TDOT contract CNZ115 bid tabulation
The resurfacing with cold in-place recycling on u.s. 45 (s.r. 5) from the mississippi state line (l.m. 0.00) to s.r. 57 (l.m. 6.00), and the installation of signals at the intersection of s.r. 57 (l.m. 5.68 - l.m. 6.03). Let by Tennessee DOT on March 21, 2025, Mcnairy County. 2 bids received; low bid $5,187,523 by Standard Construction Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 21 MAR 2025
- Pay items
- 81
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Standard Construction Company, Inc. | $5,187,523 | Low |
| 2 | Jones Bros. Contractors, LLC | $5,756,751 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Standard Construction Company, Inc. | 2. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $7,500.00 | $12,000 |
| 2 | Removal of asphalt pavement (202-03.01) | SY | 800 | $41.00 | $53.60 |
| 3 | Water (203-06) | MG | 20 | $25.00 | $6.00 |
| 4 | Brooming & degrassing shoulders (208-01.05) | LM | 16 | $1,500.00 | $2,282.00 |
| 5 | Sediment removal (209-05) | CY | 5 | $100.00 | $153.00 |
| 6 | Temporary silt fence (without backing) (209-08.03) | LF | 250 | $10.20 | $10.00 |
| 7 | Catch basin filter assembly(type 4) (209-40.44) | EACH | 5 | $1,530.00 | $1,500.00 |
| 8 | Mineral aggregate, type A base, grading D (303-01) | TON | 100 | $75.00 | $47.00 |
| 9 | Mineral aggregate, type B base, grading (C or D) (303-02) | TON | 2,643 | $35.25 | $40.00 |
| 10 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 368 | $275.00 | $135.00 |
| 11 | Cold in place recycled bituminous pavement (308-01.10) | SY | 167,200 | $2.60 | $2.67 |
| 12 | Engineered asphalt emulsion (308-01.15) | TON | 984 | $711.80 | $665.24 |
| 13 | Portland cement (309-10.01) | TON | 328 | $252.90 | $236.33 |
| 14 | Trackless tack coat (403-02.01) | TON | 129 | $1,250.00 | $885.00 |
| 15 | Bituminous material(TC/fog seal)(undiluted) (403-05) | TON | 73 | $1,200.00 | $2,148.00 |
| 16 | Mineral aggregate (sand for fog seal) (403-05.05) | TON | 168 | $135.00 | $232.00 |
| 17 | Longitudinal joint sealant (411-01.21) | LM | 29.40 | $2,958.00 | $2,900.00 |
| 18 | Acs mix(PG70-22) grading D (411-02.10) | TON | 1,003 | $159.00 | $157.00 |
| 19 | Acs mix(PG70-22) thin lift D asphalt (411-03.13) | TON | 9,218 | $137.50 | $141.00 |
| 20 | Acs mix(PG64-22) thin lift E shoulder (411-03.34) | TON | 3,232 | $131.00 | $125.00 |
| 21 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 8.70 | $708.90 | $1,720.00 |
| 22 | Shoulder mumble strip (non-continuous) (8IN width) (411-12.10) | LM | 3.40 | $178.50 | $1,720.00 |
| 23 | Cold planing bituminous pavement (415-01.01) | TON | 6,712 | $42.00 | $56.40 |
| 24 | Concrete sidewalk (6 ") (701-01.02) | SF | 383.10 | $15.90 | $25.00 |
| 25 | Concrete curb ramp (701-02.03) | SF | 870.69 | $42.00 | $35.00 |
| 26 | Concrete combined curb & gutter (702-03) | CY | 16.48 | $790.00 | $975.00 |
| 27 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 6 | $153.00 | $150.00 |
| 28 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 2 | $1,479.00 | $1,450.00 |
| 29 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 4 | $3,621.00 | $3,550.00 |
| 30 | Guardrail removed (706-01) | LF | 300 | $5.10 | $5.00 |
| 31 | Traffic control (712-01) | LS | 1 | $199,000 | $333,000 |
| 32 | Flexible drums (channelizing) (712-04.01) | EACH | 135 | $33.65 | $30.00 |
| 33 | Warning lights (type A) (712-05.01) | EACH | 15 | $1.02 | $20.00 |
| 34 | Warning lights (type C) (712-05.03) | EACH | 15 | $1.02 | $20.00 |
| 35 | Signs (construction) (712-06) | SF | 3,431.50 | $7.10 | $7.00 |
| 36 | Arrow board (type C) (712-08.03) | EACH | 6 | $1,581.00 | $1,100.00 |
| 37 | Removable pavement marking (6" line) (712-09.08) | LF | 620 | $6.10 | $6.00 |
| 38 | Changeable message sign unit (713-16.01) | EACH | 2 | $5,967.00 | $5,900.00 |
| 39 | Changeable message sign unit (portable) (713-16.04) | EACH | 2 | $5,967.00 | $5,900.00 |
| 40 | Sign adjustments (713-20.30) | EACH | 4 | $400.00 | $350.00 |
| 41 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 500 | $45.90 | $45.00 |
| 42 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 358 | $45.90 | $45.00 |
| 43 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 475 | $45.90 | $45.00 |
| 44 | Removal of snowplowable reflective marker (716-01.30) | EACH | 1,333 | $25.00 | $8.00 |
| 45 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 146 | $42.85 | $42.00 |
| 46 | Plastic pavement marking (stop line) (716-02.05) | LF | 325 | $20.40 | $20.00 |
| 47 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 26 | $224.40 | $220.00 |
| 48 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 284 | $51.00 | $50.00 |
| 49 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.20 | $21,542 | $21,120 |
| 50 | Plastic word pavement marking (signal ahead) (716-03.06) | EACH | 2 | $1,224.00 | $1,200.00 |
| 51 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 1,050 | $10.20 | $10.00 |
| 52 | Painted pavement marking (stop line) (716-05.05) | LF | 53 | $17.35 | $17.00 |
| 53 | Painted pavement marking (turn lane arrow) (716-05.06) | EACH | 2 | $204.00 | $200.00 |
| 54 | Painted pavement marking (6" line) (716-05.20) | LM | 29 | $1,938.00 | $1,900.00 |
| 55 | Painted pavement marking (longitudinal cross-walk) (716-05.22) | LF | 284 | $35.70 | $35.00 |
| 56 | Removal of pavement marking (line) (716-08.01) | LF | 100 | $5.10 | $5.00 |
| 57 | Removal of pavement marking (stop line) (716-08.05) | LF | 53 | $11.20 | $11.00 |
| 58 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 19 | $132.60 | $130.00 |
| 59 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 29 | $7,650.00 | $7,500.00 |
| 60 | Mobilization (717-01) | LS | 1 | $247,000 | $575,000 |
| 61 | Removal of signal equipment (730-01.02) | EACH | 1 | $10,200 | $8,000.00 |
| 62 | Signal head assembly (110) (730-02.01) | EACH | 4 | $612.00 | $800.00 |
| 63 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 4 | $1,785.00 | $1,400.00 |
| 64 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 4 | $2,448.00 | $2,200.00 |
| 65 | Install pull box (type B) (730-03.21) | EACH | 4 | $1,275.00 | $1,200.00 |
| 66 | Signal cable - 5 conductor (730-08.02) | LF | 2,415 | $2.05 | $2.25 |
| 67 | Signal cable - 7 conductor (730-08.03) | LF | 945 | $2.80 | $2.50 |
| 68 | Signal cable - 9 conductor (730-08.04) | LF | 234 | $4.10 | $2.75 |
| 69 | Span wire assembly (730-09.20) | LF | 496 | $18.35 | $3.00 |
| 70 | Tether wire assembly - 1/4" diameter (730-10.01) | LF | 496 | $12.25 | $3.00 |
| 71 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 250 | $25.50 | $28.00 |
| 72 | Vehicle detector (radar - stop line) (730-13.12) | EACH | 4 | $5,610.00 | $11,960 |
| 73 | Vehicle detector (radar - advance) (730-13.13) | EACH | 4 | $5,610.00 | $11,960 |
| 74 | Cabinet (flashing beacon, pole mounted) (730-15.07) | EACH | 2 | $1,530.00 | $3,260.00 |
| 75 | Modify cabinet (replace lock mechanism) (730-15.11) | EACH | 1 | $5,610.00 | $1,800.00 |
| 76 | Controller (flashing beacon) (730-16.03) | EACH | 2 | $357.00 | $2,640.00 |
| 77 | Controller (atc) (730-16.04) | EACH | 1 | $4,335.00 | $7,000.00 |
| 78 | Pedestal pole (type A) (730-23.28) | EACH | 6 | $3,570.00 | $3,500.00 |
| 79 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 8 | $2,295.00 | $1,860.00 |
| 80 | Temporary sediment tube 8IN (740-11.01) | LF | 250 | $10.20 | $10.00 |
| 81 | Seeding (with mulch) (801-01) | UNIT | 5 | $255.00 | $250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.