TDOT contract CNZ264 bid tabulation

The resurfacing on i-55 from near mill branch road (l.m. 3.56) to i-240 (l.m. 5.74), including bridge expansion joint repairs and thin epoxy overlay. Let by Tennessee DOT on October 3, 2025, Shelby County. 2 bids received; low bid $5,733,000 by APAC-Tennessee, Inc..

Owner
Tennessee DOT
Letting
03 OCT 2025
Pay items
51
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1APAC-Tennessee, Inc.$5,733,000Low
2Lehman-Roberts Company$7,550,041+32%
TDOT contract CNZ264: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. APAC-Tennessee, Inc.2. Lehman-Roberts Company
1Removal of asphalt pavement (202-03.01)SY1,607$43.00$62.20
2Water (203-06)MG3$346.64$19.95
3Brooming & degrassing shoulders (208-01.05)LM4.70$1,700.00$3,195.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON391$79.00$108.85
5Asphalt concrete mix (PG76-22) (BPMB-HM) grading A (307-03.01)TON739$220.00$200.00
6Trackless tack coat (403-02.01)TON91$681.00$1,395.00
7Acs mix (PG64-22) grading E shoulder (411-01.07)TON2,692$164.50$157.50
8Longitudinal joint sealant (411-01.21)LM20.20$2,750.00$3,778.82
9Acs mix(PG76-22) grading D (411-03.10)TON11,137$164.00$160.00
10Scoring shoulders (continuous) (16IN width) (411-12.01)LM8.20$3,010.00$2,860.32
11Cold planing bituminous pavement (415-01.01)TON13,699$23.00$40.00
12Traffic control (712-01)LS1$370,500$775,000
13Flexible drums (channelizing) (712-04.01)EACH1,098.68$40.60$43.62
14Warning lights (type A) (712-05.01)EACH333$16.24$17.45
15Warning lights (type C) (712-05.03)EACH242$16.24$17.45
16Signs (construction) (712-06)SF2,886$10.15$10.90
17Signs (construction)(reduced speed warning) (712-06.16)EACH4$502.43$539.78
18Arrow board (type C) (712-08.03)EACH8$1,522.50$1,635.69
19Speed feedback sign assembly (712-08.08)EACH2$4,567.50$4,907.07
20Digital speed limit sign assembly (712-08.09)EACH13$5,582.50$5,997.52
21Queue protection truck (712-08.12)DAY46$812.00$872.37
22Changeable message sign unit (713-16.01)EACH6$5,070.00$5,446.84
23Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH28$50.50$53.98
24Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH1,550$50.50$53.98
25Removal of snowplowable reflective marker (716-01.30)EACH1,476$12.00$18.65
26Plastic pavement marking (stop line) (716-02.05)LF24$50.50$53.98
27Plastic pavement marking (turn lane arrow) (716-02.06)EACH2$353.50$377.88
28Plastic pavement marking (24" barrier line) (716-02.07)LF2,779$30.30$32.39
29Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF41$51.51$55.06
30Plastic word pavement marking (only) (716-03.01)EACH2$505.00$539.83
31Plastic pavement marking (straight-turn arrow) (716-04.01)EACH10$505.00$539.83
32Plastic pavement marking (transverse shoulder) (716-04.04)LF334$17.17$18.35
33Plastic pavement marking (straight arrow) (716-04.05)EACH3$505.00$539.83
34Plastic pavement marking (wrong way arrow) (716-04.06)EACH1$505.00$539.83
35Plastic pavement marking (exit only arrow) (716-04.07)EACH6$505.00$539.83
36Plastic pavement marking (H.O.V. diamond) (716-04.09)EACH14$328.25$350.89
37Plastic pavement marking (lane reduction arrow) (716-04.14)EACH1$505.00$539.83
38Painted pavement marking (6" line) (716-05.20)LM17.20$3,939.00$4,210.68
39Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM15.50$9,393.00$10,041
40Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03)LF8,786$4.04$4.32
41Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF1,084$4.04$4.32
42Enhanced flat line thermo (12IN barrier line) (716-12.08)LF2,148$15.15$16.19
43Enhanced flat line thermo (12IN dotted) (716-12.10)LF8,719$15.15$16.19
44Mobilization (717-01)LS1$215,000$750,000
45Conduit 2" diameter (PVC schedule 40) (730-12.02)LF30$30.60$48.58
46Saw slot (730-14.02)LF425$8.16$21.59
47Loop wire (730-14.03)LF810$2.04$2.16
48Expansion joint repairs (604-10.44)LF1,296$221.27$559.18
49Bridge deck repairs (partial depth of slab) (604-10.50)SY5$1,078.95$898.08
50Concrete repairs (604-10.53)SY58$1,150.00$898.08
51Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY26,905$33.90$37.28
TDOT contract CNZ264: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy