TDOT contract CN262011 bid tabulation

The resurfacing on s.r. 314 from u.s. 64 (u.s. 74, s.r. 40) (l.m. 0.00) to u.s. 411 (s.r. 33) (l.m. 6.08). Let by Tennessee DOT on February 6, 2026, Polk County. 2 bids received; low bid $999,555 by Wright Brothers Construction Company, Inc..

Owner
Tennessee DOT
Letting
06 FEB 2026
Pay items
19
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Wright Brothers Construction Company, Inc.$999,555Low
2APAC-Atlantic, Inc.$1,138,716+14%
TDOT contract CN262011: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Wright Brothers Construction Company, Inc.2. APAC-Atlantic, Inc.
1Brooming & degrassing shoulders (208-01.05)LM12.20$200.00$902.90
2Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON46$161.00$263.54
3Trackless tack coat (403-02.01)TON51$870.00$820.38
4Acs mix(PG64-22) thin lift D asphalt (411-03.12)TON4,779$138.00$155.06
5Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM9.30$725.00$759.00
6Cold planing bituminous pavement (415-01.01)TON70$62.50$205.58
7Guardrail delineation enhancement (BI-directional) (705-04.22)EACH663$5.00$5.35
8Traffic control (712-01)LS1$21,000$33,000
9Flexible drums (channelizing) (712-04.01)EACH427$1.00$1.15
10Signs (construction) (712-06)SF541$6.50$6.84
11Changeable message sign unit (713-16.01)EACH2$3,250.00$3,450.00
12Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH402$43.00$46.00
13Removal of snowplowable reflective marker (716-01.30)EACH402$9.50$10.06
14Plastic pavement marking (stop line) (716-02.05)LF206$13.00$13.80
15Plastic pavement marking (turn lane arrow) (716-02.06)EACH2$215.00$230.00
16Plastic pavement marking (8IN line) (716-02.12)LM0.01$13,600$14,375
17Painted pavement marking (4" line) (716-05.01)LM12.20$1,600.00$1,725.00
18Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM21.90$7,850.00$8,337.50
19Mobilization (717-01)LS1$24,177$34,000
TDOT contract CN262011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy