TDOT contract CNZ204 bid tabulation
The resurfacing on u.s. 41 (u.s. 70s, s.r. 1) from north of florence road (l.m. 9.80) to s.r. 268 (l.m. 14.10). Let by Tennessee DOT on June 27, 2025, Rutherford County. 3 bids received; low bid $2,960,096 by Hawkins Asphalt Paving, LLC.
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 56
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Hawkins Asphalt Paving, LLC | $2,960,096 | Low |
| 2 | Vulcan Construction Materials, LLC | $3,157,180 | +7.0% |
| 3 | Jones Bros. Contractors, LLC | $3,497,038 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Hawkins Asphalt Paving, LLC | 2. Vulcan Construction Materials, LLC | 3. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 17.20 | $915.00 | $2,000.00 | $1,150.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 2,277 | $30.75 | $42.00 | $42.50 |
| 3 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 2,000 | $99.50 | $102.50 | $125.00 |
| 4 | Bituminous material for tack coat (TC) (403-01) | TON | 89 | $850.00 | $975.00 | $800.00 |
| 5 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 2,870 | $98.00 | $118.00 | $121.00 |
| 6 | Longitudinal joint sealant (411-01.21) | LM | 17.50 | $2,295.00 | $2,950.00 | $2,950.00 |
| 7 | Acs mix(PG70-22) grading D (411-02.10) | TON | 10,566 | $122.00 | $118.00 | $140.00 |
| 8 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 6.90 | $1,105.00 | $1,350.00 | $1,350.00 |
| 9 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 6.90 | $1,105.00 | $1,350.00 | $1,350.00 |
| 10 | Cold planing bituminous pavement (415-01.01) | TON | 14,277 | $16.00 | $23.50 | $28.50 |
| 11 | Adjustment of existing manhole (611-01.20) | EACH | 1 | $250.00 | $4,000.00 | $4,000.00 |
| 12 | Adjustment of existing catchbasin (611-09.01) | EACH | 7 | $300.00 | $1,750.00 | $1,750.00 |
| 13 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 4 | $100.00 | $100.00 | $180.00 |
| 14 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 3 | $1,400.00 | $1,500.00 | $1,800.00 |
| 15 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $1,700.00 | $1,300.00 | $1,488.00 |
| 16 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 3 | $3,400.00 | $3,900.00 | $3,560.00 |
| 17 | Guardrail removed (706-01) | LF | 160 | $3.00 | $8.00 | $1.00 |
| 18 | Traffic control (712-01) | LS | 1 | $48,600 | $80,000 | $90,000 |
| 19 | Flexible drums (channelizing) (712-04.01) | EACH | 350 | $34.00 | $42.00 | $30.00 |
| 20 | Warning lights (type C) (712-05.03) | EACH | 50 | $1.00 | $20.00 | $5.00 |
| 21 | Signs (construction) (712-06) | SF | 2,601 | $7.60 | $10.25 | $7.50 |
| 22 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,450.00 | $900.00 | $1,000.00 |
| 23 | Queue protection truck (712-08.12) | DAY | 120 | $1,285.00 | $1,250.00 | $1,100.00 |
| 24 | Flexible delineator (white) (713-02.14) | EACH | 15 | $42.00 | $75.00 | $55.00 |
| 25 | Sign post delineation enhancement (713-02.21) | LF | 72 | $7.00 | $6.50 | $5.00 |
| 26 | Remove sign, support & footing (713-15.36) | EACH | 10 | $35.00 | $75.00 | $20.00 |
| 27 | Changeable message sign unit (713-16.01) | EACH | 3 | $5,800.00 | $4,000.00 | $5,500.00 |
| 28 | Signs (R1-1 stop 36"X36" at van cleve lane) (713-16.20) | EACH | 1 | $200.00 | $285.00 | $350.00 |
| 29 | Signs (W2-2 intersection advance warning 36"X36") (713-16.21) | EACH | 2 | $230.00 | $290.00 | $250.00 |
| 30 | Signs (W10-1 railroad advance warning 36") (713-16.22) | EACH | 4 | $230.00 | $290.00 | $250.00 |
| 31 | Signs (W10-2 railroad intersection advance warning 36"X36") (713-16.23) | EACH | 2 | $230.00 | $290.00 | $250.00 |
| 32 | Signs (W10-3 railroad intersection advance warning 36"X36") (713-16.24) | EACH | 2 | $230.00 | $290.00 | $250.00 |
| 33 | Signs (W10-4 railroad intersection advance warning 36"X36") (713-16.25) | EACH | 1 | $230.00 | $290.00 | $250.00 |
| 34 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 120 | $40.00 | $40.00 | $35.00 |
| 35 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 159 | $40.00 | $40.00 | $34.00 |
| 36 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 765 | $40.00 | $40.00 | $36.00 |
| 37 | Removal of snowplowable reflective marker (716-01.30) | EACH | 570 | $9.00 | $12.00 | $18.00 |
| 38 | Plastic pavement marking (cross-walk) (716-02.03) | LF | 110 | $15.00 | $15.00 | $30.00 |
| 39 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 304 | $15.00 | $15.00 | $35.00 |
| 40 | Plastic pavement marking (stop line) (716-02.05) | LF | 504 | $25.00 | $25.00 | $20.00 |
| 41 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 41 | $200.00 | $200.00 | $200.00 |
| 42 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 1,784 | $12.00 | $12.00 | $18.00 |
| 43 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 2,534 | $3.50 | $3.50 | $2.50 |
| 44 | Plastic pavement marking (6" dotted line) (716-02.11) | LF | 2,621 | $2.00 | $2.00 | $2.00 |
| 45 | Plastic pavement marking (8IN line) (716-02.12) | LM | 1.50 | $12,000 | $12,000 | $10,000 |
| 46 | Plastic pavement marking (12IN DWL) (716-02.24) | LF | 687 | $5.00 | $5.00 | $3.00 |
| 47 | Plastic word pavement marking (only) (716-03.01) | EACH | 5 | $450.00 | $450.00 | $450.00 |
| 48 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 5 | $1,100.00 | $1,100.00 | $700.00 |
| 49 | Painted pavement marking (6" line) (716-05.20) | LM | 21.10 | $1,800.00 | $1,800.00 | $1,300.00 |
| 50 | Removal of pavement marking (line) (716-08.01) | LF | 1,292 | $1.25 | $1.25 | $1.50 |
| 51 | Contrast pavement marking 6" (716-09.86) | LM | 0.20 | $30,000 | $30,000 | $18,000 |
| 52 | Contrast pavement shadow marking 6" (716-09.94) | LM | 0.10 | $50,000 | $50,000 | $7,500.00 |
| 53 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 21.10 | $8,000.00 | $8,000.00 | $8,000.00 |
| 54 | Mobilization (717-01) | LS | 1 | $97,500 | $50,000 | $90,000 |
| 55 | Saw slot (730-14.02) | LF | 1,186 | $5.00 | $4.00 | $4.00 |
| 56 | Loop wire (730-14.03) | LF | 2,872 | $2.00 | $0.80 | $0.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.