TDOT contract CNZ072 bid tabulation

The resurfacing on u.s. 64 (u.s. 70, s.r. 1) from west of lamb road (l.m. 26.00) to near the fayette county line (l.m. 30.00), including bridge expansion joint repairs and thin epoxy overlay. Let by Tennessee DOT on February 7, 2025, Shelby County. 2 bids received; low bid $3,490,720 by Standard Construction Company, Inc..

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
44
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Standard Construction Company, Inc.$3,490,720Low
2Lehman-Roberts Company$3,765,083+8.0%
TDOT contract CNZ072: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Standard Construction Company, Inc.2. Lehman-Roberts Company
1Removal of asphalt pavement (202-03.01)SY5,313$15.50$23.00
2Water (203-06)MG28$15.00$250.00
3Brooming & degrassing shoulders (208-01.05)LM10.50$1,380.00$3,450.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON3,731$46.00$33.75
5Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON2,444$145.00$130.00
6High performance fog seals (403-01.10)SY1,250$10.10$10.50
7Trackless tack coat (403-02.01)TON59$1,210.00$1,300.00
8Longitudinal joint sealant (411-01.21)LM12.50$2,020.00$2,050.00
9Acs mix(PG70-22) grading D (411-02.10)TON11,322$135.00$142.50
10Crack sealant (411-04)LB500$12.10$12.50
11Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM1.60$737.30$1,160.00
12Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM3.40$737.30$1,160.00
13Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM4$737.30$1,160.00
14Cold planing bituminous pavement (415-01.01)TON10,524$26.00$23.75
15Guardrail transition 27IN to 31IN (705-02.10)EACH16$136.35$139.00
16Earth pad for type 38 GR end treatment (705-04.09)EACH11$944.35$970.00
17GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH5$1,408.95$1,425.00
18Tangent energy absorbing term MASH TL-3 (705-06.20)EACH11$3,333.00$3,360.00
19Guardrail removed (706-01)LF800$4.05$4.50
20Traffic control (712-01)LS1$161,070$175,000
21Flexible drums (channelizing) (712-04.01)EACH100$24.25$56.00
22Signs (construction) (712-06)SF1,873$7.15$13.50
23Arrow board (type C) (712-08.03)EACH2$1,262.50$1,780.00
24Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH324$50.50$51.50
25Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH332$50.50$51.50
26Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH170$50.50$51.50
27Plastic pavement marking(channelization striping) (716-02.04)SY760$44.45$45.50
28Plastic pavement marking (stop line) (716-02.05)LF758$25.25$26.00
29Plastic pavement marking (turn lane arrow) (716-02.06)EACH40$227.25$232.00
30Plastic pavement marking (24" barrier line) (716-02.07)LF475$25.25$26.00
31Plastic pavement marking (8" dotted line) (716-02.08)LF1,561$4.00$4.50
32Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF506$51.50$52.50
33Plastic pavement marking (8IN line) (716-02.12)LM0.50$16,160$16,500
34Plastic word pavement marking (only) (716-03.01)EACH2$237.35$250.00
35Plastic word pavement marking (signal ahead) (716-03.06)EACH4$1,212.00$1,250.00
36Painted pavement marking (6" line) (716-05.20)LM17$2,424.00$2,475.00
37Removal of pavement marking (channelization striping) (716-08.04)SY626$25.25$26.00
38Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM17.40$8,989.00$9,150.00
39Mobilization (717-01)LS1$109,840$222,500
40Saw slot (730-14.02)LF2,974$8.10$8.25
41Loop wire (730-14.03)LF6,748$2.05$2.10
42Expansion joint repairs (604-10.44)LF406$111.10$336.00
43Concrete repairs (604-10.53)SY8$1,515.00$665.00
44Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY2,836$43.95$36.75
TDOT contract CNZ072: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy