Hawkins Asphalt Paving, LLC: TDOT bid record
Hawkins Asphalt Paving, LLC submitted 25 bids on Tennessee DOT contracts in the data, from 15 MAY 2020 to 26 JUN 2026, and was the low bidder on 8 of them (32%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $12,561,883
- Latest bid
- 26 JUN 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2024 | 6 | 1 | 17% |
| 2025 | 8 | 2 | 25% |
| 2026 | 10 | 5 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rutherford County | 13 | 5 | 38% |
| Bedford County | 4 | 2 | 50% |
| Cannon County | 3 | 0 | 0% |
| Williamson County | 2 | 1 | 50% |
| Davidson County | 1 | 0 | 0% |
| Marshall And Williamson Counties | 1 | 0 | 0% |
| Bedford And Rutherford | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 25 | 23 (92%) | $6.80 | $8.00 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 21 | 14 (67%) | $10.00 | $12.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 17 | 12 (71%) | $26.00 | $34.50 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 24 | 10 (42%) | $7,000.00 | $7,425.00 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 21 | 10 (48%) | $35.00 | $40.48 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 16 | 9 (56%) | $200.00 | $200.68 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 23 | 8 (35%) | $20.00 | $17.30 |
| Arrow board (type C) | 712-08.03 | EACH | 14 | 8 (57%) | $962.50 | $1,170.00 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 22 | 7 (32%) | $900.00 | $969.62 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 21 | 6 (29%) | $1,325.00 | $1,500.00 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 16 | 6 (38%) | $1,400.00 | $1,400.00 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 13 | 6 (46%) | $35.00 | $29.75 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vulcan Construction Materials, LLC | 16 | 5 of 16 |
| Wiregrass Construction Company, Inc | 15 | 5 of 15 |
| Rogers Group, Inc. | 13 | 4 of 13 |
| Jones Bros. Contractors, LLC | 10 | 3 of 10 |
| Volunteer Paving, LLC | 10 | 2 of 10 |
| Tinsley Asphalt, LLC | 7 | 6 of 7 |
| Pavement Restorations, Inc. | 5 | 0 of 5 |
| Asphalt Paving Systems, Inc. | 3 | 3 of 3 |
| Eubank Asphalt Paving & Sealing, LLC | 2 | 1 of 2 |
| Sessions Paving Company | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 JUN 2026 | CN263048 | Bedford County | The resurfacing on s.r. 269 from s.r. 82 (l.m. 4.45) to s.r. 64 (l.m. 9.54) | 1 of 4 | $1,076,832 | Low, 3.0% under the second |
| 26 JUN 2026 | CN263051 | Marshall And Williamson Counties | Microsurfacing or thin mix overlay on u.s. 31a (s.r. 11) from near sw forest street in marshall county (l.m. 26.03) to the rutherford county | 2 of 4 | $1,558,446 | +5.0% |
| 26 JUN 2026 | CN263046 | Rutherford County | The resurfacing on u.s. 231 (s.r. 10) from s.r. 268 (compton road) (l.m. 17.89) to the wilson county line (l.m. 24.97) | 1 of 3 | $1,627,881 | Low, 9.0% under the second |
| 26 JUN 2026 | CN263053 | Rutherford County | The resurfacing on u.s. 31a (s.r. 11) from the williamson county line (l.m. 0.00) to the williamson county line (l.m. 2.57) | 1 of 4 | $670,110 | Low, 6.0% under the second |
| 20 MAR 2026 | CN262021 | Cannon County | The resurfacing on s.r. 53 from near pleasant ridge road (l.m. 18.21) to the dekalb county line (l.m. 24.08) | 3 of 4 | $2,575,497 | +7.0% |
| 20 MAR 2026 | CN263031 | Rutherford County | The resurfacing on s.r. 266 from u.s. 231 (s.r. 10) (l.m. 13.30) to near s.r. 96 (l.m. 18.66) | 1 of 4 | $1,128,555 | Low, 9.0% under the second |
| 06 FEB 2026 | CN263011 | Bedford County | The resurfacing on s.r. 82 from west of couch lane (l.m. 16.70) to s.r. 64 (l.m. 22.16) | 1 of 3 | $1,265,644 | Low, 4.0% under the second |
| 06 FEB 2026 | CN262016 | Cannon County | The resurfacing (microsurface or thin mix overlay) on s.r. 64 from the coffee county line to south of u.s. 70s (s.r. 1) and on s.r. 99 from | 3 of 5 | $2,033,744 | +46% |
| 06 FEB 2026 | CN263019 | Rutherford County | The resurfacing on s.r. 102 from near brackin court (l.m. 11.62) to s.r. 266 (l.m. 13.04) | 2 of 4 | $1,118,676 | +4.0% |
| 06 FEB 2026 | CN263020 | Rutherford County | The resurfacing (microsurface or thin mix overlay) on s.r. 99 from west of mt. herman road (l.m. 24.50) to the cannon county line (l.m. 33.1 | 3 of 6 | $1,659,939 | +20% |
| 03 OCT 2025 | CNZ263 | Williamson County | The resurfacing on s.r. 252 (wilson pike) from s.r. 96 (l.m. 0.00) to north of clovercroft road (l.m. 5.71) | 1 of 7 | $1,231,228 | Low, 1.0% under the second |
| 27 JUN 2025 | CNZ204 | Rutherford County | The resurfacing on u.s. 41 (u.s. 70s, s.r. 1) from north of florence road (l.m. 9.80) to s.r. 268 (l.m. 14.10) | 1 of 3 | $2,960,096 | Low, 7.0% under the second |
| 09 MAY 2025 | CNZ147 | Bedford County | The construction of turn lanes on u.s. 231 (s.r. 10) at the intersection of s.r. 82 (sawney webb memorial highway) (l.m. 17.52), including s | 2 of 6 | $2,060,007 | +10% |
| 21 MAR 2025 | CNZ098 | Davidson County | The resurfacing on i-24 from haywood lane (l.m. 21.10) to the rutherford county line (l.m. 27.62), including bridge expansion joint repairs | 2 of 4 | $7,510,748 | +6.0% |
| 07 FEB 2025 | CNZ051 | Bedford County | The resurfacing on u.s. 231 (s.r. 10) from the intersection of lane parkway (l.m. 10.19) to the intersection of moreland avenue (l.m. 12.25) | 3 of 3 | $1,558,482 | +19% |
| 07 FEB 2025 | CNZ066 | Cannon County | The resurfacing on s.r. 281 from s.r. 53 (l.m. 0.00) to west of todd road (l.m. 4.51) | 4 of 5 | $1,181,348 | +10% |
| 07 FEB 2025 | CNZ004 | Rutherford County | The resurfacing on s.r. 102 from s.r. 96 (l.m. 0.00) to near mercedes drive (l.m. 6.00), including thin epoxy overlay on bridges | 3 of 6 | $1,673,575 | +7.0% |
| 07 FEB 2025 | CNZ002 | Rutherford County | The resurfacing on u.s. 41 (s.r. 2) from kensington square court (l.m. 1.80) to south of cedar grove road (l.m. 6.78) | 3 of 5 | $1,950,103 | +11% |
| 04 OCT 2024 | CNY236 | Rutherford County | The resurfacing on i-840 from the east fork stones river bridge (l.m. 15.50) to the wilson county line (l.m. 20.54) | 4 of 4 | $6,809,965 | +11% |
| 21 JUN 2024 | CNY170 | Rutherford County | The miscellaneous safety improvements on u.s. 231 (s.r. 10) at the intersection of rock springs midland road (l.m. 3.44 to l.m. 3.82), inclu | 4 of 7 | $1,251,542 | +8.0% |
| 09 FEB 2024 | CNY024 | Rutherford County | The resurfacing on i-24 from near the stones river (l.m. 15.52) to east of the csxt railroad (l.m. 19.07), including bridge expansion joint | 3 of 4 | $8,764,275 | +17% |
| 09 FEB 2024 | CNY061 | Rutherford County | The resurfacing on i-840 from near i-24 (l.m. 7.53) to near the west fork stones river (l.m. 10.46), including bridge deck and expansion joi | 2 of 4 | $6,087,439 | +3.0% |
| 09 FEB 2024 | CNY020 | Rutherford County | The resurfacing on u.s. 41 (s.r. 2) from u.s. 70s (s.r. 1) to near kensington square court and on u.s. 70s (s.r. 1) from south of ash street | 1 of 2 | $2,601,536 | Low, 6.0% under the second |
| 09 FEB 2024 | CNY017 | Williamson County | The resurfacing on u.s. 31a (u.s. 41a, s.r. 11) from s.r. 96 (l.m. 7.41) to the davidson county line (l.m. 17.14) | 4 of 7 | $3,323,874 | +17% |
| 15 MAY 2020 | CNU207 | Bedford And Rutherford | 94,75015-8208-14,stp/hsip-82(6),02011-3224-94,02011-8224-14 the resurfacing on s.r. 269 from u.s. 231 (s.r. 10) in rutherford county to s.r. | 2 of 5 | $2,315,844 | +3.0% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.