TDOT contract CNZ238 bid tabulation

The resurfacing on u.s. 64 (s.r. 15) from davis way (l.m. 18.65) to lockwood way (l.m. 21.90). Let by Tennessee DOT on July 25, 2025, Hardeman County. 1 bid received; low bid $3,266,200 by Standard Construction Company, Inc..

Owner
Tennessee DOT
Letting
25 JUL 2025
Pay items
33
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Standard Construction Company, Inc.$3,266,200Low
TDOT contract CNZ238: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Standard Construction Company, Inc.
1Removal of asphalt pavement (202-03.01)SY1,440$37.50
2Water (203-06)MG21$25.00
3Brooming & degrassing shoulders (208-01.05)LM13$1,925.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON2,695$46.25
5Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON662$210.00
6Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON5,171$118.30
7Trackless tack coat (403-02.01)TON86$1,250.00
8Longitudinal joint sealant (411-01.21)LM13$2,987.00
9Acs mix(PG70-22) grading D (411-02.10)TON4,688$141.15
10Acs mix(PG70-22) thin lift D asphalt (411-03.13)TON1,941$138.80
11Acs mix(PG70-22) thin lift E asphalt (411-03.26)TON1,617$138.75
12Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM11.40$1,210.00
13Cold planing bituminous pavement (415-01.01)TON12,819$36.50
14Guardrail transition 27IN to 31IN (705-02.10)EACH12$154.50
15GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH5$1,457.45
16GR terminal (in-inline) MASH TL-3 (705-06.11)EACH1$1,107.25
17Tangent energy absorbing term MASH TL-3 (705-06.20)EACH6$3,579.25
18Guardrail removed (706-01)LF600$5.15
19Traffic control (712-01)LS1$96,500
20Flexible drums (channelizing) (712-04.01)EACH65$36.05
21Warning lights (type C) (712-05.03)EACH26$1.05
22Signs (construction) (712-06)SF2,743$6.30
23Arrow board (type C) (712-08.03)EACH2$1,184.50
24Signs (W3-17) (713-16.20)EACH8$149.35
25Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH34$49.45
26Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH423$49.45
27Plastic pavement marking (stop line) (716-02.05)LF80$28.85
28Plastic pavement marking (turn lane arrow) (716-02.06)EACH5$283.25
29Plastic pavement marking (8IN line) (716-02.12)LM0.20$20,600
30Plastic pavement marking (bikelane symbol & arrow) (716-04.13)EACH36$437.75
31Painted pavement marking (6" line) (716-05.20)LM23.10$2,575.00
32Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM23$7,828.00
33Mobilization (717-01)LS1$87,500
TDOT contract CNZ238: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of July 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy