing with cold in-place recycling on u.s. 45 (s.r. 5) from the mississippi state line (l.m. 0.00) to s.r. 57 (l.m. 6.00), and the | 1 of 2 | $5,187,523 | Low, 11% under the second |
| 21 MAR 2025 | CNZ113 | Shelby County | The resurfacing on i-240 from near s.r. 57 (poplar avenue) (l.m. 15.83) to near u.s. 64 (u.s. 70, s.r. 1, summer avenue) (l.m. 19.98), inclu | 3 of 3 | $12,160,475 | +51% |
| 21 MAR 2025 | CNZ084 | Shelby County | The resurfacing on i-40 from near davies plantation road (l.m. 22.84) to the fayette county line (l.m. 30.60) | 3 of 3 | $3,804,988 | +23% |
| 07 FEB 2025 | CNZ010 | Hardeman County | The resurfacing on u.s. 64 (s.r. 15) from walton road (l.m. 9.23) to davis way (l.m. 18.65), including expansion joint repair and thin epoxy | 1 of 1 | $7,116,118 | Low |
| 07 FEB 2025 | CNZ072 | Shelby County | The resurfacing on u.s. 64 (u.s. 70, s.r. 1) from west of lamb road (l.m. 26.00) to near the fayette county line (l.m. 30.00), including bri | 1 of 2 | $3,490,720 | Low, 8.0% under the second |
| 22 MAR 2024 | CNY075 | Shelby County | The resurfacing on u.s. 51 (s.r. 3) from near babe howard boulevard (l.m. 27.59) to the tipton county line (l.m. 33.08) | 2 of 3 | $4,910,623 | +3.0% |
| 09 FEB 2024 | CNY038 | Shelby County | The resurfacing on s.r. 23 from s.r. 57 (l.m. 3.05) to i-240 (l.m. 8.83), including bridge expansion joint repairs and thin epoxy overlay | 3 of 3 | $5,450,084 | +19% |
| 08 DEC 2023 | CNX374 | Shelby | The resurfacing on s.r. 57 from near poplar view parkway (l.m. 18.94) to eastly road (l.m. 21.38) | 1 of 3 | $2,264,343 | Low, 2.0% under the second |
| 26 JUN 2020 | CNU243 | Mcnairy | The resurfacing with hot in-place recycling on s.r. 57 from the ramer city limits (l.m. 12.00) to the hardin county line (l.m. 24.67), inclu | 1 of 1 | $3,040,709 | Low |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.