TDOT contract CN263022 bid tabulation
The resurfacing on u.s. 41a (s.r. 12) from u.s. 31e (s.r. 6) (l.m. 0.00) to near s.r. 112 (l.m. 4.30), including bridge deck repair and thin epoxy overlay. Let by Tennessee DOT on February 6, 2026, Davidson County. 3 bids received; low bid $3,487,173 by Vulcan Construction Materials, LLC.
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 55
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vulcan Construction Materials, LLC | $3,487,173 | Low |
| 2 | Rogers Group, Inc. | $3,695,698 | +6.0% |
| 3 | Jones Bros. Contractors, LLC | $3,833,578 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vulcan Construction Materials, LLC | 2. Rogers Group, Inc. | 3. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 13.70 | $2,400.00 | $1,600.00 | $2,500.00 |
| 2 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 300 | $93.00 | $132.00 | $145.00 |
| 3 | Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15) | TON | 100 | $150.00 | $150.00 | $180.00 |
| 4 | Bituminous material for tack coat (TC) (403-01) | TON | 71 | $900.00 | $1,000.00 | $885.00 |
| 5 | Acs mix(PG64-22) grading D (411-01.10) | TON | 10,801 | $117.00 | $129.50 | $145.50 |
| 6 | Cold planing bituminous pavement (415-01.01) | TON | 10,698 | $29.00 | $32.50 | $33.50 |
| 7 | Adjustment of existing manhole (611-01.20) | EACH | 4 | $900.00 | $985.00 | $900.00 |
| 8 | Gray iron castings (catchbasin) (611-03.04) | LB | 2,010 | $4.00 | $4.40 | $4.00 |
| 9 | Adjustment of existing catchbasin (611-09.01) | EACH | 14 | $700.00 | $770.00 | $700.00 |
| 10 | Traffic control (712-01) | LS | 1 | $160,000 | $173,250 | $100,000 |
| 11 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $25.00 | $27.75 | $26.00 |
| 12 | Signs (construction) (712-06) | SF | 2,821 | $8.50 | $7.50 | $7.05 |
| 13 | Arrow board (type C) (712-08.03) | EACH | 2 | $950.00 | $1,015.00 | $950.00 |
| 14 | Signs (R3-17, 24" X 18", bike lane) (713-16.20) | EACH | 40 | $260.00 | $240.00 | $225.00 |
| 15 | Signs (W11-1, 24" X 24", bike caution) (713-16.21) | EACH | 17 | $285.00 | $250.00 | $235.00 |
| 16 | Signs (W16-1P, 18" X 24", share the road) (713-16.22) | EACH | 17 | $125.00 | $240.00 | $225.00 |
| 17 | Signs (D11-1, 24" X 18", bike route) (713-16.23) | EACH | 17 | $285.00 | $240.00 | $225.00 |
| 18 | Signs (R4-4, 36" X 30", yield to bikes) (713-16.24) | EACH | 11 | $320.00 | $295.00 | $275.00 |
| 19 | Signs (R3-7R, 36" X 36", right lane must turn right) (713-16.25) | EACH | 11 | $350.00 | $320.00 | $300.00 |
| 20 | Signs (R3-9CP, 30" X 12", begin) (713-16.26) | EACH | 2 | $75.00 | $230.00 | $215.00 |
| 21 | Signs (R10-15R, 30" X 30", yield to pedestrians right) (713-16.27) | EACH | 10 | $230.00 | $275.00 | $260.00 |
| 22 | Signs (R3-7BP, 24" X 12", except bicycles) (713-16.28) | EACH | 9 | $100.00 | $225.00 | $210.00 |
| 23 | Signs (R3-9DP, 30" X 12", end) (713-16.29) | EACH | 2 | $75.00 | $230.00 | $215.00 |
| 24 | Signs (R10-6A, 24" X 30", stop here on red) (713-16.30) | EACH | 17 | $285.00 | $266.50 | $250.00 |
| 25 | Signs (R10-15L, 30" X 30", yield to pedestrians left) (713-16.31) | EACH | 1 | $250.00 | $277.00 | $260.00 |
| 26 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 422 | $32.00 | $33.60 | $37.00 |
| 27 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 868 | $32.00 | $33.60 | $36.00 |
| 28 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 490 | $35.00 | $36.75 | $35.00 |
| 29 | Plastic pavement marking (stop line) (716-02.05) | LF | 2,401 | $25.00 | $26.25 | $18.00 |
| 30 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 88 | $230.00 | $241.50 | $165.00 |
| 31 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 4,478 | $3.50 | $3.70 | $2.00 |
| 32 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 3,055 | $45.00 | $47.25 | $45.00 |
| 33 | Plastic pavement marking (8IN line) (716-02.12) | LM | 2 | $13,000 | $13,650 | $9,000.00 |
| 34 | Plastic word pavement marking (only) (716-03.01) | EACH | 13 | $600.00 | $630.00 | $410.00 |
| 35 | Plastic word pavement marking (ped-xing) (716-03.08) | EACH | 5 | $650.00 | $685.00 | $750.00 |
| 36 | Plastic PVMT marking (bike symbol) (716-03.12) | EACH | 36 | $450.00 | $475.00 | $450.00 |
| 37 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 15 | $450.00 | $475.00 | $300.00 |
| 38 | Plastic pavement marking(double turning arrow) (716-04.02) | EACH | 1 | $500.00 | $525.00 | $300.00 |
| 39 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 32 | $230.00 | $241.50 | $185.00 |
| 40 | Plastic pavement marking (yield line) (716-04.12) | SF | 159 | $30.00 | $31.50 | $45.00 |
| 41 | Plastic pavement marking (bikelane symbol & arrow) (716-04.13) | EACH | 101 | $500.00 | $525.00 | $450.00 |
| 42 | Plastic pavement marking-bike symbol/arrow shared (716-04.15) | EACH | 47 | $500.00 | $525.00 | $450.00 |
| 43 | Painted pavement marking (6" line) (716-05.20) | LM | 30 | $1,300.00 | $1,370.00 | $1,400.00 |
| 44 | Contrast PVMT shadow marking 6" (tape) (716-09.58) | LM | 0.40 | $40,000 | $42,000 | $7,000.00 |
| 45 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 30 | $7,300.00 | $7,650.00 | $7,500.00 |
| 46 | Preformed permanent tape (6IN line) (716-15.10) | LF | 4,325 | $8.00 | $8.40 | $4.70 |
| 47 | Preformed permanent tape (8IN line) (716-15.11) | LF | 1,175 | $9.00 | $9.45 | $6.30 |
| 48 | Preformed permanent tape (24IN barrier line) (716-15.20) | LF | 66 | $100.00 | $105.00 | $18.75 |
| 49 | Mobilization (717-01) | LS | 1 | $95,000 | $72,000 | $100,000 |
| 50 | Saw slot (730-14.02) | LF | 17,377 | $5.00 | $5.50 | $4.75 |
| 51 | Loop wire (730-14.03) | LF | 38,854 | $1.00 | $1.10 | $0.80 |
| 52 | Flexible delineator (white) (713-02.14) | EACH | 740 | $55.50 | $48.00 | $55.00 |
| 53 | Green textured bike lane (716-04.21) | SY | 2,350 | $95.00 | $99.75 | $125.00 |
| 54 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 50 | $820.00 | $740.00 | $970.20 |
| 55 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 7,588 | $31.00 | $29.00 | $35.73 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.