TDOT contract CNZ098 bid tabulation
The resurfacing on i-24 from haywood lane (l.m. 21.10) to the rutherford county line (l.m. 27.62), including bridge expansion joint repairs and thin epoxy overlay. Let by Tennessee DOT on March 21, 2025, Davidson County. 4 bids received; low bid $7,112,356 by Vulcan Construction Materials, LLC.
- Owner
- Tennessee DOT
- Letting
- 21 MAR 2025
- Pay items
- 48
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vulcan Construction Materials, LLC | $7,112,356 | Low |
| 2 | Hawkins Asphalt Paving, LLC | $7,510,748 | +6.0% |
| 3 | Jones Bros. Contractors, LLC | $8,788,029 | +24% |
| 4 | Wiregrass Construction Company, Inc | $9,227,763 | +30% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vulcan Construction Materials, LLC | 2. Hawkins Asphalt Paving, LLC | 3. Jones Bros. Contractors, LLC | 4. Wiregrass Construction Company, Inc |
|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 22 | $750.00 | $1,350.00 | $1,300.00 | $3,072.65 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,435 | $36.00 | $59.00 | $52.00 | $73.19 |
| 3 | Bituminous material for tack coat (TC) (403-01) | TON | 201 | $900.00 | $865.00 | $795.00 | $954.06 |
| 4 | Longitudinal joint sealant (411-01.21) | LM | 60 | $2,800.00 | $2,000.00 | $3,400.00 | $2,803.98 |
| 5 | Acs mix(PG76-22) grading D (411-03.10) | TON | 32,036 | $123.50 | $135.85 | $155.00 | $172.58 |
| 6 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 21.70 | $575.00 | $950.00 | $1,225.00 | $575.82 |
| 7 | Cold planing bituminous pavement (415-01.01) | TON | 31,734 | $22.75 | $22.22 | $34.25 | $28.52 |
| 8 | Applied texture finish (existing structures) (604-04.02) | SY | 35,768 | $10.95 | $12.00 | $10.95 | $10.97 |
| 9 | Traffic control (712-01) | LS | 1 | $215,000 | $161,850 | $210,000 | $289,011 |
| 10 | Flexible drums (channelizing) (712-04.01) | EACH | 400 | $48.00 | $31.00 | $43.00 | $31.04 |
| 11 | Warning lights (type C) (712-05.03) | EACH | 100 | $20.00 | $20.00 | $1.00 | $20.03 |
| 12 | Signs (construction) (712-06) | SF | 2,984 | $8.50 | $7.50 | $7.65 | $7.51 |
| 13 | Signs (construction)(reduced speed warning) (712-06.16) | EACH | 11 | $600.00 | $450.00 | $590.00 | $450.64 |
| 14 | Temporary barricades (type III) (712-07.03) | LF | 24 | $23.00 | $28.00 | $17.25 | $28.04 |
| 15 | Arrow board (type C) (712-08.03) | EACH | 2 | $950.00 | $1,200.00 | $1,700.00 | $1,201.71 |
| 16 | Speed feedback sign assembly (712-08.08) | EACH | 2 | $3,700.00 | $4,950.00 | $5,900.00 | $4,957.04 |
| 17 | Digital speed limit sign assembly (712-08.09) | EACH | 10 | $3,500.00 | $4,950.00 | $6,350.00 | $4,957.04 |
| 18 | Queue protection truck (712-08.12) | DAY | 120 | $1,250.00 | $1,200.00 | $1,350.00 | $1,201.71 |
| 19 | Changeable message sign unit (713-16.01) | EACH | 2 | $3,700.00 | $5,750.00 | $6,500.00 | $5,758.18 |
| 20 | Signs (R5-1A) (713-16.20) | EACH | 4 | $300.00 | $225.00 | $300.00 | $225.32 |
| 21 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 28 | $35.00 | $35.00 | $34.00 | $35.05 |
| 22 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 3,527 | $35.00 | $35.00 | $36.00 | $35.05 |
| 23 | Removal of snowplowable reflective marker (716-01.30) | EACH | 3,469 | $12.00 | $8.25 | $18.00 | $12.02 |
| 24 | Plastic pavement marking (stop line) (716-02.05) | LF | 54 | $25.00 | $25.00 | $20.00 | $25.04 |
| 25 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 2 | $200.00 | $200.00 | $200.00 | $200.29 |
| 26 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 1,950 | $12.00 | $12.00 | $18.00 | $12.02 |
| 27 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 2 | $300.00 | $300.00 | $350.00 | $300.43 |
| 28 | Plastic pavement marking(double turning arrow) (716-04.02) | EACH | 2 | $400.00 | $400.00 | $350.00 | $400.57 |
| 29 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 4 | $200.00 | $200.00 | $200.00 | $200.29 |
| 30 | Plastic pavement marking (wrong way arrow) (716-04.06) | EACH | 2 | $350.00 | $350.00 | $100.00 | $350.50 |
| 31 | Plastic pavement marking (exit only arrow) (716-04.07) | EACH | 11 | $450.00 | $450.00 | $300.00 | $450.64 |
| 32 | Plastic pavement marking (H.O.V. diamond) (716-04.09) | EACH | 43 | $450.00 | $450.00 | $120.00 | $450.64 |
| 33 | Plastic pavement marking (yield line) (716-04.12) | SF | 27 | $40.00 | $40.00 | $45.00 | $40.06 |
| 34 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 3 | $650.00 | $650.00 | $600.00 | $650.92 |
| 35 | Painted pavement marking (6" line) (716-05.20) | LM | 26 | $1,600.00 | $1,600.00 | $1,250.00 | $1,602.28 |
| 36 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 26 | $7,500.00 | $7,500.00 | $7,500.00 | $7,510.67 |
| 37 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 4,190 | $2.00 | $2.00 | $2.50 | $2.00 |
| 38 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 1,614 | $2.00 | $2.00 | $1.20 | $2.00 |
| 39 | Enhanced flat line thermo (12IN barrier line) (716-12.08) | LF | 2,710 | $5.00 | $5.00 | $12.00 | $5.01 |
| 40 | Enhanced flat line thermo (12IN dotted) (716-12.10) | LF | 29,682 | $2.00 | $2.00 | $2.25 | $2.00 |
| 41 | Preformed permanent tape (6IN line) (716-15.10) | LF | 3,694 | $8.00 | $8.00 | $4.70 | $8.01 |
| 42 | Preformed permanent tape (12IN line) (716-15.12) | LF | 240 | $15.00 | $15.00 | $9.50 | $15.02 |
| 43 | Mobilization (717-01) | LS | 1 | $60,000 | $165,000 | $230,000 | $202,330 |
| 44 | Concrete slab repairs (604-10.11) | SY | 50 | $1,100.00 | $1,100.00 | $2,000.00 | $2,503.56 |
| 45 | Expansion joint repairs (604-10.44) | LF | 272 | $275.00 | $106.00 | $106.00 | $106.15 |
| 46 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 20 | $775.00 | $897.00 | $897.00 | $898.28 |
| 47 | Concrete repairs (604-10.53) | SY | 15 | $775.00 | $775.00 | $2,000.00 | $1,552.21 |
| 48 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 9,220 | $37.80 | $36.00 | $36.00 | $36.05 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.