The resurfacing on i-81 from the washington county line (l.m. 0.00) to near i-26 (l.m. 4.31), including bridge deck and expansion joint repairs. Let by Tennessee DOT on March 21, 2025, Sullivan County. 2 bids received; low bid $6,818,259 by Summers-Taylor, Inc..

Owner
Tennessee DOT
Letting
21 MAR 2025
Pay items
55
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Summers-Taylor, Inc.$6,818,259Low
2W-L Construction & Paving, Inc.$8,418,886+23%
TDOT contract CNZ126: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Summers-Taylor, Inc.2. W-L Construction & Paving, Inc.
1Clearing and grubbing (201-01)LS1$259,200$267,254
2Brooming & degrassing shoulders (208-01.05)LM18$920.00$1,836.30
3Mineral aggregate, type A base, grading D (303-01)TON314$116.00$125.50
4Asphalt concrete mix (PG76-22) grading CM (307-03.12)TON11,490$126.00$143.15
5Bituminous material for tack coat (TC) (403-01)TON67.43$1,100.00$1,179.65
6Acs mix(PG76-22) grading D (411-03.10)TON1,230$180.00$255.65
7Acs mix (PG76-22) ogfc (411-03.23)TON13,397$159.50$177.80
8Scoring shoulders (continuous) (16IN width) (411-12.01)LM18$1,200.00$708.70
9Cold planing bituminous pavement (415-01.01)TON13,731$31.60$32.72
10Resealing joints (hot poured elastic) (502-08.01)LF33,101$2.45$2.65
11Guardrail transition 27IN to 31IN (705-02.10)EACH5$65.00$270.50
12Earth pad for type 38 GR end treatment (705-04.09)EACH5$1,650.00$1,947.60
13Portable barrier rail delineator (705-04.50)EACH40$17.25$54.10
14Tangent energy absorbing term MASH TL-3 (705-06.20)EACH5$3,450.00$4,057.50
15Traffic control (712-01)LS1$210,000$517,408
16Portable barrier rail (MASH TL-3) (712-02.10)LF2,624$65.00$140.60
17Remove and relocate portable barrier rail (712-02.36)LF2,624$41.00$48.40
18Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH4$7,000.00$10,820
19Flexible drums (channelizing) (712-04.01)EACH557$32.00$48.70
20Warning lights (type A) (712-05.01)EACH131$25.00$23.80
21Signs (construction) (712-06)SF3,165$8.00$13.50
22Signs (construction)(reduced speed warning) (712-06.16)EACH4$550.00$649.20
23Arrow board (type C) (712-08.03)EACH6$1,000.00$1,947.60
24Speed feedback sign assembly (712-08.08)EACH4$6,100.00$6,600.20
25Digital speed limit sign assembly (712-08.09)EACH8$6,175.00$6,681.35
26Queue protection truck (712-08.12)DAY42$1,450.00$1,514.80
27Portable queue warning system (712-08.14)DAY12$9,500.00$10,279
28Removable pavement marking (8" barrier line) (712-09.02)LF23,140$3.50$3.80
29Removable pavement marking (6" line) (712-09.08)LF21,553$3.20$3.50
30Removable black-out tape (8IN) (712-09.31)LF1,783$3.50$3.80
31Changeable message sign unit (713-16.01)EACH6$6,200.00$6,492.00
32Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH917$35.00$37.85
33Removal of snowplowable reflective marker (716-01.30)EACH917$7.50$8.15
34Plastic pavement marking (24" barrier line) (716-02.07)LF950$5.75$6.20
35Plastic pavement marking (straight arrow) (716-04.05)EACH2$180.00$189.40
36Plastic pavement marking (exit only arrow) (716-04.07)EACH6$235.00$250.00
37Painted pavement markings(8" line) (716-05.49)LM30$1,500.00$1,541.85
38Hydroblast removal of pavement marking (line) (716-08.30)LM1$7,500.00$8,115.00
39Hydroblast removal of pavement marking (words and symbols) (716-08.33)EACH4$550.00$541.00
40Contrast pavement marking 6" (716-09.86)LM1$47,500$51,395
41Contrast pavement markings words and symbols (716-09.87)EACH4$1,500.00$1,623.00
42Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM20$6,100.00$6,492.00
43Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03)LF6,575$2.80$3.00
44Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF2,350$2.50$2.70
45Enhanced flat line thermo (12IN barrier line) (716-12.08)LF2,310$5.20$5.40
46Enhanced flat line thermo (12IN dotted) (716-12.10)LF5,105$5.20$5.40
47Mobilization (717-01)LS1$195,000$405,950
48Asphalt concrete mix (PG76-22) grading CM (307-03.12)TON181$295.00$315.80
49Concrete slab repairs (604-10.11)SY60$635.00$1,623.00
50Expansion joint repairs (604-10.44)LF124$400.00$459.80
51Bridge deck repairs (partial depth of slab) (604-10.50)SY170$350.00$595.00
52Concrete repairs (604-10.53)SY30$350.00$703.30
53Concrete overlayed bridge deck repair (partial depth) (604-10.56)SY10$400.00$703.30
54Bridge deck sealant (617-01)SY1,639$48.00$64.90
55Trackless tack coat (403-02.01)TON193$1,150.00$1,253.00
TDOT contract CNZ126: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy