TDOT contract CN262014 bid tabulation
The resurfacing (microsurface or thin mix overlay) on u.s. 70s (s.r. 1) from the van buren county line (l.m. 0.00) to s.r. 111 (l.m. 7.70), including concrete repair on the bridges at l.m. 7.03. Let by Tennessee DOT on February 6, 2026, White County. 3 bids received; low bid $1,772,621 by Asphalt Paving Systems, Inc..
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 27
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Asphalt Paving Systems, Inc. | $1,772,621 | Low |
| 2 | Rogers Group, Inc. | $1,904,855 | +7.0% |
| 3 | Strawser Construction Inc. | $2,510,614 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Asphalt Paving Systems, Inc. | 2. Rogers Group, Inc. | 3. Strawser Construction Inc. |
|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 15 | $1,000.00 | $1,488.00 | $1,200.00 |
| 2 | High performance fog seals (403-01.10) | SY | 128,994 | $0.32 | $1.00 | $0.75 |
| 3 | Cold planing bituminous pavement (415-01.01) | TON | 136 | $102.90 | $195.00 | $244.70 |
| 4 | Guardrail delineation enhancement (BI-directional) (705-04.22) | EACH | 5,871 | $4.20 | $4.25 | $4.50 |
| 5 | Traffic control (712-01) | LS | 1 | $26,000 | $68,000 | $142,130 |
| 6 | Flexible drums (channelizing) (712-04.01) | EACH | 46 | $31.50 | $31.60 | $30.00 |
| 7 | Signs (construction) (712-06) | SF | 652 | $7.35 | $7.40 | $7.50 |
| 8 | Arrow board (type C) (712-08.03) | EACH | 2 | $892.50 | $897.25 | $950.00 |
| 9 | Changeable message sign unit (713-16.01) | EACH | 3 | $5,250.00 | $5,278.00 | $5,500.00 |
| 10 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 131 | $39.90 | $40.00 | $42.00 |
| 11 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 974 | $39.90 | $40.50 | $42.00 |
| 12 | Removal of snowplowable reflective marker (716-01.30) | EACH | 1,105 | $10.50 | $52.00 | $15.00 |
| 13 | Plastic pavement marking (stop line) (716-02.05) | LF | 759 | $10.50 | $10.50 | $12.00 |
| 14 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 23 | $183.75 | $184.75 | $175.00 |
| 15 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.50 | $11,025 | $11,084 | $9,500.00 |
| 16 | Painted pavement marking (4" line) (716-05.01) | LM | 34.20 | $997.50 | $1,003.00 | $1,000.00 |
| 17 | Removal of pavement marking (stop line) (716-08.05) | LF | 319 | $5.25 | $5.25 | $2.75 |
| 18 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 32 | $89.25 | $89.75 | $70.00 |
| 19 | Removal of pavement marking (line) (716-08.20) | LM | 35 | $2,940.00 | $2,955.50 | $3,400.00 |
| 20 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 34.20 | $6,825.00 | $6,862.00 | $7,200.00 |
| 21 | Mobilization (717-01) | LS | 1 | $20,000 | $16,000 | $142,130 |
| 22 | Concrete repairs (604-10.53) | SY | 26 | $1,113.00 | $738.00 | $1,950.00 |
| 23 | Trackless tack coat (403-02.01) | TON | 68 | $950.00 | ||
| 24 | Acs mix(PG64-22) thin lift asphalt (411-03.07) | TON | 8,813 | $115.00 | ||
| 25 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 30 | $600.00 | $950.00 | |
| 26 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 418 | $1,783.36 | $1,050.00 | |
| 27 | Aggregate for micro surfacing (414-03.02) | TON | 3,477 | $105.60 | $295.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.