TDOT contract CN263046 bid tabulation

The resurfacing on u.s. 231 (s.r. 10) from s.r. 268 (compton road) (l.m. 17.89) to the wilson county line (l.m. 24.97). Let by Tennessee DOT on June 26, 2026, Rutherford County. 3 bids received; low bid $1,627,881 by Hawkins Asphalt Paving, LLC.

Owner
Tennessee DOT
Letting
26 JUN 2026
Pay items
37
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hawkins Asphalt Paving, LLC$1,627,881Low
2Pavement Restorations, Inc.$1,768,066+9.0%
3Vulcan Construction Materials, LLC$1,983,143+22%
TDOT contract CN263046: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hawkins Asphalt Paving, LLC2. Pavement Restorations, Inc.3. Vulcan Construction Materials, LLC
1Brooming & degrassing shoulders (208-01.05)LM13$900.00$1,200.00$2,000.00
2Mineral aggregate, type A base, grading D (303-01)TON859$38.50$45.00$45.00
3Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON500$140.00$145.00$155.00
4Bituminous material for tack coat (TC) (403-01)TON63$950.00$4.15$1,100.00
5Acs mix(PG70-22) thin lift D asphalt (411-03.13)TON7,592$128.00$155.00$162.00
6Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM0.80$580.00$580.00$580.00
7Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM9.60$580.00$580.00$580.00
8Cold planing bituminous pavement (415-01.01)TON1,609$38.00$30.00$50.00
9Tangent energy absorbing term MASH TL-3 (705-06.20)EACH5$3,500.00$2,975.00$2,975.00
10Guardrail removed (706-01)LF250$1.00$1.00$1.00
11Traffic control (712-01)LS1$41,500$65,000$80,000
12Flexible drums (channelizing) (712-04.01)EACH75$14.00$29.00$40.00
13Signs (construction) (712-06)SF1,620$5.50$6.85$10.00
14Arrow board (type C) (712-08.03)EACH2$900.00$1,100.00$1,250.00
15Removal of existing sign post (713-15.01)EACH1$500.00$25.00$150.00
16Signs (double-sided 12"X36" object marker OM-3) (713-16.20)EACH4$85.00$125.00$225.00
17Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH847$35.00$35.00$35.00
18Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH111$35.00$35.00$35.00
19Removal of snowplowable reflective marker (716-01.30)EACH958$8.50$10.00$10.00
20Plastic pavement marking(channelization striping) (716-02.04)SY796$35.00$35.00$35.00
21Plastic pavement marking (stop line) (716-02.05)LF284$16.00$16.00$16.00
22Plastic pavement marking (turn lane arrow) (716-02.06)EACH34$150.00$150.00$150.00
23Plastic pavement marking (24" barrier line) (716-02.07)LF400$15.00$15.00$15.00
24Plastic pavement marking (8" dotted line) (716-02.08)LF920$1.50$1.50$1.50
25Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF90$35.00$35.00$35.00
26Plastic pavement marking (6" dotted line) (716-02.11)LF130$1.00$1.00$1.00
27Plastic pavement marking (8IN line) (716-02.12)LM0.40$6,700.00$6,700.00$6,700.00
28Plastic word pavement marking (only) (716-03.01)EACH2$400.00$400.00$400.00
29Plastic pavement marking (lane reduction arrow) (716-04.14)EACH2$400.00$400.00$400.00
30Painted pavement marking (6" line) (716-05.20)LM3.90$900.00$900.00$900.00
31Removal of pavement marking (line) (716-08.01)LF2,139$0.90$0.90$0.90
32Contrast pavement marking 6" (716-09.83)LF1,901$2.80$2.80$2.80
33Contrast pavement shadow marking 6" (716-09.97)LF476$1.25$1.25$1.25
34Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM29.50$6,000.00$6,000.00$6,000.00
35Mobilization (717-01)LS1$50,000$21,439$45,000
36Saw slot (730-14.02)LF1,370$5.00$4.50$4.50
37Loop wire (730-14.03)LF3,140$1.00$0.75$0.75
TDOT contract CN263046: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy