TDOT contract CN262019 bid tabulation
The construction of a concrete bulb-tee beam bridge on old lower river road over south mouse creek (l.m. 13.09), including grading, drainage, and paving. Let by Tennessee DOT on February 6, 2026, Bradley County. 5 bids received; low bid $2,047,777 by Wright Brothers Civil Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 81
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wright Brothers Civil Construction, LLC | $2,047,777 | Low |
| 2 | Summers-Taylor, Inc. | $2,392,255 | +17% |
| 3 | Mid-State Construction Company, Inc. | $3,331,698 | +63% |
| 4 | King General Contractors, Inc. | $4,548,815 | +122% |
| 5 | Whaley Construction, LLC | $4,731,298 | +131% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wright Brothers Civil Construction, LLC | 2. Summers-Taylor, Inc. | 3. Mid-State Construction Company, Inc. | 4. King General Contractors, Inc. | 5. Whaley Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $17,500 | $20,000 | $19,075 | $83,722 | $25,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $23,500 | $17,000 | $24,985 | $114,420 | $30,000 |
| 3 | Removal of pipe (15", sta. 27+62.70) (202-01.15) | LF | 42 | $23.00 | $92.00 | $28.37 | $83.72 | $141.00 |
| 4 | Road & drainage excavation (unclassified) (203-01) | CY | 4,439 | $20.25 | $32.00 | $36.41 | $55.81 | $48.00 |
| 5 | Borrow excavation (graded solid rock) (203-02.01) | TON | 4,551 | $60.00 | $61.00 | $75.86 | $121.40 | $65.00 |
| 6 | Borrow excavation (unclassified) (203-03) | CY | 17 | $55.00 | $228.00 | $212.04 | $72.56 | $195.00 |
| 7 | Placing and spreading topsoil (203-04) | CY | 149 | $8.00 | $55.00 | $20.94 | $44.65 | $42.00 |
| 8 | Filter sock (8 inch) (209-03.20) | LF | 1,175 | $3.20 | $4.30 | $5.29 | $8.37 | $6.00 |
| 9 | Sediment removal (209-05) | CY | 37 | $28.00 | $69.00 | $56.73 | $15.35 | $79.00 |
| 10 | Temporary silt fence (with backing) (209-08.02) | LF | 165 | $5.30 | $5.50 | $8.72 | $11.16 | $10.00 |
| 11 | Rock check dam (209-08.07) | EACH | 1 | $995.00 | $1,100.00 | $1,635.00 | $2,093.04 | $1,800.00 |
| 12 | Enhanced rock check dam (209-08.08) | EACH | 1 | $1,425.00 | $1,620.00 | $2,180.00 | $2,790.72 | $2,400.00 |
| 13 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 4 | $200.00 | $1,210.00 | $926.50 | $1,186.06 | $1,822.00 |
| 14 | Turbidity curtain(sta 23+58 to sta 28+05) (209-13.04) | LF | 400 | $57.00 | $43.00 | $27.25 | $41.86 | $60.00 |
| 15 | Temporary in stream diversion (209-65.04) | LF | 320 | $70.00 | $25.00 | $231.95 | $460.47 | $183.00 |
| 16 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,144 | $48.00 | $53.00 | $96.30 | $97.68 | $54.00 |
| 17 | Mineral aggregate (size 57) (303-10.01) | TON | 44 | $51.00 | $100.00 | $64.78 | $117.21 | $62.00 |
| 18 | Mineral aggregate (size 4) (303-10.07) | TON | 102 | $65.00 | $100.00 | $64.78 | $117.21 | $61.00 |
| 19 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 234 | $153.00 | $205.00 | $190.75 | $223.26 | $281.00 |
| 20 | Bituminous material for prime coat (PC) (402-01) | TON | 3 | $1,300.00 | $2,900.00 | $2,725.00 | $1,813.97 | $3,000.00 |
| 21 | Aggregate for cover material (PC) (402-02) | TON | 12 | $255.00 | $117.00 | $109.00 | $355.82 | $120.00 |
| 22 | Bituminous material for tack coat (TC) (403-01) | TON | 22 | $900.00 | $586.00 | $545.00 | $1,255.82 | $600.00 |
| 23 | Acs mix(PG64-22) grading D (411-01.10) | TON | 294 | $166.00 | $293.00 | $272.50 | $237.21 | $300.00 |
| 24 | Cold planing bituminous pavement (415-01.01) | TON | 141 | $85.00 | $97.00 | $90.47 | $125.58 | $100.00 |
| 25 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 39 | $97.00 | $249.00 | $190.80 | $118.61 | $203.00 |
| 26 | 18" pipe culvert (side drain) (607-39.02) | LF | 56 | $129.00 | $196.00 | $83.57 | $90.70 | $203.00 |
| 27 | Class A concrete (pipe endwalls) (611-07.01) | CY | 1 | $2,410.00 | $3,190.00 | $4,623.81 | $3,627.94 | $3,950.00 |
| 28 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 45 | $1.00 | $5.00 | $5.63 | $5.58 | $7.50 |
| 29 | 18IN endwall (side drain) (611-07.31) | EACH | 1 | $4,000.00 | $6,000.00 | $5,248.54 | $39.07 | $6,092.00 |
| 30 | 18IN endwall (cross drain) 3:1 (611-07.54) | EACH | 2 | $2,075.00 | $3,070.00 | $5,248.20 | $5,441.90 | $4,292.00 |
| 31 | Earth pad for guard rail end treatment (705-04.10) | EACH | 3 | $1,100.00 | $1,160.00 | $1,090.00 | $1,395.36 | $1,200.00 |
| 32 | Guardrail delineation enhancement (BI-directional) (705-04.23) | LF | 2,365 | $2.20 | $2.30 | $2.18 | $4.88 | $5.00 |
| 33 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 1,228 | $29.50 | $31.00 | $29.43 | $37.67 | $33.00 |
| 34 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 1,020 | $35.00 | $37.00 | $34.88 | $44.65 | $39.00 |
| 35 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 1 | $1,200.00 | $1,270.00 | $1,199.00 | $1,534.90 | $1,320.00 |
| 36 | Thrie beam bridge transition MASH TL-2 (705-06.26) | EACH | 4 | $1,750.00 | $1,850.00 | $1,744.00 | $2,232.58 | $1,920.00 |
| 37 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 3 | $3,500.00 | $3,700.00 | $3,488.00 | $4,465.15 | $3,840.00 |
| 38 | Radius rail (706-06.03) | LF | 36 | $42.50 | $45.00 | $42.51 | $54.42 | $47.00 |
| 39 | Rounded end element (706-10.26) | EACH | 1 | $130.00 | $138.00 | $130.80 | $167.44 | $144.00 |
| 40 | Stock fence gate (14 foot) (707-03.03) | EACH | 1 | $1,500.00 | $1,160.00 | $1,526.00 | $2,790.72 | $1,680.00 |
| 41 | Removal of fence (barbed wire) (707-06.01) | LF | 240 | $10.75 | $3.50 | $10.90 | $11.16 | $12.00 |
| 42 | Fence (4-strand barbed wire) (707-08.01) | LF | 44 | $31.50 | $17.00 | $31.61 | $27.91 | $35.00 |
| 43 | Machined rip-rap (class A-3) (709-05.05) | TON | 152 | $52.00 | $62.00 | $93.44 | $107.44 | $59.00 |
| 44 | Machined rip-rap (class A-1) (709-05.06) | TON | 214 | $53.00 | $65.00 | $86.48 | $111.63 | $59.00 |
| 45 | Machined rip-rap (class B) (709-05.08) | TON | 54 | $56.00 | $72.00 | $93.57 | $111.63 | $62.00 |
| 46 | Machined rip-rap (class C) (709-05.09) | TON | 2,719 | $60.00 | $66.00 | $76.06 | $111.63 | $51.00 |
| 47 | Traffic control (712-01) | LS | 1 | $7,500.00 | $12,000 | $26,706 | $48,838 | $20,000 |
| 48 | Warning lights (type A) (712-05.01) | EACH | 6 | $28.00 | $28.00 | $16.35 | $48.84 | $30.00 |
| 49 | Signs (construction) (712-06) | SF | 245 | $7.30 | $7.50 | $7.63 | $9.77 | $8.00 |
| 50 | Temporary barricades (type III) (712-07.03) | LF | 60 | $15.00 | $15.50 | $26.16 | $22.33 | $17.00 |
| 51 | Sign post delineation enhancement (713-02.21) | LF | 55 | $3.75 | $4.00 | $7.63 | $7.67 | $5.00 |
| 52 | Perforated/knockout square tube post (713-11.02) | LB | 439 | $3.75 | $4.00 | $6.00 | $6.98 | $5.00 |
| 53 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 50 | $12.00 | $13.00 | $17.44 | $22.33 | $14.00 |
| 54 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 18 | $13.00 | $14.00 | $17.44 | $25.12 | $15.00 |
| 55 | Removal of signs, posts and footings (713-15) | LS | 1 | $475.00 | $500.00 | $81.75 | $627.91 | $550.00 |
| 56 | Changeable message sign unit (713-16.01) | EACH | 2 | $4,300.00 | $4,400.00 | $5,341.00 | $11,163 | $4,560.00 |
| 57 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 20 | $110.00 | $86.00 | $81.75 | $104.65 | $120.00 |
| 58 | Enhanced flatline thermo PVMT MRKNG (4IN line) (716-12.01) | LM | 1.30 | $9,375.00 | $8,400.00 | $7,902.50 | $10,116 | $10,200 |
| 59 | Mobilization (717-01) | LS | 1 | $135,300 | $176,000 | $343,118 | $453,492 | $804,800 |
| 60 | Geogrid reinforcement type 2 (740-07.04) | SY | 1,120 | $4.00 | $6.50 | $5.72 | $8.37 | $23.00 |
| 61 | Geotextile (type III)(erosion control) (740-10.03) | SY | 501 | $3.50 | $3.00 | $5.97 | $6.98 | $23.00 |
| 62 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 3,050 | $4.30 | $5.00 | $5.79 | $8.37 | $21.00 |
| 63 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 19.30 | $100.00 | $116.00 | $136.25 | $174.42 | $150.00 |
| 64 | Water (seeding & sodding) (801-03) | MG | 9 | $170.00 | $145.00 | $212.55 | $279.07 | $234.00 |
| 65 | Sodding (new sod) (803-01) | SY | 541 | $13.00 | $7.00 | $7.09 | $9.77 | $8.00 |
| 66 | Removal of structures (bridge no. 06-01185-13.06) (202-04.01) | LS | 1 | $59,650 | $156,000 | $403,320 | $306,979 | $1,347,994 |
| 67 | Dry excavation (bridges) (204-02.01) | CY | 261 | $30.00 | $38.00 | $66.36 | $55.81 | $65.00 |
| 68 | Granular backfill (bridges) (303-01.02) | TON | 52 | $65.00 | $67.00 | $87.02 | $111.63 | $65.00 |
| 69 | Epoxy coated reinforcing steel (604-02.03) | LB | 24,437 | $1.75 | $1.65 | $2.35 | $6.98 | $3.00 |
| 70 | Class A concrete (bridges) (604-03.01) | CY | 80 | $1,200.00 | $1,525.00 | $2,561.10 | $1,813.97 | $1,721.00 |
| 71 | Steel bar reinforcement (bridges) (604-03.02) | LB | 10,738 | $1.50 | $1.50 | $1.86 | $5.58 | $2.70 |
| 72 | Class D concrete (bridge deck) (604-03.09) | CY | 134 | $1,640.00 | $1,445.00 | $1,354.76 | $1,834.90 | $1,773.00 |
| 73 | Applied texture finish (new structures) (604-04.01) | SY | 736 | $12.00 | $12.00 | $11.45 | $27.91 | $20.00 |
| 74 | Three star state emblem (604-04.41) | EACH | 4 | $900.00 | $2,020.00 | $2,182.57 | $976.75 | $2,300.00 |
| 75 | Bridge deck grooving (mechanical) (604-05.31) | SY | 396 | $16.50 | $18.00 | $20.71 | $16.74 | $82.00 |
| 76 | Steel piles (12 inch) (606-03.03) | LF | 364 | $134.00 | $114.00 | $164.83 | $488.38 | $151.00 |
| 77 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 18 | $385.00 | $215.00 | $324.05 | $355.82 | $326.00 |
| 78 | Prestressed concrete bulb tee beam (6" web)(BT-72) (615-01.12) | LF | 583 | $450.00 | $588.00 | $878.44 | $1,109.31 | $701.00 |
| 79 | Concrete railing (620-06) | LF | 376 | $255.00 | $198.00 | $190.09 | $313.96 | $295.00 |
| 80 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 122 | $43.00 | $34.00 | $60.60 | $30.70 | $51.00 |
| 81 | 6" pipe underdrain (710-09.02) | LF | 41 | $23.00 | $26.00 | $41.01 | $22.33 | $35.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.