TDOT contract CN262015 bid tabulation

289(5),93s289-f3-002,93s289-f8-002 the resurfacing on s.r. 135 from s.r. 289 (l.m. 0.00) to south of s.r. 111 (l.m. 2.10), including bridge expansion joint repair, and on s.r. 289 from u.s. 70 (s.r. 26, s.r. 1) (l.m. 0.00) to s.r. 111 (l.m. 2.61). Let by Tennessee DOT on February 6, 2026, White County. 2 bids received; low bid $1,545,281 by Rogers Group, Inc..

Owner
Tennessee DOT
Letting
06 FEB 2026
Pay items
36
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$1,545,281Low
2Vulcan Construction Materials, LLC$1,628,372+5.0%
TDOT contract CN262015: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.2. Vulcan Construction Materials, LLC
1Brooming & degrassing shoulders (208-01.05)LM9.40$1,800.00$2,500.00
2Mineral aggregate, type A base, grading D (303-01)TON578$44.50$42.00
3Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON100$164.50$170.00
4Trackless tack coat (403-02.01)TON45$960.00$950.00
5Acs mix(PG64-22) grading D (411-01.10)TON6,432$124.00$130.00
6Longitudinal joint sealant (411-01.21)LM12.20$2,798.25$2,950.00
7Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM2.10$792.00$750.00
8Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM1.20$792.00$750.00
9Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM2$792.00$750.00
10Cold planing bituminous pavement (415-01.01)TON6,506$26.00$37.00
11Guardrail delineation enhancement (BI-directional) (705-04.22)EACH200$6.00$8.50
12Traffic control (712-01)LS1$73,400$72,000
13Flexible drums (channelizing) (712-04.01)EACH28$29.50$15.00
14Signs (construction) (712-06)SF2,370$8.00$9.00
15Arrow board (type C) (712-08.03)EACH2$897.50$900.00
16Changeable message sign unit (713-16.01)EACH4$3,379.00$3,500.00
17Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH270$42.25$40.00
18Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH80$42.25$40.00
19Removal of snowplowable reflective marker (716-01.30)EACH159$10.75$10.00
20Plastic pavement marking(channelization striping) (716-02.04)SY169$24.50$23.00
21Plastic pavement marking (stop line) (716-02.05)LF793$10.75$10.00
22Plastic pavement marking (turn lane arrow) (716-02.06)EACH17$185.00$175.00
23Plastic pavement marking (8" dotted line) (716-02.08)LF88$3.25$3.00
24Plastic pavement marking (8IN line) (716-02.12)LM0.30$11,087$10,500
25Plastic pavement marking (straight-turn arrow) (716-04.01)EACH3$290.50$275.00
26Plastic pavement marking (transverse shoulder) (716-04.04)LF720$7.50$7.00
27Plastic pavement marking (yield line) (716-04.12)SF30$16.00$15.00
28Painted pavement marking (4" line) (716-05.01)LM21$1,029.50$975.00
29Hydroblast removal of pavement marking (line) (716-08.30)LM0.30$15,839$15,000
30Wet reflective pavement marking(6" line) (716-09.03)LM0.30$38,013$36,000
31Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM17$6,863.50$6,500.00
32Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF92$2.10$2.00
33Mobilization (717-01)LS1$42,366$42,000
34Saw slot (730-14.02)LF1,824$5.25$5.00
35Loop wire (730-14.03)LF6,384$1.10$1.00
36Expansion joint repairs (604-10.44)LF177$406.50$275.00
TDOT contract CN262015: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy