TDOT contract CNZ263 bid tabulation
The resurfacing on s.r. 252 (wilson pike) from s.r. 96 (l.m. 0.00) to north of clovercroft road (l.m. 5.71). Let by Tennessee DOT on October 3, 2025, Williamson County. 7 bids received; low bid $1,231,228 by Hawkins Asphalt Paving, LLC.
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 26
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hawkins Asphalt Paving, LLC | $1,231,228 | Low |
| 2 | Eubank Asphalt Paving & Sealing, LLC | $1,243,903 | +1.0% |
| 3 | Wiregrass Construction Company, Inc | $1,398,277 | +14% |
| 4 | Vulcan Construction Materials, LLC | $1,424,205 | +16% |
| 5 | Jones Bros. Contractors, LLC | $1,497,495 | +22% |
| 6 | Volunteer Paving, LLC | $1,722,390 | +40% |
| 7 | Rogers Group, Inc. | $1,874,000 | +52% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hawkins Asphalt Paving, LLC | 2. Eubank Asphalt Paving & Sealing, LLC | 3. Wiregrass Construction Company, Inc | 4. Vulcan Construction Materials, LLC | 5. Jones Bros. Contractors, LLC | 6. Volunteer Paving, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 12 | $985.00 | $800.00 | $1,150.00 | $2,150.00 | $1,400.00 | $1,191.44 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 464 | $40.00 | $25.00 | $64.00 | $60.00 | $60.00 | $60.67 |
| 3 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 730 | $125.00 | $119.00 | $175.00 | $140.00 | $125.00 | $165.25 |
| 4 | Bituminous material for tack coat (TC) (403-01) | TON | 31 | $900.00 | $370.00 | $925.00 | $1,100.00 | $850.00 | $1,037.65 |
| 5 | Acs mix(PG64-22) grading D (411-01.10) | TON | 4,922 | $129.50 | $144.00 | $133.00 | $135.00 | $155.00 | $157.21 |
| 6 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 9 | $860.00 | $500.00 | $650.00 | $1,225.00 | $1,225.00 | $1,105.07 |
| 7 | Cold planing bituminous pavement (415-01.01) | TON | 5,400 | $27.50 | $26.00 | $40.50 | $41.00 | $41.10 | $61.29 |
| 8 | Traffic control (712-01) | LS | 1 | $31,000 | $14,000 | $45,800 | $65,000 | $75,000 | $66,000 |
| 9 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $1.00 | $5.00 | $1.00 | $31.00 | $1.00 | $38.50 |
| 10 | Signs (construction) (712-06) | SF | 1,715 | $6.85 | $7.50 | $6.85 | $7.00 | $6.85 | $8.80 |
| 11 | Remove and replace sign (W3-3, 30" X 30", signal ahead) (713-16.50) | EACH | 1 | $350.00 | $500.00 | $350.00 | $125.00 | $350.00 | $275.01 |
| 12 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 415 | $35.00 | $30.00 | $35.00 | $45.00 | $35.00 | $40.00 |
| 13 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 16 | $35.00 | $30.00 | $35.00 | $45.00 | $35.00 | $40.00 |
| 14 | Removal of snowplowable reflective marker (716-01.30) | EACH | 431 | $11.50 | $10.00 | $12.00 | $10.00 | $12.00 | $10.00 |
| 15 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 30 | $50.00 | $40.00 | $50.00 | $40.00 | $50.00 | $35.00 |
| 16 | Plastic pavement marking (stop line) (716-02.05) | LF | 245 | $22.00 | $25.00 | $22.00 | $30.00 | $22.00 | $25.00 |
| 17 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 2 | $260.00 | $250.00 | $260.00 | $275.00 | $260.00 | $225.00 |
| 18 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 35 | $3.00 | $4.00 | $3.00 | $5.00 | $3.00 | $4.00 |
| 19 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.10 | $15,000 | $10,000 | $15,000 | $10,500 | $15,000 | $10,000 |
| 20 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 2 | $700.00 | $800.00 | $700.00 | $800.00 | $700.00 | $800.00 |
| 21 | Plastic word pavement marking (signal ahead) (716-03.06) | EACH | 5 | $800.00 | $600.00 | $800.00 | $600.00 | $800.00 | $600.00 |
| 22 | Painted pavement marking (6" line) (716-05.20) | LM | 20 | $1,300.00 | $1,250.00 | $1,300.00 | $1,250.00 | $1,300.00 | $1,000.00 |
| 23 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 20 | $7,400.00 | $7,000.00 | $7,400.00 | $7,200.00 | $7,400.00 | $7,590.00 |
| 24 | Mobilization (717-01) | LS | 1 | $32,895 | $43,283 | $49,000 | $46,000 | $40,000 | $116,645 |
| 25 | Saw slot (730-14.02) | LF | 468 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.50 |
| 26 | Loop wire (730-14.03) | LF | 936 | $1.25 | $1.50 | $1.25 | $1.25 | $1.25 | $1.38 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.