TDOT contract CNZ010 bid tabulation

The resurfacing on u.s. 64 (s.r. 15) from walton road (l.m. 9.23) to davis way (l.m. 18.65), including expansion joint repair and thin epoxy overlay. Let by Tennessee DOT on February 7, 2025, Hardeman County. 1 bid received; low bid $7,116,118 by Standard Construction Company, Inc..

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
54
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Standard Construction Company, Inc.$7,116,118Low
TDOT contract CNZ010: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Standard Construction Company, Inc.
1Removal of asphalt pavement (202-03.01)SY706$44.00
2Water (203-06)MG20$20.00
3Brooming & degrassing shoulders (208-01.05)LM13.10$1,380.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON2,327$48.00
5Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON325$210.00
6Trackless tack coat (403-02.01)TON145$1,000.00
7Longitudinal joint sealant (411-01.21)LM33.90$2,785.00
8Acs mix(PG70-22) grading D (411-02.10)TON23,641$135.00
9Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM10.50$661.50
10Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM1.94$661.50
11Cold planing bituminous pavement (415-01.01)TON22,991$30.00
12Gray iron castings (catchbasin) (611-03.04)LB13,750$6.50
13Adjustment of existing catchbasin (611-09.01)EACH2$4,800.00
14Guardrail transition 27IN to 31IN (705-02.10)EACH13$137.70
15Earth pad for type 38 GR end treatment (705-04.09)EACH12$953.70
16GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH7$1,326.00
17Tangent energy absorbing term MASH TL-3 (705-06.20)EACH4$3,468.00
18GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH2$3,162.00
19Guardrail removed (706-01)LF650$5.10
20Traffic control (712-01)LS1$252,420
21Flexible drums (channelizing) (712-04.01)EACH198$31.60
22Warning lights (type A) (712-05.01)EACH68$15.30
23Warning lights (type C) (712-05.03)EACH80$1.05
24Signs (construction) (712-06)SF5,512$7.30
25Arrow board (type C) (712-08.03)EACH3$1,300.50
26Changeable message sign unit (713-16.01)EACH2$5,916.00
27Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH853$44.85
28Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH785$44.85
29Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH286$44.85
30Removal of snowplowable reflective marker (716-01.30)EACH667$18.00
31Plastic pavement marking(channelization striping) (716-02.04)SY104$36.75
32Plastic pavement marking (stop line) (716-02.05)LF1,036$18.35
33Plastic pavement marking (turn lane arrow) (716-02.06)EACH90$214.20
34Plastic pavement marking (8" dotted line) (716-02.08)LF300$4.10
35Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF2,083$52.00
36Plastic word pavement marking (only) (716-03.01)EACH18$234.60
37Plastic word pavement marking (signal ahead) (716-03.06)EACH4$1,122.00
38Plastic pavement marking (straight-turn arrow) (716-04.01)EACH3$408.00
39Plastic pavement marking (transverse shoulder) (716-04.04)LF424$10.20
40Plastic pavement marking (straight arrow) (716-04.05)EACH1$214.20
41Plastic pavement marking (yield line) (716-04.12)SF40$30.60
42Plastic pavement marking (lane reduction arrow) (716-04.14)EACH2$423.30
43Painted pavement marking (parking line) (716-05.08)LF415$7.50
44Painted pavement marking (6" line) (716-05.20)LM80$1,938.00
45Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM40$7,532.70
46Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03)LF2,292$3.05
47Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF360$4.10
48Mobilization (717-01)LS1$125,323
49Conduit 1" diameter (PVC schedule 40) (730-12.01)LF50$28.55
50Shielded detector cable (730-14.01)LF50$2.05
51Saw slot (730-14.02)LF2,396$7.15
52Loop wire (730-14.03)LF6,126$2.05
53Expansion joint repairs (604-10.44)LF1,320$130.00
54Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY39,249$31.45
TDOT contract CNZ010: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy