TDOT contract CN261011 bid tabulation
The new construction on the s.r. 449 extension (veteran's boulevard) from u.s. 411 (s.r. 35) to near robert henderson road, and miscellaneous improvements on u.s. 411 (s.r. 35) from s.r. 448 to eastgate road. Let by Tennessee DOT on February 6, 2026, Sevier County. 1 bid received; low bid $25,993,101 by Charles Blalock & Sons, Inc..
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 378
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Charles Blalock & Sons, Inc. | $25,993,101 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Charles Blalock & Sons, Inc. |
|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $175,000 |
| 2 | Trainee (109-10.01) | HR | 4,420 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $850,000 |
| 4 | Removal of structures and obstructions (202-01) | LS | 1 | $10,098 |
| 5 | Removal of structures & obstructions (3,075 SF of concrete paving) (202-01.56) | LS | 1 | $11,180 |
| 6 | Removal of buildings (tract no. 9) (202-06.01) | LS | 1 | $4,077.21 |
| 7 | Removal of buildings (tract no. 10) (202-06.02) | LS | 1 | $3,593.46 |
| 8 | Road & drainage excavation (unclassified) (203-01) | CY | 14,063 | $15.00 |
| 9 | Road & drainage excavation (stream mitigation) (203-01.13) | CY | 2,142 | $34.54 |
| 10 | Borrow excavation (graded solid rock) (203-02.01) | TON | 1,400 | $65.00 |
| 11 | Borrow excavation (unclassified) (203-03) | CY | 92,939 | $12.00 |
| 12 | Placing and spreading topsoil (203-04) | CY | 7,665 | $3.00 |
| 13 | Water (203-06) | MG | 318 | $3.00 |
| 14 | Furnishing & spreading topsoil (203-07) | CY | 228 | $78.36 |
| 15 | Channel substrate (203-20.01) | CY | 114 | $175.00 |
| 16 | Foundation fill material (204-08) | CY | 95 | $98.44 |
| 17 | Backfill material (flowable fill) (204-08.01) | CY | 128 | $462.17 |
| 18 | 12" temporary slope drain (209-02.05) | LF | 307 | $15.05 |
| 19 | Filter sock (12 inch) (209-03.21) | LF | 172 | $5.78 |
| 20 | Stream mitigation-log vanes (209-03.34) | LF | 40 | $475.00 |
| 21 | Stream mitigation cross vane structure (209-03.37) | EACH | 2 | $8,200.00 |
| 22 | Stream mitigation -J -hook (209-03.38) | EACH | 8 | $6,100.00 |
| 23 | Stream mitigation - rock vane (209-03.60) | EACH | 4 | $4,631.32 |
| 24 | Stream mitigation - root wad (209-03.62) | EACH | 4 | $4,000.00 |
| 25 | Protected area marker (white with decal) (209-03.99) | EACH | 12 | $265.15 |
| 26 | Sediment removal (209-05) | CY | 946 | $23.93 |
| 27 | Temporary silt fence (with backing) (209-08.02) | LF | 7,617 | $5.25 |
| 28 | Temporary silt fence (without backing) (209-08.03) | LF | 426 | $4.20 |
| 29 | Rock check dam (209-08.07) | EACH | 8 | $602.76 |
| 30 | Enhanced rock check dam (209-08.08) | EACH | 24 | $1,005.13 |
| 31 | Filter sock check dam (209-08.09) | EACH | 8 | $682.50 |
| 32 | Sandbags (209-09.01) | BAG | 100 | $10.50 |
| 33 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 2 | $2,562.81 |
| 34 | Curb inlet protection (type 4) (209-09.43) | EACH | 112 | $312.90 |
| 35 | Temporary dewatering structure (209-10.01) | CY | 298 | $38.97 |
| 36 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 71 | $24.27 |
| 37 | Catch basin protection (type D) (209-40.33) | EACH | 70 | $393.75 |
| 38 | Catch basin filter assembly(type 2) (209-40.42) | EACH | 21 | $813.75 |
| 39 | Catch basin filter assembly(type 3) (209-40.43) | EACH | 13 | $813.75 |
| 40 | Catch basin filter assembly(type 4) (209-40.44) | EACH | 7 | $934.50 |
| 41 | Catch basin filter assembly(type 5) (209-40.45) | EACH | 7 | $1,575.00 |
| 42 | Catch basin filter assembly(type 7) (209-40.47) | EACH | 1 | $1,050.00 |
| 43 | Temporary stream diversion (with pump around) (209-65.01) | LS | 1 | $30,116 |
| 44 | Temporary in stream diversion (209-65.04) | LF | 147 | $483.46 |
| 45 | Mineral aggregate, type A base, grading D (303-01) | TON | 21,312 | $58.34 |
| 46 | Granular backfill (roadway) (303-01.01) | TON | 855 | $42.66 |
| 47 | Mineral aggregate (size 57) (303-10.01) | TON | 223 | $53.28 |
| 48 | Mineral aggregate (see standard drawing STD-10-2) (303-10.04) | TON | 1,782 | $53.28 |
| 49 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 2,761 | $180.66 |
| 50 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 3,407 | $219.24 |
| 51 | Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21) | TON | 2,807 | $191.56 |
| 52 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 1,406 | $203.96 |
| 53 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 596 | $208.21 |
| 54 | Bituminous material for prime coat (PC) (402-01) | TON | 36 | $2,469.71 |
| 55 | Aggregate for cover material (PC) (402-02) | TON | 143 | $50.00 |
| 56 | Bituminous material for tack coat (TC) (403-01) | TON | 156 | $1,500.00 |
| 57 | Saw cutting asphalt pavement (407-20.05) | LF | 4,935 | $3.68 |
| 58 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 179 | $249.53 |
| 59 | Acs mix(PG64-22) grading D (411-01.10) | TON | 2,143 | $257.09 |
| 60 | Acs mix(PG70-22) grading D (411-02.10) | TON | 1,585 | $263.09 |
| 61 | Cold planing bituminous pavement (415-01.01) | TON | 1,224 | $39.00 |
| 62 | Cold planing bituminous pavement (415-01.02) | SY | 9,772 | $7.95 |
| 63 | Class A concrete (roadway) (604-01.01) | CY | 259 | $1,509.17 |
| 64 | Steel bar reinforcement (roadway) (604-01.02) | LB | 49,766 | $1.42 |
| 65 | Applied texture finish (new structures) (604-04.01) | SY | 4,123 | $16.07 |
| 66 | Retaining wall (retaining wall no. 1) (604-07.01) | SF | 6,765 | $200.00 |
| 67 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 2,854 | $125.42 |
| 68 | 18" concrete pipe culvert (class IV) (607-03.03) | LF | 42 | $140.76 |
| 69 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 512 | $166.88 |
| 70 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 29 | $232.21 |
| 71 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 740 | $250.86 |
| 72 | 36" concrete pipe culvert (class IV) (607-07.03) | LF | 22 | $335.72 |
| 73 | 42" concrete pipe culvert (class III) (607-08.02) | LF | 182 | $360.83 |
| 74 | 18" corrugated metal pipe culvert (607-37.02) | LF | 23 | $181.95 |
| 75 | 18" pipe culvert (side drain) (607-39.02) | LF | 279 | $111.09 |
| 76 | 18" slotted drain pipe (607-45.02) | LF | 30 | $445.52 |
| 77 | Manholes, > 4' - 8' depth (611-01.02) | EACH | 4 | $7,685.17 |
| 78 | Manholes, > 8' - 12' depth (611-01.03) | EACH | 1 | $8,271.21 |
| 79 | Manholes, > 16' - 20' depth (611-01.05) | EACH | 1 | $15,245 |
| 80 | Class A concrete (pipe endwalls) (611-07.01) | CY | 11.22 | $2,504.92 |
| 81 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 714 | $4.51 |
| 82 | 18IN endwall (side drain) (611-07.31) | EACH | 7 | $3,332.81 |
| 83 | Rework catchbasin (611-09.02) | EACH | 30 | $1,799.55 |
| 84 | Capping existing catchbasin (611-09.03) | EACH | 21 | $2,875.87 |
| 85 | Catch basins, type 12, 0' - 4' depth (611-12.01) | EACH | 14 | $4,461.65 |
| 86 | Catch basins, type 12, > 4' - 8' depth (611-12.02) | EACH | 20 | $5,351.67 |
| 87 | Catch basins, type 12, > 8' - 12' depth (611-12.03) | EACH | 7 | $11,554 |
| 88 | Catch basins, type 12, > 12' - 16' depth (611-12.04) | EACH | 8 | $14,119 |
| 89 | Catch basins, type 12, > 20' - 24' depth (611-12.06) | EACH | 2 | $16,287 |
| 90 | Catch basins, type 12, > 24' - 28' depth (611-12.07) | EACH | 1 | $16,663 |
| 91 | Catch basins, type 14, > 4' - 8' depth (611-14.02) | EACH | 4 | $14,017 |
| 92 | Catch basins, type 14, > 12' - 16' depth (611-14.04) | EACH | 1 | $22,812 |
| 93 | Catch basins, type 25, 0' - 4' depth (611-25.01) | EACH | 1 | $5,960.82 |
| 94 | Catch basins, type 25, > 4' - 8' depth (611-25.02) | EACH | 3 | $6,802.26 |
| 95 | Catch basins, type 25, > 12' - 16' depth (611-25.04) | EACH | 1 | $12,644 |
| 96 | Catch basins, type 26, > 4' - 8' depth (611-26.02) | EACH | 1 | $13,433 |
| 97 | Catch basins, type 40, > 4' - 8' depth (611-40.02) | EACH | 1 | $13,755 |
| 98 | Catch basins, type 42, 0' - 4' depth (611-42.01) | EACH | 4 | $7,082.77 |
| 99 | Catch basins, type 42, > 4' - 8' depth (611-42.02) | EACH | 3 | $12,068 |
| 100 | Catch basins, type 42, > 8' - 12' depth (611-42.03) | EACH | 1 | $10,516 |
| 101 | Catch basins, type 43, > 4' - 8' depth (611-43.02) | EACH | 1 | $19,984 |
| 102 | Junction structure, 72IN round,> (9.98 FT depth) (611-63.21) | EACH | 1 | $10,227 |
| 103 | Concrete parapet with structural tubing (620-05) | LF | 1,124 | $292.31 |
| 104 | Concrete sidewalk (4 ") (701-01.01) | SF | 28,854 | $13.50 |
| 105 | Concrete driveway (701-02) | SF | 8,112 | $12.82 |
| 106 | Concrete curb ramp (701-02.03) | SF | 3,656 | $22.89 |
| 107 | Concrete median pavement (701-03) | CY | 73 | $603.79 |
| 108 | Concrete curb (702-01) | CY | 224 | $538.45 |
| 109 | Concrete combined curb & gutter (702-03) | CY | 640 | $626.53 |
| 110 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $1,706.25 |
| 111 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 1 | $1,653.75 |
| 112 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 3 | $3,438.75 |
| 113 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 3 | $3,622.50 |
| 114 | Thrie beam 38IN vehicle & pedestrian safety rail MASH TL-3 (705-06.27) | LF | 1,066 | $55.13 |
| 115 | Portable impact attenuator NCHRP350 TL-2 (705-08.10) | EACH | 4 | $6,562.50 |
| 116 | Michigan and modified michigan end shoe (706-10.80) | EACH | 1 | $131.25 |
| 117 | High-visibility construction fence (707-08.11) | LF | 3,071 | $2.63 |
| 118 | Bike/pedestrian box tube safety rail (707-16.01) | LF | 260 | $152.25 |
| 119 | Machined rip-rap (class A-3) (709-05.05) | TON | 100 | $61.00 |
| 120 | Machined rip-rap (class A-1) (709-05.06) | TON | 437 | $61.00 |
| 121 | Machined rip-rap (class B) (709-05.08) | TON | 2,372 | $63.37 |
| 122 | Rock riffles (709-05.81) | LS | 1 | $94,156 |
| 123 | Aggregate underdrains (with pipe) (710-02) | LF | 11,302 | $13.13 |
| 124 | Traffic control (712-01) | LS | 1 | $336,520 |
| 125 | Interconnected portable barrier rail (712-02.02) | LF | 458 | $30.60 |
| 126 | Flexible drums (channelizing) (712-04.01) | EACH | 1,303 | $42.42 |
| 127 | Warning lights (type A) (712-05.01) | EACH | 48 | $26.52 |
| 128 | Warning lights (type C) (712-05.03) | EACH | 8 | $26.52 |
| 129 | Signs (construction) (712-06) | SF | 831 | $7.42 |
| 130 | Temporary barricades (type III) (712-07.03) | LF | 751 | $2.12 |
| 131 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,909.09 |
| 132 | Mobile message sign unit W/attenuator (712-08.10) | HR | 2 | $127.27 |
| 133 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 2 | $715.91 |
| 134 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 501 | $3.53 |
| 135 | Concrete barrier/parapet delineator (713-02.26) | EACH | 12 | $12.73 |
| 136 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 884 | $9.55 |
| 137 | "U" section steel posts (713-11.01) | LB | 75 | $5.14 |
| 138 | Perforated/knockout square tube post (713-11.02) | LB | 391 | $5.25 |
| 139 | P post slip base (713-11.21) | EACH | 11 | $530.30 |
| 140 | U post slip base (713-11.22) | EACH | 2 | $546.21 |
| 141 | Square post slip base (713-11.24) | EACH | 10 | $530.30 |
| 142 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 38 | $14.85 |
| 143 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 137 | $16.44 |
| 144 | Street name sign (rigid 0.100IN thick (713-14.21) | SF | 60 | $68.25 |
| 145 | Changeable message sign unit (713-16.01) | EACH | 2 | $9,333.34 |
| 146 | Dead end sign and support (713-16.06) | EACH | 3 | $265.15 |
| 147 | End of roadway sign and support (713-16.07) | EACH | 4 | $265.15 |
| 148 | Signs (protected area sign) (713-16.20) | EACH | 12 | $265.15 |
| 149 | Signs (removal of left tutrn yield on flashing arrow on mast arm) (713-16.21) | EACH | 1 | $262.50 |
| 150 | Signs (new street backlit box signage on mast arm middlecreek at SR 35) (713-16.22) | EACH | 2 | $4,725.00 |
| 151 | Signs (adjust and relocate street backlit box signage on mast arm vet at SR 35) (713-16.23) | EACH | 1 | $1,050.00 |
| 152 | Remove and replace sign (overhead mounted to mast arm) (713-16.50) | EACH | 1 | $525.00 |
| 153 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 95 | $42.00 |
| 154 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 300 | $42.00 |
| 155 | Plastic pavement marking (cross-walk) (716-02.03) | LF | 111 | $9.19 |
| 156 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 175 | $26.25 |
| 157 | Plastic pavement marking (stop line) (716-02.05) | LF | 579 | $10.50 |
| 158 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 49 | $131.25 |
| 159 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 2,315 | $1.31 |
| 160 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 138 | $29.40 |
| 161 | Plastic pavement marking (8IN line) (716-02.12) | LM | 1 | $8,662.50 |
| 162 | Plastic word pavement marking (only) (716-03.01) | EACH | 3 | $236.25 |
| 163 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 3 | $183.75 |
| 164 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 7 | $157.50 |
| 165 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 1 | $236.25 |
| 166 | Painted pavement marking (4" line) (716-05.01) | LM | 3.80 | $1,312.50 |
| 167 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 7,540 | $0.32 |
| 168 | Painted pavement marking (cross-walk) (716-05.03) | LF | 222 | $5.25 |
| 169 | Painted pavement marking (channelization striping) (716-05.04) | SY | 290 | $10.50 |
| 170 | Painted pavement marking (stop line) (716-05.05) | LF | 927 | $5.25 |
| 171 | Painted pavement marking (turn lane arrow) (716-05.06) | EACH | 120 | $52.50 |
| 172 | Painted pavement marking(straight-turn arrow) (716-05.09) | EACH | 6 | $78.75 |
| 173 | Painted pavement marking(straight arrow) (716-05.11) | EACH | 8 | $52.50 |
| 174 | Painted pavement marking (6" line) (716-05.20) | LM | 6.20 | $1,312.50 |
| 175 | Painted pavement markings(8" line) (716-05.49) | LM | 1.80 | $1,575.00 |
| 176 | Enhanced flatline thermo PVMT MRKNG (4IN line) (716-12.01) | LM | 0.90 | $6,037.50 |
| 177 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 3 | $6,825.00 |
| 178 | Mobilization (717-01) | LS | 1 | $975,000 |
| 179 | Field office (type 2) (722-01.02) | LS | 1 | $6,450.00 |
| 180 | Pull box (type D) (725-20.44) | EACH | 4 | $5,250.00 |
| 181 | 2IN conduit (725-22.71) | LF | 250 | $13.20 |
| 182 | 2IN conduit bored (725-22.72) | LF | 1,020 | $11.06 |
| 183 | 4IN conduit (725-22.83) | LF | 2,200 | $18.89 |
| 184 | Remove & relocate existing traffic signal equipment (730-01.01) | EACH | 2 | $525.00 |
| 185 | Removal of signal equipment (730-01.02) | EACH | 1 | $13,125 |
| 186 | Modification of existing traffic signal equipment (730-01.03) | EACH | 1 | $5,250.00 |
| 187 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 6 | $1,470.00 |
| 188 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 21 | $1,365.00 |
| 189 | Signal head assembly (130 A2) (730-02.10) | EACH | 1 | $1,470.00 |
| 190 | Signal head assembly (140 A1 with backplate) (730-02.14) | EACH | 1 | $1,680.00 |
| 191 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 2 | $2,100.00 |
| 192 | Signal head modification (relocation) (730-02.41) | EACH | 1 | $525.00 |
| 193 | Signal head modification (change black backplate to yellow) (730-02.42) | EACH | 10 | $525.00 |
| 194 | Signal head assembly (140 A4F with backplate) (730-02.59) | EACH | 4 | $1,680.00 |
| 195 | Install pull box (type B) (730-03.21) | EACH | 9 | $2,625.00 |
| 196 | Electrical service connection (730-05.01) | EACH | 2 | $3,675.00 |
| 197 | Signal cable - 5 conductor (730-08.02) | LF | 3,523 | $3.12 |
| 198 | Signal cable - 7 conductor (730-08.03) | LF | 2,734 | $3.62 |
| 199 | Signal cable - 9 conductor (730-08.04) | LF | 1,355 | $4.34 |
| 200 | Signal cable - 12 conductor (730-08.05) | LF | 945 | $5.17 |
| 201 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 261 | $13.42 |
| 202 | Conduit 2" diameter (directional bore) (730-12.23) | LF | 3,022 | $5.90 |
| 203 | Vehicle detector (radar - advance) (730-13.13) | EACH | 3 | $6,825.00 |
| 204 | Vehicle detector (360-degree camera) (730-13.14) | EACH | 3 | $26,250 |
| 205 | Cabinet (atc) (730-15.07) | EACH | 2 | $42,000 |
| 206 | Controller (atc) (730-16.04) | EACH | 2 | $9,712.50 |
| 207 | Pedestal pole (type A) (730-23.28) | EACH | 1 | $5,250.00 |
| 208 | Pedestal pole (type B) (730-23.29) | EACH | 2 | $6,825.00 |
| 209 | Pedestal pole (10FT pedestrian type A) (730-23.30) | EACH | 4 | $5,250.00 |
| 210 | Pedestal pole (relocate existing pushbuttons, ped heads & signs new foundations) (730-23.31) | EACH | 3 | $4,725.00 |
| 211 | Cantilever signal support (1 arm @ 45') (730-23.88) | EACH | 1 | $42,382 |
| 212 | Cantilever signal support (1 arm @ 60') (730-25.11) | EACH | 1 | $50,782 |
| 213 | Cantilever signal support (1 arm @ 65') (730-25.13) | EACH | 1 | $50,782 |
| 214 | Cantilever signal support (1 arm @ 70') (730-25.14) | EACH | 1 | $56,557 |
| 215 | Cantilever signal support (1 arm @ 75') (730-25.15) | EACH | 1 | $61,282 |
| 216 | Cantilever signal support (1 arm @ 80') (730-25.16) | EACH | 2 | $60,232 |
| 217 | Cantilever signal support (1 arm @ 85') (730-25.17) | EACH | 1 | $63,382 |
| 218 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 10 | $2,625.00 |
