TDOT contract CN263009 bid tabulation
The interchange lighting along i-40 at golden bear gateway/beckwith road (exit 229). Let by Tennessee DOT on February 6, 2026, Wilson County. 4 bids received; low bid $1,512,176 by S & W Contracting Company, LLC.
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 33
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | S & W Contracting Company, LLC | $1,512,176 | Low |
| 2 | Stansell Electric Company, Inc. | $1,585,153 | +5.0% |
| 3 | Davis H. Elliot Construction Company, Inc. | $1,617,321 | +7.0% |
| 4 | Shelby Electric Company, Inc. | $2,074,416 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. S & W Contracting Company, LLC | 2. Stansell Electric Company, Inc. | 3. Davis H. Elliot Construction Company, Inc. | 4. Shelby Electric Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $11,940 | $19,740 | $25,000 | $23,000 |
| 2 | Road & drainage excavation (unclassified) (203-01) | CY | 22 | $180.00 | $200.00 | $80.00 | $63.25 |
| 3 | Temporary silt fence (with backing) (209-08.02) | LF | 18,000 | $5.80 | $4.00 | $5.20 | $6.33 |
| 4 | 15" temporary drainage pipe (621-03.01) | LF | 200 | $120.00 | $32.00 | $50.00 | $69.00 |
| 5 | High-visibility construction fence (707-08.11) | LF | 7,200 | $2.42 | $3.00 | $2.20 | $3.45 |
| 6 | Machined rip-rap (class A-3) (709-05.05) | TON | 65 | $80.00 | $140.00 | $100.00 | $92.00 |
| 7 | Traffic control (712-01) | LS | 1 | $26,240 | $43,850 | $50,000 | $48,000 |
| 8 | Signs (construction) (712-06) | SF | 928 | $9.00 | $9.00 | $7.30 | $8.76 |
| 9 | Arrow board (type C) (712-08.03) | EACH | 2 | $2,500.00 | $1,520.00 | $1,200.00 | $1,500.00 |
| 10 | Jacked or bored conduit (714-03) | LF | 1,486 | $60.00 | $29.00 | $14.48 | $42.18 |
| 11 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 15,418 | $14.00 | $9.50 | $9.26 | $15.84 |
| 12 | Conduit (structures - 2" RGS) (714-04.02) | LF | 403 | $28.00 | $35.00 | $33.42 | $50.00 |
| 13 | Pull boxes (type C) (714-05.04) | EACH | 48 | $1,000.00 | $1,480.00 | $3,000.00 | $1,200.00 |
| 14 | Cable (1/C # 8 AWG) (714-06.04) | LF | 22,239 | $1.80 | $1.70 | $1.32 | $2.03 |
| 15 | Cable (1/C # 6 AWG) (714-06.05) | LF | 37,363 | $1.90 | $2.20 | $1.71 | $2.51 |
| 16 | Cable (1/C # 4 AWG) (714-06.06) | LF | 5,000 | $2.90 | $3.00 | $2.38 | $3.68 |
| 17 | Light standards (45' M.H.) (714-08.09) | EACH | 36 | $6,595.00 | $4,540.00 | $6,000.00 | $7,723.58 |
| 18 | Light standards (high mast - 120' M.H.) (714-08.10) | EACH | 6 | $38,932 | $52,775 | $67,000 | $59,405 |
| 19 | Foundation for light standards - high mast (120' M.H.) (714-08.27) | EACH | 6 | $20,000 | $19,865 | $10,000 | $29,857 |
| 20 | Foundation for light standards - roadway (45-50' standard) (714-08.28) | EACH | 36 | $1,800.00 | $2,685.00 | $2,000.00 | $4,462.70 |
| 21 | LED luminaires (155 watt LED for offset poles) (714-09.47) | EACH | 36 | $1,185.00 | $1,145.00 | $1,500.00 | $1,127.09 |
| 22 | LED luminaires-high mast (8 luminaires @45 degrees, 295W) (714-09.64) | EACH | 5 | $1,694.00 | $11,480 | $2,500.00 | $13,279 |
| 23 | LED luminaires-high mast (6 luminaires @60 degrees, 295W) (714-09.65) | EACH | 1 | $1,694.00 | $8,715.00 | $2,500.00 | $10,032 |
| 24 | LED luminaires-underpass (72 watt) (714-09.83) | EACH | 4 | $1,694.00 | $1,090.00 | $5,500.00 | $990.00 |
| 25 | Control center (no. 1) (714-12.01) | LS | 1 | $12,640 | $13,230 | $20,000 | $16,100 |
| 26 | Control center (no. 2) (714-12.02) | LS | 1 | $12,640 | $13,945 | $20,000 | $16,100 |
| 27 | Electrical connection (control center no. 1) (714-25.01) | LS | 1 | $5,200.00 | $5,760.00 | $3,500.00 | $2,875.00 |
| 28 | Electrical connection (control center no. 2) (714-25.02) | LS | 1 | $5,200.00 | $7,285.00 | $3,500.00 | $2,875.00 |
| 29 | Mobilization (717-01) | LS | 1 | $51,640 | $129,275 | $80,796 | $144,727 |
| 30 | Geotextile (type III)(erosion control) (740-10.03) | SY | 344 | $9.60 | $4.00 | $5.00 | $8.63 |
| 31 | Temporary seeding (with mulch) (801-01.07) | UNIT | 9 | $160.00 | $150.00 | $42.00 | $74.75 |
| 32 | Water (seeding & sodding) (801-03) | MG | 1 | $120.00 | $100.00 | $150.00 | $172.50 |
| 33 | Sodding (new sod) (803-01) | SY | 1,000 | $8.25 | $7.00 | $7.50 | $8.63 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.