TDOT contract CN263051 bid tabulation
Microsurfacing or thin mix overlay on u.s. 31a (s.r. 11) from near sw forest street in marshall county (l.m. 26.03) to the rutherford county line in williamson county (l.m. 0.73), including bridge expansion joint repair. Let by Tennessee DOT on June 26, 2026, Marshall And Williamson Counties. 4 bids received; low bid $1,480,567 by Asphalt Paving Systems, Inc..
- Owner
- Tennessee DOT
- Letting
- 26 JUN 2026
- Pay items
- 29
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Asphalt Paving Systems, Inc. | $1,480,567 | Low |
| 2 | Hawkins Asphalt Paving, LLC | $1,558,446 | +5.0% |
| 3 | Rogers Group, Inc. | $1,598,100 | +8.0% |
| 4 | Pavement Restorations, Inc. | $1,688,947 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Asphalt Paving Systems, Inc. | 2. Hawkins Asphalt Paving, LLC | 3. Rogers Group, Inc. | 4. Pavement Restorations, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 13.20 | $1,000.00 | $1,000.00 | $2,500.00 | $1,100.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 2,628 | $55.00 | $38.00 | $35.50 | $50.00 |
| 3 | Bituminous material (BSC) (405-01.01) | TON | 178 | $583.48 | $1,150.00 | $1,075.00 | $1,060.00 |
| 4 | Mineral aggregate (BSC) (405-01.02) | TON | 1,555 | $100.20 | $80.00 | $62.75 | $85.00 |
| 5 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 9.40 | $1,233.75 | $750.00 | $1,550.00 | $1,000.00 |
| 6 | Traffic control (712-01) | LS | 1 | $56,927 | $35,000 | $74,600 | $71,000 |
| 7 | Flexible drums (channelizing) (712-04.01) | EACH | 50 | $1.05 | $14.00 | $10.50 | $25.00 |
| 8 | Signs (construction) (712-06) | SF | 1,544 | $6.41 | $5.00 | $7.40 | $7.00 |
| 9 | Changeable message sign unit (713-16.01) | EACH | 2 | $3,675.00 | $4,000.00 | $1,055.00 | $3,800.00 |
| 10 | Signs (description) (713-16.20) | EACH | 9 | $315.00 | $45.00 | $145.00 | $326.00 |
| 11 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 348 | $42.00 | $40.00 | $42.25 | $33.00 |
| 12 | Removal of snowplowable reflective marker (716-01.30) | EACH | 332 | $12.60 | $10.00 | $12.65 | $33.00 |
| 13 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 9.30 | $52.50 | $50.00 | $52.75 | $31.00 |
| 14 | Plastic pavement marking (stop line) (716-02.05) | LF | 501 | $21.00 | $20.00 | $21.10 | $28.00 |
| 15 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 139 | $10.50 | $10.00 | $10.60 | $13.00 |
| 16 | Painted pavement marking (6" line) (716-05.20) | LM | 50 | $1,575.00 | $1,500.00 | $1,585.00 | $1,200.00 |
| 17 | Removal of pavement marking (channelization striping) (716-08.04) | SY | 40 | $31.50 | $30.00 | $31.65 | $17.00 |
| 18 | Removal of pavement marking (stop line) (716-08.05) | LF | 501 | $10.50 | $10.00 | $10.55 | $13.00 |
| 19 | Removal of pavement marking (line) (716-08.20) | LM | 25 | $2,100.00 | $2,000.00 | $2,110.00 | $3,800.00 |
| 20 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 25 | $7,980.00 | $7,600.00 | $8,025.00 | $7,800.00 |
| 21 | Mobilization (717-01) | LS | 1 | $99,900 | $69,000 | $74,499 | $151,000 |
| 22 | Saw slot (730-14.02) | LF | 936 | $5.78 | $5.00 | $5.25 | $6.00 |
| 23 | Loop wire (730-14.03) | LF | 1,872 | $1.05 | $1.00 | $1.05 | $1.50 |
| 24 | Expansion joint repairs (604-10.44) | LF | 100 | $141.75 | $175.50 | $158.00 | $165.00 |
| 25 | Bituminous material for tack coat (TC) (403-01) | TON | 43 | $1,000.00 | $970.00 | ||
| 26 | Acs mix(PG64-22) thin lift asphalt (411-03.07) | TON | 4,277 | $133.50 | $133.00 | ||
| 27 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 18 | $1,015.00 | $1,550.00 | ||
| 28 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 175 | $1,465.30 | $1,140.00 | ||
| 29 | Aggregate for micro surfacing (414-03.02) | TON | 1,455 | $144.20 | $220.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.