TDOT contract CNZ004 bid tabulation

The resurfacing on s.r. 102 from s.r. 96 (l.m. 0.00) to near mercedes drive (l.m. 6.00), including thin epoxy overlay on bridges. Let by Tennessee DOT on February 7, 2025, Rutherford County. 6 bids received; low bid $1,559,584 by Wiregrass Construction Company, Inc.

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
33
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Wiregrass Construction Company, Inc$1,559,584Low
2Vulcan Construction Materials, LLC$1,629,822+5.0%
3Hawkins Asphalt Paving, LLC$1,673,575+7.0%
4Jones Bros. Contractors, LLC$1,675,549+7.0%
5Rogers Group, Inc.$1,833,246+18%
6Volunteer Paving, LLC$1,852,965+19%
TDOT contract CNZ004: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Wiregrass Construction Company, Inc2. Vulcan Construction Materials, LLC3. Hawkins Asphalt Paving, LLC4. Jones Bros. Contractors, LLC5. Rogers Group, Inc.6. Volunteer Paving, LLC
1Brooming & degrassing shoulders (208-01.05)LM12$1,881.21$1,200.00$1,750.00$1,065.00$2,375.00$3,086.49
2Mineral aggregate, type A base, grading D (303-01)TON307$60.74$60.00$55.00$40.00$55.00$60.55
3Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON15$448.93$930.00$250.00$280.00$530.00$1,052.75
4Bituminous material for tack coat (TC) (403-01)TON33$708.48$1,000.00$765.00$810.00$730.00$1,035.52
5Acs mix(PG70-22) grading D (411-02.10)TON7,120$134.00$130.00$137.50$139.00$130.00$132.85
6Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM1.30$1,036.28$590.00$1,860.00$1,185.00$1,975.00$1,867.46
7Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM7.90$1,036.28$590.00$1,102.00$1,185.00$1,625.00$649.00
8Cold planing bituminous pavement (415-01.01)TON7,068$15.77$27.00$22.75$32.00$42.85$34.85
9Earth pad for type 38 GR end treatment (705-04.09)EACH2$1,251.55$1,250.00$2,200.00$1,250.00$2,325.00$2,020.70
10Tangent energy absorbing term MASH TL-3 (705-06.20)EACH2$3,954.90$3,950.00$3,550.00$3,950.00$3,750.00$4,121.70
11Guardrail removed (706-01)LF100$1.00$1.00$5.00$1.00$5.30$4.13
12Traffic control (712-01)LS1$39,749$45,000$55,700$52,500$80,000$148,609
13Flexible drums (channelizing) (712-04.01)EACH96$1.00$15.00$26.00$26.00$27.50$59.51
14Signs (construction) (712-06)SF1,304$7.11$9.50$7.10$7.10$7.50$15.40
15Flexible delineator (white) (713-02.14)EACH20$48.06$36.75$48.00$48.00$51.00$37.42
16Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH398$34.04$35.00$35.00$34.00$37.00$45.00
17Removal of snowplowable reflective marker (716-01.30)EACH398$16.02$12.00$12.00$16.00$12.75$10.00
18Plastic pavement marking(channelization striping) (716-02.04)SY42$35.04$35.00$35.00$35.00$37.00$35.00
19Plastic pavement marking (stop line) (716-02.05)LF264$18.02$20.00$20.00$18.00$21.15$25.00
20Plastic pavement marking (turn lane arrow) (716-02.06)EACH15$165.20$200.00$200.00$165.00$212.00$225.00
21Plastic pavement marking (24" barrier line) (716-02.07)LF71$14.02$12.00$12.00$14.00$12.75$25.00
22Plastic pavement marking (6" dotted line) (716-02.11)LF96$1.00$2.00$2.00$1.00$2.12$2.00
23Plastic word pavement marking (stop ahead) (716-03.03)EACH1$901.12$800.00$800.00$900.00$850.00$600.00
24Plastic word pavement marking (stop) (716-03.07)EACH1$400.50$400.00$400.00$400.00$425.00$400.00
25Plastic pavement marking (straight-turn arrow) (716-04.01)EACH2$300.37$300.00$300.00$300.00$318.00$400.00
26Plastic pavement marking (straight arrow) (716-04.05)EACH2$185.23$200.00$200.00$185.00$212.00$225.00
27Plastic pavement marking (yield line) (716-04.12)SF15$45.06$35.00$35.00$45.00$37.00$30.00
28Plastic pavement marking (yield symbol) (716-04.17)EACH1$80.10$500.00$500.00$80.00$530.00$500.00
29Painted pavement marking (4" line) (716-05.01)LM24.50$1,001.24$1,400.00$1,400.00$850.00$1,480.00$1,000.00
30Contrast pavement marking 6" (716-09.86)LM0.20$18,022$25,000$25,000$18,000$26,500$40,000
31Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM24.50$6,508.06$6,900.00$6,900.00$6,200.00$7,300.00$7,000.00
32Mobilization (717-01)LS1$51,446$50,000$65,000$41,000$80,000$32,922
33Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY1,490$54.23$45.00$46.50$45.00$47.50$56.60
TDOT contract CNZ004: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy