TDOT contract CN264038 bid tabulation

The resurfacing on s.r. 1 in memphis from near danny thomas boulevard (l.m. 3.44) to near tillman street (l.m. 7.82), including bridge repair work. Let by Tennessee DOT on May 8, 2026, Shelby County. 3 bids received; low bid $4,105,651 by Standard Construction Company, Inc..

Owner
Tennessee DOT
Letting
08 MAY 2026
Pay items
33
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Standard Construction Company, Inc.$4,105,651Low
2APAC-Tennessee, Inc.$4,851,736+18%
3Lehman-Roberts Company$5,489,604+34%
TDOT contract CN264038: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Standard Construction Company, Inc.2. APAC-Tennessee, Inc.3. Lehman-Roberts Company
1Removal of asphalt pavement (202-03.01)SY1,000$50.00$30.00$37.88
2Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON230$335.00$232.00$313.69
3Trackless tack coat (403-02.01)TON81$1,150.00$975.00$1,416.83
4Longitudinal joint sealant (411-01.21)LM17$3,723.00$1,900.00$4,058.49
5Acs mix(PG70-22) grading D (411-02.10)TON12,375$158.00$189.00$190.74
6Cold planing bituminous pavement (415-01.01)TON12,259$28.10$48.50$62.95
7Gray iron castings (catchbasin) (611-03.04)LB19,250$7.40$9.90$11.12
8Guardrail transition 27IN to 31IN (705-02.10)EACH1$306.00$100.00$1,100.91
9GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH1$3,468.00$6,000.00$6,605.44
10Guardrail removed (706-01)LF25$2.05$5.00$5.50
11Traffic control (712-01)LS1$150,000$200,000$288,024
12Flexible drums (channelizing) (712-04.01)EACH92$25.50$45.00$49.54
13Signs (construction) (712-06)SF2,810$5.85$7.00$7.71
14Arrow board (type C) (712-08.03)EACH4$816.00$1,850.00$2,036.68
15Changeable message sign unit (713-16.01)EACH2$3,570.00$4,200.00$4,623.81
16Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH320$51.00$50.00$55.05
17Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH700$51.00$50.00$55.05
18Plastic pavement marking(channelization striping) (716-02.04)SY335$40.80$40.00$44.04
19Plastic pavement marking (stop line) (716-02.05)LF2,130$30.60$30.00$33.03
20Plastic pavement marking (turn lane arrow) (716-02.06)EACH77$306.00$300.00$330.27
21Plastic pavement marking (8" dotted line) (716-02.08)LF600$4.10$4.00$4.40
22Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF3,080$53.05$52.00$57.25
23Plastic pavement marking (6" dotted line) (716-02.11)LF705$4.10$4.00$4.40
24Plastic pavement marking (8IN line) (716-02.12)LM1.20$21,542$21,120$23,251
25Plastic word pavement marking (only) (716-03.01)EACH65$306.00$300.00$330.27
26Plastic pavement marking (bikelane symbol & arrow) (716-04.13)EACH12$469.20$460.00$506.42
27Painted pavement marking (stop line) (716-05.05)LF2,130$18.35$18.00$19.82
28Painted pavement marking (6" line) (716-05.20)LM35$3,570.00$3,500.00$3,853.17
29Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM35$9,486.00$9,300.00$10,238
30Mobilization (717-01)LS1$139,000$250,000$265,784
31Expansion joint repairs (604-10.44)LF183$240.70$236.00$504.22
32Concrete repairs (604-10.53)SY65$306.00$300.00$1,367.33
33Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY3,145$39.25$38.50$39.30
TDOT contract CN264038: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy