TDOT contract CNZ241 bid tabulation
The resurfacing on i-240 from near elvis presley boulevard (l.m. 6.00) to near south perkins road (l.m. 12.72), including repair work on bridge. Let by Tennessee DOT on July 25, 2025, Shelby County. 3 bids received; low bid $13,108,251 by Lehman-Roberts Company.
- Owner
- Tennessee DOT
- Letting
- 25 JUL 2025
- Pay items
- 73
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lehman-Roberts Company | $13,108,251 | Low |
| 2 | APAC-Tennessee, Inc. | $13,705,130 | +5.0% |
| 3 | Standard Construction Company, Inc. | $17,609,270 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lehman-Roberts Company | 2. APAC-Tennessee, Inc. | 3. Standard Construction Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 45 | $93.40 | $91.26 | $94.50 |
| 2 | Removal of asphalt pavement (202-03.01) | SY | 11,467 | $15.12 | $20.00 | $34.30 |
| 3 | Water (203-06) | MG | 26 | $377.33 | $5.00 | $300.00 |
| 4 | Brooming & degrassing shoulders (208-01.05) | LM | 32.24 | $1,182.17 | $600.00 | $3,500.00 |
| 5 | Mineral aggregate, type B base, grading (C or D) (303-02) | TON | 3,409 | $59.73 | $64.75 | $64.80 |
| 6 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading A (307-03.01) | TON | 614 | $210.50 | $188.00 | $325.00 |
| 7 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 1,611 | $154.35 | $210.00 | $350.00 |
| 8 | Trackless tack coat (403-02.01) | TON | 294 | $1,297.01 | $1,000.00 | $1,350.00 |
| 9 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 11,442 | $125.94 | $144.00 | $170.75 |
| 10 | Longitudinal joint sealant (411-01.21) | LM | 63.34 | $3,353.96 | $1,100.00 | $3,250.00 |
| 11 | Acs mix(PG76-22) grading D (411-03.10) | TON | 33,886 | $146.65 | $164.00 | $182.00 |
| 12 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 24.46 | $1,458.02 | $1,400.00 | $798.00 |
| 13 | Cold planing bituminous pavement (415-01.01) | TON | 43,794 | $44.27 | $23.00 | $72.15 |
| 14 | Concrete sidewalk (4 ") (701-01.01) | SF | 405 | $16.60 | $16.23 | $16.80 |
| 15 | Concrete curb ramp (retrofit) (701-02.01) | SF | 2,974 | $46.70 | $45.63 | $47.25 |
| 16 | Detectable warning surface (rehabilitation) (701-02.06) | SF | 144 | $98.58 | $96.33 | $99.75 |
| 17 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 7 | $259.43 | $253.75 | $262.50 |
| 18 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 7 | $1,841.98 | $1,801.63 | $1,863.75 |
| 19 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 7 | $3,995.28 | $3,907.75 | $4,042.50 |
| 20 | Truck mounted energy attenuator (705-07.11) | EACH | 4 | $8,997.17 | $8,373.75 | $25,000 |
| 21 | Guardrail removed (706-01) | LF | 350 | $8.30 | $8.12 | $8.40 |
| 22 | Traffic control (712-01) | LS | 1 | $325,000 | $975,000 | $795,000 |
| 23 | Flexible drums (channelizing) (712-04.01) | EACH | 350 | $37.05 | $30.45 | $43.05 |
| 24 | Warning lights (type A) (712-05.01) | EACH | 300 | $15.88 | $15.23 | $1.05 |
| 25 | Warning lights (type C) (712-05.03) | EACH | 50 | $15.88 | $15.23 | $1.05 |
| 26 | Signs (construction) (712-06) | SF | 2,415 | $7.41 | $6.09 | $6.50 |
| 27 | Signs (construction)(reduced speed warning) (712-06.16) | EACH | 4 | $529.25 | $507.50 | $525.00 |
| 28 | Arrow board (type C) (712-08.03) | EACH | 4 | $1,587.74 | $1,552.50 | $1,207.50 |
| 29 | Speed feedback sign assembly (712-08.08) | EACH | 4 | $3,704.72 | $2,537.50 | $3,622.50 |
| 30 | Digital speed limit sign assembly (712-08.09) | EACH | 12 | $5,821.70 | $4,973.50 | $3,832.50 |
| 31 | Mobile message sign unit W/attenuator (712-08.10) | HR | 320 | $58.22 | $123.50 | $99.75 |
| 32 | Queue protection truck (712-08.12) | DAY | 228 | $132.31 | $938.88 | $1,050.00 |
| 33 | Changeable message sign unit (713-16.01) | EACH | 2 | $5,287.16 | $5,069.93 | $4,830.00 |
| 34 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 266 | $52.92 | $50.50 | $52.50 |
| 35 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 2,973 | $52.92 | $50.50 | $52.50 |
| 36 | Removal of snowplowable reflective marker (716-01.30) | EACH | 2,204 | $12.58 | $10.00 | $33.00 |
| 37 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 29 | $50.81 | $48.48 | $50.40 |
| 38 | Plastic pavement marking (stop line) (716-02.05) | LF | 314 | $31.75 | $30.30 | $31.50 |
| 39 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 24 | $317.55 | $303.00 | $315.00 |
| 40 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 5,235 | $31.75 | $30.30 | $31.50 |
| 41 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 260 | $4.23 | $4.04 | $4.20 |
| 42 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 599 | $53.98 | $51.51 | $53.55 |
| 43 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.13 | $23,287 | $22,220 | $23,100 |
| 44 | Plastic word pavement marking (only) (716-03.01) | EACH | 16 | $317.55 | $303.00 | $315.00 |
| 45 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 7 | $317.55 | $303.00 | $315.00 |
| 46 | Plastic pavement marking (wrong way arrow) (716-04.06) | EACH | 9 | $476.32 | $454.50 | $472.50 |
| 47 | Plastic pavement marking (exit only arrow) (716-04.07) | EACH | 20 | $476.32 | $454.50 | $472.50 |
| 48 | Plastic pavement marking (option lane arrow) (716-04.08) | EACH | 12 | $476.32 | $454.50 | $472.50 |
| 49 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 2 | $529.25 | $505.00 | $525.00 |
| 50 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 10,697 | $1.32 | $1.27 | $1.35 |
| 51 | Painted pavement marking (stop line) (716-05.05) | LF | 314 | $16.94 | $16.16 | $16.80 |
| 52 | Painted pavement marking (6" line) (716-05.20) | LM | 57.93 | $2,752.08 | $2,626.00 | $2,730.00 |
| 53 | Painted pavement marking (longitudinal cross-walk) (716-05.22) | LF | 461 | $31.75 | $30.30 | $31.50 |
| 54 | Painted pavement markings(8" line) (716-05.49) | LM | 0.13 | $6,986.04 | $6,666.00 | $6,930.00 |
| 55 | Painted pavement markings(12" line) (716-05.51) | LF | 14,803 | $5.29 | $5.05 | $5.25 |
| 56 | Removal of pavement marking (line) (716-08.01) | LF | 8,570 | $2.12 | $2.02 | $2.10 |
| 57 | Removal of pavement marking (cross-walk) (716-08.03) | LF | 216 | $19.05 | $18.18 | $18.90 |
| 58 | Removal of pavement marking (stop line) (716-08.05) | LF | 92 | $23.29 | $22.22 | $23.10 |
| 59 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 15 | $185.24 | $176.75 | $183.75 |
| 60 | Removal of word pavement marking (only) (716-08.11) | EACH | 9 | $211.70 | $202.00 | $210.00 |
| 61 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 57.93 | $9,420.57 | $8,989.00 | $9,345.00 |
| 62 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 10,697 | $3.70 | $3.54 | $3.70 |
| 63 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 11,936 | $3.70 | $3.54 | $3.70 |
| 64 | Enhanced flat line thermo (12IN dotted) (716-12.10) | LF | 12,151 | $11.64 | $11.11 | $11.55 |
| 65 | Mobilization (717-01) | LS | 1 | $540,000 | $690,000 | $715,000 |
| 66 | Install pull box (type A) (730-03.20) | EACH | 6 | $2,594.34 | $669.50 | $2,625.00 |
| 67 | Conduit 1" diameter (PVC schedule 40) (730-12.01) | LF | 90 | $31.13 | $10.30 | $31.50 |
| 68 | Saw slot (730-14.02) | LF | 1,250 | $9.34 | $6.18 | $9.45 |
| 69 | Loop wire (730-14.03) | LF | 4,250 | $2.08 | $1.03 | $2.10 |
| 70 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 25 | $1,624.58 | $757.50 | $1,015.00 |
| 71 | Concrete repairs (604-10.53) | SY | 15 | $1,624.58 | $1,212.00 | $1,210.00 |
| 72 | Bridge deck sealant (617-01) | SY | 4,396 | $55.03 | $51.00 | $46.80 |
| 73 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 4,514 | $35.49 | $37.63 | $35.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of July 25, 2025. Compiled by Mirage Metrics.