TDOT contract CN264006 bid tabulation
The resurfacing on s.r. 103 from near s.r. 181 (l.m. 1.55) to s.r. 78 (l.m. 8.37), including thin epoxy overlay on bridges. Let by Tennessee DOT on February 6, 2026, Dyer County. 1 bid received; low bid $1,216,728 by Pavement Restorations, Inc..
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 29
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pavement Restorations, Inc. | $1,216,728 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pavement Restorations, Inc. |
|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 13.70 | $1,300.00 |
| 2 | Mineral aggregate, type B base, grading (C or D) (303-02) | TON | 1,782 | $65.00 |
| 3 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading C-W (307-01.10) | TON | 55 | $515.00 |
| 4 | High performance fog seals (403-01.10) | SY | 86,890 | $0.85 |
| 5 | Bituminous material (BSC) (405-01.01) | TON | 232 | $1,125.00 |
| 6 | Mineral aggregate (BSC) (405-01.02) | TON | 2,173 | $64.00 |
| 7 | Cold planing bituminous pavement (415-01.01) | TON | 219 | $175.00 |
| 8 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 24 | $130.00 |
| 9 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 24 | $3,675.00 |
| 10 | Guardrail removed (706-01) | LF | 1,200 | $5.00 |
| 11 | Traffic control (712-01) | LS | 1 | $67,000 |
| 12 | Flexible drums (channelizing) (712-04.01) | EACH | 56 | $40.00 |
| 13 | Warning lights (type A) (712-05.01) | EACH | 46 | $15.00 |
| 14 | Warning lights (type C) (712-05.03) | EACH | 10 | $15.00 |
| 15 | Signs (construction) (712-06) | SF | 1,592 | $7.00 |
| 16 | Sign post delineation enhancement (713-02.21) | LF | 18 | $10.00 |
| 17 | Removal of signs, posts and footings (713-15) | LS | 1 | $150.00 |
| 18 | Railroad advance warning sign and support (713-16.09) | EACH | 2 | $350.00 |
| 19 | Signs (stop sign) (713-16.20) | EACH | 1 | $350.00 |
| 20 | Plastic pavement marking (stop line) (716-02.05) | LF | 156 | $35.00 |
| 21 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 2 | $1,350.00 |
| 22 | Painted pavement marking (stop line) (716-05.05) | LF | 69 | $20.00 |
| 23 | Painted pavement marking (6" line) (716-05.20) | LM | 18.95 | $2,350.00 |
| 24 | Removal of pavement marking (stop line) (716-08.05) | LF | 156 | $20.00 |
| 25 | Removal of word pavement marking (RXR) (716-08.11) | EACH | 2 | $1,350.00 |
| 26 | Removal of pavement marking (line) (716-08.20) | LM | 18.95 | $1,650.00 |
| 27 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 18.95 | $8,500.00 |
| 28 | Mobilization (717-01) | LS | 1 | $61,000 |
| 29 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 1,050 | $47.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.