TDOT contract CN262013 bid tabulation

002,89s055-f8-002 the resurfacing (microsurface or thin mix overlay) on s.r. 55 from s.r. 379 (l.m. 1.10) to east of hallum lane (l.m. 8.55) and on s.r. 55 bus from s.r. 55 (l.m. 0.00) to s.r. 56 (l.m. 3.19). Let by Tennessee DOT on February 6, 2026, Warren County. 3 bids received; low bid $2,347,281 by Asphalt Paving Systems, Inc..

Owner
Tennessee DOT
Letting
06 FEB 2026
Pay items
62
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Asphalt Paving Systems, Inc.$2,347,281Low
2Tinsley Asphalt, LLC$2,905,511+24%
3Rogers Group, Inc.$3,149,020+34%
TDOT contract CN262013: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Asphalt Paving Systems, Inc.2. Tinsley Asphalt, LLC3. Rogers Group, Inc.
1Brooming & degrassing shoulders (208-01.05)LM22$1,000.00$413.49$1,862.00
2High performance fog seals (403-01.10)SY126,996$0.40$0.52$0.65
3Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM2.45$787.50$772.50$801.00
4Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM2.35$787.50$772.50$801.00
5Gray iron castings (catchbasin) (611-03.04)LB250$11.55$6.00$7.00
6Adjustment of existing catchbasin (611-09.01)EACH1$4,620.00$4,532.00$4,800.00
7Single guardrail (type 2) (705-02.02)LF50$31.50$30.90$25.25
8Guardrail transition 27IN to 31IN (705-02.10)EACH1$157.50$154.50$53.50
9Guardrail delineation enhancement (BI-directional) (705-04.22)EACH1,963$4.41$4.33$10.00
10GR terminal (in-inline) MASH TL-3 (705-06.11)EACH1$126.00$123.60$1,975.50
11Tangent energy absorbing term MASH TL-3 (705-06.20)EACH1$3,570.00$3,502.00$3,203.25
12Guardrail removed (706-01)LF100$2.10$2.06$0.75
13Radius rail (706-06.03)LF38$52.50$51.50$37.50
14Traffic control (712-01)LS1$75,000$40,950$78,060
15Flexible drums (channelizing) (712-04.01)EACH62$30.45$29.87$30.00
16Signs (construction) (712-06)SF2,319$7.04$6.90$7.50
17Arrow board (type C) (712-08.03)EACH2$945.00$900.00$1,175.00
18Remove sign, support & footing (713-15.36)EACH2$105.00$103.00$160.50
19Changeable message sign unit (713-16.01)EACH4$5,775.00$2,000.00$1,068.00
20Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH1,509$37.80$37.08$38.50
21Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH1,304$37.80$37.08$38.50
22Removal of snowplowable reflective marker (716-01.30)EACH2,813$10.50$10.00$10.75
23Plastic pavement marking(channelization striping) (716-02.04)SY438$21.00$20.60$21.50
24Plastic pavement marking (stop line) (716-02.05)LF1,247$10.50$10.30$10.75
25Plastic pavement marking (turn lane arrow) (716-02.06)EACH73$183.75$180.25$187.00
26Plastic pavement marking (24" barrier line) (716-02.07)LF467$9.45$9.27$9.75
27Plastic pavement marking (8" dotted line) (716-02.08)LF555$2.10$2.06$2.25
28Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF38$26.25$25.75$27.00
29Plastic pavement marking (8IN line) (716-02.12)LM1$11,025$10,815$11,212
30Plastic word pavement marking (only) (716-03.01)EACH3$157.50$154.50$160.50
31Plastic pavement marking (straight arrow) (716-04.05)EACH4$210.00$206.00$214.00
32Plastic pavement marking (yield line) (716-04.12)SF80$15.75$15.45$16.25
33Plastic pavement marking (lane reduction arrow) (716-04.14)EACH11$315.00$309.00$320.50
34Painted pavement marking (4" line) (716-05.01)LM36.20$892.50$875.50$908.00
35Painted pavement marking (6" line) (716-05.20)LM13$892.50$875.50$908.00
36Removal of pavement marking (8" barrier line) (716-08.02)LF1,858$0.53$0.52$0.75
37Removal of pavement marking (cross-walk) (716-08.03)LF102$4.20$4.12$4.50
38Removal of pavement marking (channelization striping) (716-08.04)SY438$10.50$10.30$10.75
39Removal of pavement marking (stop line) (716-08.05)LF1,349$7.35$7.21$7.50
40Removal of pavement marking (turn lane arrow) (716-08.06)EACH58$84.00$82.40$85.50
41Removal of pavement marking (straight-turn arrow) (716-08.07)EACH1$157.50$154.50$160.50
42Removal of pavement marking (dotted line) (716-08.09)LF464$0.53$0.52$0.75
43Removal of word pavement marking (description) (716-08.11)EACH4$105.00$103.00$107.00
44Removal of pavement marking (yield line) (716-08.19)SF80$2.10$2.06$2.25
45Removal of pavement marking (line) (716-08.20)LM42.20$2,940.00$2,884.00$3,000.00
46Removal of pavement marking (24IN barrier line) (716-08.21)LF545$7.35$7.21$7.50
47Removal of pavement marking (straight arrow) (716-08.23)EACH4$105.00$103.00$107.00
48Removal of pavement marking (lane reduction arrow) (716-08.24)EACH8$157.50$154.50$80.25
49Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM49.20$6,615.00$6,489.00$6,727.00
50Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03)LF1,858$2.10$2.06$2.50
51Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF427$2.10$2.06$2.25
52Enhanced flat line thermo (12IN line) (716-12.09)LF358$3.15$3.09$3.25
53Mobilization (717-01)LS1$35,000$45,800$70,000
54Saw slot (730-14.02)LF588$7.30$5.15$7.00
55Loop wire (730-14.03)LF1,764$2.36$1.03$1.50
56Trackless tack coat (403-02.01)TON116$965.70$904.50
57Acs mix(PG70-22) thin lift asphalt (411-03.08)TON14,194$130.56$137.00
58Cold planing bituminous pavement (415-01.01)TON251$50.00$83.00
59Bituminous material for tack coat (micro-surfacing) (403-01.01)TON45$675.00
60Emulsified asphalt for micro-surfacing (414-03.01)TON622$1,420.75
61Aggregate for micro surfacing (414-03.02)TON5,179$84.05
62Cold planing bituminous pavement (415-01.01)TON48$283.50
TDOT contract CN262013: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy