TDOT contract CNZ146 bid tabulation

The resurfacing on s.r. 57 from s.r. 194 (l.m. 5.72) to cowan loop (l.m. 20.14), including bridge expansion joint repair and thin epoxy overlay. Let by Tennessee DOT on May 9, 2025, Fayette County. 3 bids received; low bid $3,677,567 by Lehman-Roberts Company.

Owner
Tennessee DOT
Letting
09 MAY 2025
Pay items
43
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lehman-Roberts Company$3,677,567Low
2Standard Construction Company, Inc.$3,752,521+2.0%
3APAC-Tennessee, Inc.$4,157,316+13%
TDOT contract CNZ146: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lehman-Roberts Company2. Standard Construction Company, Inc.3. APAC-Tennessee, Inc.
1Removal of asphalt pavement (202-03.01)SY428$48.50$35.00$61.00
2Water (203-06)MG22$296.75$30.00$27.00
3Brooming & degrassing shoulders (208-01.05)LM28.40$2,096.75$1,775.00$1,280.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON2,863$52.65$48.00$65.30
5Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON148$221.35$285.00$316.00
6Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON366$132.75$270.00$307.50
7Trackless tack coat (403-02.01)TON66$1,215.50$1,250.00$1,055.00
8Acs mix(PG64-22) thin lift D asphalt (411-03.12)TON8,944$124.50$142.00$163.00
9Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM23$533.80$536.00$1,235.00
10Asphalt emulsion (scrub seal) (414-04.03)TON267$1,370.50$1,345.00$1,424.00
11Mineral aggregate (scrub seal) (414-04.04)TON2,204$80.75$79.00$84.00
12Cold planing bituminous pavement (415-01.01)TON572$141.40$68.00$200.00
13Guardrail transition 27IN to 31IN (705-02.10)EACH15$116.95$118.00$117.00
14Earth pad for type 38 GR end treatment (705-04.09)EACH15$965.90$975.00$965.00
15GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH2$1,321.75$1,335.00$1,320.00
16GR terminal (in-inline) MASH TL-3 (705-06.11)EACH2$1,016.75$1,025.00$1,015.00
17Tangent energy absorbing term MASH TL-3 (705-06.20)EACH11$3,355.25$3,375.00$3,350.00
18GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH2$3,151.90$3,175.00$3,150.00
19Guardrail removed (706-01)LF700$6.10$6.15$6.10
20Radius rail (706-06.03)LF40$44.75$45.25$45.00
21Traffic control (712-01)LS1$195,000$170,000$122,000
22Flexible drums (channelizing) (712-04.01)EACH155$49.85$8.20$50.00
23Signs (construction) (712-06)SF1,712$10.20$7.30$10.15
24Truck mounted impact attenuator (W/flashing arrow board) (713-16.02)EACH2$203.35$18,000$10,000
25Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH931$51.85$51.25$50.00
26Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH18$51.85$51.25$50.00
27Removal of snowplowable reflective marker (716-01.30)EACH399$45.10$11.00$15.00
28Plastic pavement marking(channelization striping) (716-02.04)SY259$46.70$46.25$45.00
29Plastic pavement marking (stop line) (716-02.05)LF700$29.05$28.70$28.00
30Plastic pavement marking (turn lane arrow) (716-02.06)EACH5$233.35$230.00$225.00
31Plastic pavement marking (8IN line) (716-02.12)LM0.10$22,820$22,600$22,000
32Plastic word pavement marking (only) (716-03.01)EACH2$243.70$241.00$235.00
33Plastic pavement marking (transverse shoulder) (716-04.04)LF1,074$15.60$15.35$15.00
34Plastic pavement marking (yield line) (716-04.12)SF12$37.35$36.90$36.00
35Painted pavement marking (6" line) (716-05.20)LM46.30$2,178.00$2,150.00$2,100.00
36Removal of pavement marking (channelization striping) (716-08.04)SY60$36.30$35.90$35.00
37Removal of pavement marking (turn lane arrow) (716-08.06)EACH5$181.50$179.00$175.00
38Removal of word pavement marking (only) (716-08.11)EACH2$1,037.10$1,025.00$1,000.00
39Removal of pavement marking (line) (716-08.20)LM46.30$856.25$1,250.00$2,350.00
40Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM46.30$7,985.50$7,900.00$7,700.00
41Mobilization (717-01)LS1$158,000$132,000$194,000
42Expansion joint repairs (604-10.44)LF173$401.65$265.00$261.00
43Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY10,903$34.25$33.80$33.33
TDOT contract CNZ146: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy