TDOT contract CN262019 bid tabulation

The construction of a concrete bulb-tee beam bridge on old lower river road over south mouse creek (l.m. 13.09), including grading, drainage, and paving. Let by Tennessee DOT on February 6, 2026, Bradley County. 5 bids received; low bid $2,047,777 by Wright Brothers Civil Construction, LLC.

Owner
Tennessee DOT
Letting
06 FEB 2026
Pay items
81
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Wright Brothers Civil Construction, LLC$2,047,777Low
2Summers-Taylor, Inc.$2,392,255+17%
3Mid-State Construction Company, Inc.$3,331,698+63%
4King General Contractors, Inc.$4,548,815+122%
5Whaley Construction, LLC$4,731,298+131%
TDOT contract CN262019: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Wright Brothers Civil Construction, LLC2. Summers-Taylor, Inc.3. Mid-State Construction Company, Inc.4. King General Contractors, Inc.5. Whaley Construction, LLC
1Construction stakes, lines and grades (105-01)LS1$17,500$20,000$19,075$83,722$25,000
2Clearing and grubbing (201-01)LS1$23,500$17,000$24,985$114,420$30,000
3Removal of pipe (15", sta. 27+62.70) (202-01.15)LF42$23.00$92.00$28.37$83.72$141.00
4Road & drainage excavation (unclassified) (203-01)CY4,439$20.25$32.00$36.41$55.81$48.00
5Borrow excavation (graded solid rock) (203-02.01)TON4,551$60.00$61.00$75.86$121.40$65.00
6Borrow excavation (unclassified) (203-03)CY17$55.00$228.00$212.04$72.56$195.00
7Placing and spreading topsoil (203-04)CY149$8.00$55.00$20.94$44.65$42.00
8Filter sock (8 inch) (209-03.20)LF1,175$3.20$4.30$5.29$8.37$6.00
9Sediment removal (209-05)CY37$28.00$69.00$56.73$15.35$79.00
10Temporary silt fence (with backing) (209-08.02)LF165$5.30$5.50$8.72$11.16$10.00
11Rock check dam (209-08.07)EACH1$995.00$1,100.00$1,635.00$2,093.04$1,800.00
12Enhanced rock check dam (209-08.08)EACH1$1,425.00$1,620.00$2,180.00$2,790.72$2,400.00
13Sediment filter bag (15' X 15') (209-09.03)EACH4$200.00$1,210.00$926.50$1,186.06$1,822.00
14Turbidity curtain(sta 23+58 to sta 28+05) (209-13.04)LF400$57.00$43.00$27.25$41.86$60.00
15Temporary in stream diversion (209-65.04)LF320$70.00$25.00$231.95$460.47$183.00
16Mineral aggregate, type A base, grading D (303-01)TON1,144$48.00$53.00$96.30$97.68$54.00
17Mineral aggregate (size 57) (303-10.01)TON44$51.00$100.00$64.78$117.21$62.00
18Mineral aggregate (size 4) (303-10.07)TON102$65.00$100.00$64.78$117.21$61.00
19Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON234$153.00$205.00$190.75$223.26$281.00
20Bituminous material for prime coat (PC) (402-01)TON3$1,300.00$2,900.00$2,725.00$1,813.97$3,000.00
21Aggregate for cover material (PC) (402-02)TON12$255.00$117.00$109.00$355.82$120.00
22Bituminous material for tack coat (TC) (403-01)TON22$900.00$586.00$545.00$1,255.82$600.00
23Acs mix(PG64-22) grading D (411-01.10)TON294$166.00$293.00$272.50$237.21$300.00
24Cold planing bituminous pavement (415-01.01)TON141$85.00$97.00$90.47$125.58$100.00
2518" concrete pipe culvert (class III) (607-03.02)LF39$97.00$249.00$190.80$118.61$203.00
2618" pipe culvert (side drain) (607-39.02)LF56$129.00$196.00$83.57$90.70$203.00
27Class A concrete (pipe endwalls) (611-07.01)CY1$2,410.00$3,190.00$4,623.81$3,627.94$3,950.00
28Steel bar reinforcement (pipe endwalls) (611-07.02)LB45$1.00$5.00$5.63$5.58$7.50
2918IN endwall (side drain) (611-07.31)EACH1$4,000.00$6,000.00$5,248.54$39.07$6,092.00
3018IN endwall (cross drain) 3:1 (611-07.54)EACH2$2,075.00$3,070.00$5,248.20$5,441.90$4,292.00
31Earth pad for guard rail end treatment (705-04.10)EACH3$1,100.00$1,160.00$1,090.00$1,395.36$1,200.00
32Guardrail delineation enhancement (BI-directional) (705-04.23)LF2,365$2.20$2.30$2.18$4.88$5.00
33W beam GR (type 2) MASH TL-3 (705-06.01)LF1,228$29.50$31.00$29.43$37.67$33.00
34W beam GR (type 2) MASH TL-3 (long post) (705-06.02)LF1,020$35.00$37.00$34.88$44.65$39.00
35GR terminal (in-inline) MASH TL-3 (705-06.11)EACH1$1,200.00$1,270.00$1,199.00$1,534.90$1,320.00
36Thrie beam bridge transition MASH TL-2 (705-06.26)EACH4$1,750.00$1,850.00$1,744.00$2,232.58$1,920.00
37GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH3$3,500.00$3,700.00$3,488.00$4,465.15$3,840.00
38Radius rail (706-06.03)LF36$42.50$45.00$42.51$54.42$47.00
39Rounded end element (706-10.26)EACH1$130.00$138.00$130.80$167.44$144.00
40Stock fence gate (14 foot) (707-03.03)EACH1$1,500.00$1,160.00$1,526.00$2,790.72$1,680.00
41Removal of fence (barbed wire) (707-06.01)LF240$10.75$3.50$10.90$11.16$12.00
42Fence (4-strand barbed wire) (707-08.01)LF44$31.50$17.00$31.61$27.91$35.00
43Machined rip-rap (class A-3) (709-05.05)TON152$52.00$62.00$93.44$107.44$59.00
44Machined rip-rap (class A-1) (709-05.06)TON214$53.00$65.00$86.48$111.63$59.00
45Machined rip-rap (class B) (709-05.08)TON54$56.00$72.00$93.57$111.63$62.00
46Machined rip-rap (class C) (709-05.09)TON2,719$60.00$66.00$76.06$111.63$51.00
47Traffic control (712-01)LS1$7,500.00$12,000$26,706$48,838$20,000
48Warning lights (type A) (712-05.01)EACH6$28.00$28.00$16.35$48.84$30.00
49Signs (construction) (712-06)SF245$7.30$7.50$7.63$9.77$8.00
50Temporary barricades (type III) (712-07.03)LF60$15.00$15.50$26.16$22.33$17.00
51Sign post delineation enhancement (713-02.21)LF55$3.75$4.00$7.63$7.67$5.00
52Perforated/knockout square tube post (713-11.02)LB439$3.75$4.00$6.00$6.98$5.00
53Flat sheet aluminum signs (0.080" thick) (713-13.02)SF50$12.00$13.00$17.44$22.33$14.00
54Flat sheet aluminum signs (0.100" thick) (713-13.03)SF18$13.00$14.00$17.44$25.12$15.00
55Removal of signs, posts and footings (713-15)LS1$475.00$500.00$81.75$627.91$550.00
56Changeable message sign unit (713-16.01)EACH2$4,300.00$4,400.00$5,341.00$11,163$4,560.00
57Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH20$110.00$86.00$81.75$104.65$120.00
58Enhanced flatline thermo PVMT MRKNG (4IN line) (716-12.01)LM1.30$9,375.00$8,400.00$7,902.50$10,116$10,200
59Mobilization (717-01)LS1$135,300$176,000$343,118$453,492$804,800
60Geogrid reinforcement type 2 (740-07.04)SY1,120$4.00$6.50$5.72$8.37$23.00
61Geotextile (type III)(erosion control) (740-10.03)SY501$3.50$3.00$5.97$6.98$23.00
62Geotextile (type IV)(stabilization) (740-10.04)SY3,050$4.30$5.00$5.79$8.37$21.00
63Natve seed MX final stablizatn of slopes (801-01.38)UNIT19.30$100.00$116.00$136.25$174.42$150.00
64Water (seeding & sodding) (801-03)MG9$170.00$145.00$212.55$279.07$234.00
65Sodding (new sod) (803-01)SY541$13.00$7.00$7.09$9.77$8.00
66Removal of structures (bridge no. 06-01185-13.06) (202-04.01)LS1$59,650$156,000$403,320$306,979$1,347,994
67Dry excavation (bridges) (204-02.01)CY261$30.00$38.00$66.36$55.81$65.00
68Granular backfill (bridges) (303-01.02)TON52$65.00$67.00$87.02$111.63$65.00
69Epoxy coated reinforcing steel (604-02.03)LB24,437$1.75$1.65$2.35$6.98$3.00
70Class A concrete (bridges) (604-03.01)CY80$1,200.00$1,525.00$2,561.10$1,813.97$1,721.00
71Steel bar reinforcement (bridges) (604-03.02)LB10,738$1.50$1.50$1.86$5.58$2.70
72Class D concrete (bridge deck) (604-03.09)CY134$1,640.00$1,445.00$1,354.76$1,834.90$1,773.00
73Applied texture finish (new structures) (604-04.01)SY736$12.00$12.00$11.45$27.91$20.00
74Three star state emblem (604-04.41)EACH4$900.00$2,020.00$2,182.57$976.75$2,300.00
75Bridge deck grooving (mechanical) (604-05.31)SY396$16.50$18.00$20.71$16.74$82.00
76Steel piles (12 inch) (606-03.03)LF364$134.00$114.00$164.83$488.38$151.00
77Pile tips (steel piles, 12 inch) (606-03.06)EACH18$385.00$215.00$324.05$355.82$326.00
78Prestressed concrete bulb tee beam (6" web)(BT-72) (615-01.12)LF583$450.00$588.00$878.44$1,109.31$701.00
79Concrete railing (620-06)LF376$255.00$198.00$190.09$313.96$295.00
806" perforated pipe with vertical drain system (710-09.01)LF122$43.00$34.00$60.60$30.70$51.00
816" pipe underdrain (710-09.02)LF41$23.00$26.00$41.01$22.33$35.00
TDOT contract CN262019: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy