TDOT contract CNZ002 bid tabulation
The resurfacing on u.s. 41 (s.r. 2) from kensington square court (l.m. 1.80) to south of cedar grove road (l.m. 6.78). Let by Tennessee DOT on February 7, 2025, Rutherford County. 5 bids received; low bid $1,764,213 by Wiregrass Construction Company, Inc.
- Owner
- Tennessee DOT
- Letting
- 07 FEB 2025
- Pay items
- 30
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Wiregrass Construction Company, Inc | $1,764,213 | Low |
| 2 | Volunteer Paving, LLC | $1,923,484 | +9.0% |
| 3 | Hawkins Asphalt Paving, LLC | $1,950,103 | +11% |
| 4 | Tinsley Asphalt, LLC | $1,993,545 | +13% |
| 5 | Vulcan Construction Materials, LLC | $1,998,188 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Wiregrass Construction Company, Inc | 2. Volunteer Paving, LLC | 3. Hawkins Asphalt Paving, LLC | 4. Tinsley Asphalt, LLC | 5. Vulcan Construction Materials, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 10 | $1,963.03 | $1,981.68 | $1,650.00 | $1,325.00 | $1,500.00 |
| 2 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 88 | $146.64 | $325.32 | $197.00 | $150.00 | $325.00 |
| 3 | Bituminous material for tack coat (TC) (403-01) | TON | 64 | $699.63 | $988.45 | $750.00 | $875.00 | $1,000.00 |
| 4 | Acs mix(PG70-22) grading D (411-02.10) | TON | 9,643 | $131.35 | $131.61 | $136.00 | $135.80 | $135.00 |
| 5 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 6.80 | $996.23 | $1,105.59 | $1,446.00 | $724.50 | $995.00 |
| 6 | Cold planing bituminous pavement (415-01.01) | TON | 9,458 | $11.96 | $19.96 | $20.75 | $28.00 | $27.00 |
| 7 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 5 | $1,251.55 | $2,100.00 | $16.50 | $2,100.00 | $1,250.00 |
| 8 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 2 | $3,954.90 | $3,780.00 | $3,600.00 | $3,780.00 | $3,950.00 |
| 9 | Guardrail removed (706-01) | LF | 100 | $1.00 | $4.73 | $4.50 | $4.73 | $1.00 |
| 10 | Traffic control (712-01) | LS | 1 | $54,668 | $75,716 | $65,000 | $71,155 | $63,500 |
| 11 | Signs (construction) (712-06) | SF | 894 | $7.31 | $7.88 | $7.30 | $7.67 | $10.00 |
| 12 | Arrow board (type C) (712-08.03) | EACH | 2 | $200.25 | $1,260.00 | $200.00 | $210.00 | $1,000.00 |
| 13 | Removal of existing delineators (713-02.11) | EACH | 50 | $5.01 | $21.00 | $5.00 | $5.25 | $12.50 |
| 14 | Flexible delineator (white) (713-02.14) | EACH | 50 | $52.06 | $68.25 | $52.00 | $54.60 | $49.00 |
| 15 | Remove sign, support & footing (713-15.36) | EACH | 6 | $20.03 | $630.00 | $20.00 | $21.00 | $55.00 |
| 16 | Changeable message sign unit (713-16.01) | EACH | 2 | $2,002.48 | $6,273.75 | $6,450.00 | $4,000.00 | $3,500.00 |
| 17 | Signs (R1-1) (713-16.20) | EACH | 5 | $225.28 | $393.75 | $225.00 | $236.25 | $195.00 |
| 18 | Signs (W3-5) (713-16.24) | EACH | 1 | $235.29 | $288.75 | $235.00 | $246.75 | $325.00 |
| 19 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 330 | $34.04 | $45.00 | $35.00 | $35.70 | $35.00 |
| 20 | Removal of snowplowable reflective marker (716-01.30) | EACH | 330 | $16.02 | $10.00 | $10.75 | $10.00 | $12.00 |
| 21 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 195 | $35.04 | $35.00 | $10.00 | $36.75 | $10.00 |
| 22 | Plastic pavement marking (stop line) (716-02.05) | LF | 810 | $18.02 | $20.00 | $20.00 | $18.90 | $20.00 |
| 23 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 33 | $165.20 | $225.00 | $200.00 | $173.25 | $200.00 |
| 24 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 3 | $185.23 | $225.00 | $200.00 | $194.25 | $200.00 |
| 25 | Painted pavement marking (4" line) (716-05.01) | LM | 17.30 | $1,001.24 | $1,000.00 | $1,400.00 | $1,050.00 | $1,400.00 |
| 26 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 17.30 | $6,007.44 | $7,000.00 | $6,800.00 | $6,300.00 | $6,800.00 |
| 27 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 1,208 | $1.10 | $2.50 | $2.00 | $1.16 | $2.00 |
| 28 | Mobilization (717-01) | LS | 1 | $41,036 | $16,879 | $60,500 | $40,850 | $32,500 |
| 29 | Saw slot (730-14.02) | LF | 1,370 | $4.00 | $6.30 | $4.00 | $4.20 | $4.00 |
| 30 | Loop wire (730-14.03) | LF | 3,140 | $1.00 | $1.05 | $1.00 | $1.05 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.