APAC-Tennessee, Inc.: TDOT bid record
APAC-Tennessee, Inc. submitted 16 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 08 MAY 2026, and was the low bidder on 9 of them (56%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $50,910,284
- Latest bid
- 08 MAY 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 2 | 2 | 100% |
| 2025 | 9 | 5 | 56% |
| 2026 | 3 | 2 | 67% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Shelby County | 11 | 8 | 73% |
| Fayette County | 2 | 0 | 0% |
| Shelby | 2 | 0 | 0% |
| Fayette And Shelby Counties | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trackless tack coat | 403-02.01 | TON | 16 | 16 (100%) | $998.00 | $950.00 |
| Longitudinal joint sealant | 411-01.21 | LM | 14 | 14 (100%) | $1,750.00 | $2,950.00 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 15 | 13 (87%) | $8,989.00 | $7,425.00 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 15 | 12 (80%) | $2,929.00 | $1,400.00 |
| Cold planing bituminous pavement | 415-01.01 | TON | 16 | 11 (69%) | $23.38 | $34.00 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 12 | 11 (92%) | $30.30 | $17.30 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 12 | 11 (92%) | $10.00 | $12.00 |
| Plastic word pavement marking (only) | 716-03.01 | EACH | 12 | 11 (92%) | $301.50 | $300.00 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 12 | 10 (83%) | $300.00 | $200.68 |
| Snowplowable raised pavment markers (mono-dir)(1 color) | 716-01.22 | EACH | 11 | 9 (82%) | $50.00 | $40.00 |
| Saw slot | 730-14.02 | LF | 11 | 9 (82%) | $7.00 | $5.50 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 10 | 9 (90%) | $45.00 | $29.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Lehman-Roberts Company | 16 | 4 of 16 |
| Standard Construction Company, Inc. | 14 | 5 of 14 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAY 2026 | CN264038 | Shelby County | The resurfacing on s.r. 1 in memphis from near danny thomas boulevard (l.m. 3.44) to near tillman street (l.m. 7.82), including bridge repai | 2 of 3 | $4,851,736 | +18% |
| 20 MAR 2026 | CN264025 | Fayette And Shelby Counties | M3-009,79i269-f8-007,79i269-m3-007 the resurfacing on i-269 from s.r. 385 to the shelby county line, and from the fayette county line in she | 1 of 3 | $14,210,642 | Low, 0.0% under the second |
| 20 MAR 2026 | CN264027 | Shelby County | The resurfacing on i-40 from near sycamore view road (l.m. 16.13) to fletcher creek (l.m. 19.44), including bridge expansion joint repairs | 1 of 3 | $5,846,264 | Low, 1.0% under the second |
| 05 DEC 2025 | CNZ325 | Shelby County | The resurfacing on u.s. 51 (s.r. 3, s. bellevue boulevard) from heistan place (l.m. 8.98) to u.s. 64 (u.s. 70, s.r. 23, union ave) (l.m. 9.9 | 1 of 2 | $1,156,808 | Low, 2.0% under the second |
| 03 OCT 2025 | CNZ265 | Shelby County | The resurfacing on i-240 from near s. perkins road (l.m. 12.71) to near park avenue (l.m. 15.00) | 1 of 3 | $3,436,910 | Low, 10% under the second |
| 03 OCT 2025 | CNZ264 | Shelby County | The resurfacing on i-55 from near mill branch road (l.m. 3.56) to i-240 (l.m. 5.74), including bridge expansion joint repairs and thin epoxy | 1 of 2 | $5,733,000 | Low, 32% under the second |
| 25 JUL 2025 | CNZ242 | Shelby County | The resurfacing on i-240 from i-40 (l.m. 0.00) to i-55 (l.m. 6.00), including repair work on bridge | 2 of 3 | $9,823,322 | +4.0% |
| 25 JUL 2025 | CNZ241 | Shelby County | The resurfacing on i-240 from near elvis presley boulevard (l.m. 6.00) to near south perkins road (l.m. 12.72), including repair work on bri | 2 of 3 | $13,705,130 | +5.0% |
| 27 JUN 2025 | CNZ168 | Fayette County | The resurfacing on s.r. 193 from near s.r. 195 (l.m. 11.00) to s.r. 76 (l.m. 15.68) | 2 of 3 | $1,750,000 | +28% |
| 09 MAY 2025 | CNZ146 | Fayette County | The resurfacing on s.r. 57 from s.r. 194 (l.m. 5.72) to cowan loop (l.m. 20.14), including bridge expansion joint repair and thin epoxy over | 3 of 3 | $4,157,316 | +13% |
| 21 MAR 2025 | CNZ113 | Shelby County | The resurfacing on i-240 from near s.r. 57 (poplar avenue) (l.m. 15.83) to near u.s. 64 (u.s. 70, s.r. 1, summer avenue) (l.m. 19.98), inclu | 1 of 3 | $8,079,252 | Low, 5.0% under the second |
| 21 MAR 2025 | CNZ084 | Shelby County | The resurfacing on i-40 from near davies plantation road (l.m. 22.84) to the fayette county line (l.m. 30.60) | 1 of 3 | $3,083,730 | Low, 8.0% under the second |
| 22 MAR 2024 | CNY075 | Shelby County | The resurfacing on u.s. 51 (s.r. 3) from near babe howard boulevard (l.m. 27.59) to the tipton county line (l.m. 33.08) | 1 of 3 | $4,775,847 | Low, 3.0% under the second |
| 09 FEB 2024 | CNY038 | Shelby County | The resurfacing on s.r. 23 from s.r. 57 (l.m. 3.05) to i-240 (l.m. 8.83), including bridge expansion joint repairs and thin epoxy overlay | 1 of 3 | $4,587,833 | Low, 1.0% under the second |
| 08 DEC 2023 | CNX374 | Shelby | The resurfacing on s.r. 57 from near poplar view parkway (l.m. 18.94) to eastly road (l.m. 21.38) | 3 of 3 | $2,748,877 | +21% |
| 09 FEB 2018 | CNS074 | Shelby | The resurfacing on s.r. 57 from i-240 (l.m. 8.18) to east of val verde drive (l.m. 10.75) | 2 of 3 | $1,974,533 | +11% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.