W-L Construction & Paving, Inc.: TDOT bid record
W-L Construction & Paving, Inc. submitted 15 bids on Tennessee DOT contracts in the data, from 23 MAR 2018 to 26 JUN 2026, and was the low bidder on 9 of them (60%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $23,692,255
- Latest bid
- 26 JUN 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 1 | 100% |
| 2020 | 1 | 1 | 100% |
| 2024 | 3 | 2 | 67% |
| 2025 | 6 | 3 | 50% |
| 2026 | 4 | 2 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Sullivan County | 10 | 4 | 40% |
| Hawkins County | 3 | 3 | 100% |
| Sullivan And Washington | 1 | 1 | 100% |
| Sullivan | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 13 | 11 (85%) | $8.20 | $12.00 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 12 | 11 (92%) | $25.52 | $29.75 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 14 | 10 (71%) | $1,074.75 | $969.62 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 13 | 10 (77%) | $11.00 | $17.30 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 13 | 10 (77%) | $1,585.75 | $1,500.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 12 | 9 (75%) | $32.45 | $34.50 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 12 | 9 (75%) | $1,222.50 | $1,400.00 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 11 | 9 (82%) | $162.30 | $200.68 |
| Warning lights (type A) | 712-05.01 | EACH | 11 | 9 (82%) | $17.50 | $24.00 |
| Spray thermo PVMT MRKNG (60 mil) (6IN line) | 716-13.02 | LM | 9 | 7 (78%) | $3,550.00 | $3,650.00 |
| Plastic pavement marking (straight arrow) | 716-04.05 | EACH | 9 | 7 (78%) | $189.30 | $193.38 |
| Loop wire | 730-14.03 | LF | 8 | 7 (88%) | $1.09 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Summers-Taylor, Inc. | 14 | 6 of 14 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 JUN 2026 | CN261049 | Sullivan County | The resurfacing on s.r. 36 from near lakeside lane (l.m. 2.75) to near summerville road (l.m. 4.78), including thin epoxy overlay on the bri | 2 of 2 | $2,482,173 | +22% |
| 20 MAR 2026 | CN261025 | Sullivan County | The resurfacing on i-26 from u.s. 11w (s.r. 1) (l.m. 0.00) to near welcome center road (l.m. 5.31) | 1 of 2 | $7,160,459 | Low, 7.0% under the second |
| 06 FEB 2026 | CN261004 | Hawkins County | The resurfacing on u.s. 11w (s.r. 1) from near afg road (l.m. 30.60) to near garland avenue (l.m. 36.05), and on s.r. 346 at various section | 1 of 1 | $4,271,649 | Low |
| 06 FEB 2026 | CN261008 | Sullivan County | The resurfacing on u.s. 11e (u.s. 19, s.r. 34) from the washington county line (l.m. 0.00) to near weaver branch road (l.m. 6.10), including | 2 of 2 | $5,162,684 | +17% |
| 05 DEC 2025 | CNZ322 | Sullivan County | The resurfacing on i-81 from near i-26 (l.m. 4.31) to near s.r. 357 (l.m. 9.38) | 2 of 2 | $7,065,023 | +15% |
| 05 DEC 2025 | CNZ128 | Sullivan County | The resurfacing on u.s. 11w (s.r. 1) from the virginia state line (l.m. 23.99) to bob morrison boulevard (l.m. 24.99) | 1 of 2 | $1,118,220 | Low, 11% under the second |
| 05 DEC 2025 | CNZ321 | Sullivan County | The resurfacing (either microsurface or thin mix overlay) on s.r. 358 from s.r. 44 (l.m. 0.00) to near s.r. 394 (l.m. 6.10) | 1 of 2 | $1,082,320 | Low, 47% under the second |
| 21 MAR 2025 | CNZ126 | Sullivan County | The resurfacing on i-81 from the washington county line (l.m. 0.00) to near i-26 (l.m. 4.31), including bridge deck and expansion joint repa | 2 of 2 | $8,418,886 | +23% |
| 07 FEB 2025 | CNZ079 | Hawkins County | The resurfacing on u.s. 11w (s.r. 1) from near garland avenue (l.m. 36.05) to the sullivan county line (l.m. 41.36), including bridge expans | 1 of 2 | $3,971,298 | Low, 2.0% under the second |
| 07 FEB 2025 | CNZ078 | Sullivan County | The resurfacing on u.s. 11e (s.r. 34) from near the holston river (l.m. 6.10) to near beaver creek (l.m. 11.50) | 2 of 2 | $4,324,169 | +14% |
| 04 OCT 2024 | CNY238 | Hawkins County | The resurfacing on s.r. 66 from near choptack road (l.m. 19.23) to the hancock county line (l.m. 29.84) | 1 of 2 | $2,532,612 | Low, 14% under the second |
| 10 MAY 2024 | CNY113 | Sullivan County | The resurfacing on s.r. 394 from u.s. 11w (s.r. 1) (l.m. 0.00) to near i-81 (l.m. 2.54) | 1 of 2 | $823,082 | Low, 1.0% under the second |
| 09 FEB 2024 | CNY012 | Sullivan County | 003,82s036-f8-003 the resurfacing on s.r. 36 from near summerville road (l.m. 4.78) to eastman road (l.m. 7.71), and on s.r. 357 from near s | 2 of 2 | $4,791,588 | +7.0% |
| 15 MAY 2020 | CNU217 | Sullivan And Washington | 94,90010-8216-14 the resurfacing on s.r. 93 in washington county from near s.r. 81 to near davis road (l.m. 1.11 - 3.10) and on s.r. 137 in | 1 of 2 | $1,850,321 | Low, 6.0% under the second |
| 23 MAR 2018 | CNS122 | Sullivan | The resurfacing on s.r. 358 from near s.r. 394 (l.m. 5.98) to u.s. 11e (u.s. 19, s.r. 34) (l.m. 9.45) | 1 of 2 | $882,295 | Low, 1.0% under the second |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.