| 219 | Battery back-UP system (730-35.06) | EACH | 2 | $10,500 |
| 220 | Geogrid reinforcement type 2 (740-07.04) | SY | 4,227 | $9.25 |
| 221 | Geotextile (type III)(erosion control) (740-10.03) | SY | 2,306 | $2.70 |
| 222 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 1,520 | $3.86 |
| 223 | Temporary sediment tube 8IN (740-11.01) | LF | 10,167 | $3.41 |
| 224 | Seeding (with mulch) (801-01) | UNIT | 191 | $47.93 |
| 225 | Temporary seeding (with mulch) (801-01.07) | UNIT | 124 | $38.01 |
| 226 | Grass seed mix (ripzn/FLPL) (801-01.34) | UNIT | 51 | $68.99 |
| 227 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 7 | $84.00 |
| 228 | Seeding (without mulch) (801-02) | UNIT | 31 | $39.90 |
| 229 | Water (seeding & sodding) (801-03) | MG | 97 | $131.25 |
| 230 | Seed (supplemental application) (801-07) | LB | 7 | $26.25 |
| 231 | Fertilizer (supplemental application) (801-08) | TON | 1 | $2,100.00 |
| 232 | Cuttings: salix sericea (18IN-24IN) (802-02.31) | EACH | 75 | $4.46 |
| 233 | Cuttings: sambucus canadensis (18IN-24IN) (802-02.33) | EACH | 75 | $7.26 |
| 234 | Cuttings: cephalanthus occidentalis (18IN-24IN) (802-02.35) | EACH | 75 | $5.64 |
| 235 | Cuttings: cornus amomum (24-48IN) (802-02.42) | EACH | 75 | $5.57 |
| 236 | Acer rubrum (red maple seedlng B.R.) (802-12.02) | EACH | 62 | $10.50 |
| 237 | Carya ovata (shagbark hickory seedlng B.R.) (802-12.09) | EACH | 63 | $10.50 |
| 238 | Cornus florida (flowering dogwood seedlng B.R.) (802-12.12) | EACH | 62 | $10.50 |
| 239 | Diospyros virginiana (persimmon seedlng B.R.) (802-12.14) | EACH | 63 | $10.50 |
| 240 | Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19) | EACH | 62 | $10.50 |
| 241 | Quercus falcata (southern red oak seedlng B.R.) (802-12.31) | EACH | 62 | $10.50 |
| 242 | Quercus phellos (willow oak seedlng B.R.) (802-12.38) | EACH | 62 | $10.50 |
| 243 | Hamamelis virginiana (american witchhazel seedling B.R.) (802-12.63) | EACH | 57 | $10.50 |
| 244 | Calycanthus floridus (sweetshrub SDLNG bare root) (802-13.52) | EACH | 58 | $10.50 |
| 245 | Lindera benzoin (spicebush SDLNG bare root) (802-13.59) | EACH | 58 | $10.50 |
| 246 | Aronia melanocarpa (BLCK chokeberry SDLNG B.R.) (802-13.61) | EACH | 58 | $10.50 |
| 247 | Ilex verticillata (CMMN winterberry SDLNG B.R.) (802-13.62) | EACH | 58 | $10.50 |
| 248 | Amorpha fruticosa (indigobush sdling B.R.) (802-13.65) | EACH | 57 | $10.50 |
| 249 | Sodding (new sod) (803-01) | SY | 8,469 | $6.83 |
| 250 | Turf reinforcement mat (class I) (805-01.01) | SY | 708 | $4.73 |
| 251 | Erosion control blanket (type I) (805-12.01) | SY | 7,006 | $1.89 |
| 252 | 700 gram coir fiber erosion blanket (805-12.08) | SY | 337 | $4.20 |
| 253 | Project mowing (806-02.03) | CYCL | 9 | $2,393.45 |
| 254 | Removal of structures (bridge location no. 78-nfa 2488-00.21) (202-04.01) | LS | 1 | $169,697 |
| 255 | Dry excavation (bridges) (204-02.01) | CY | 172 | $126.54 |
| 256 | Wet excavation (bridges) (204-03.01) | CY | 339 | $133.42 |
| 257 | Rock excavation (bridges) (204-04.01) | CY | 50 | $342.14 |
| 258 | Rock drilling (bridges) (204-05) | LF | 24 | $200.00 |
| 259 | Foundation preparation(see plans) (204-10.01) | LS | 1 | $269,000 |
| 260 | Foundation preparation(see plans) (204-10.02) | LS | 1 | $269,000 |
| 261 | Core drilling for piles(rock) (204-14) | LF | 210 | $273.00 |
| 262 | Core drilling for piles(soil) (204-15) | LF | 674 | $52.50 |
| 263 | Granular backfill (bridges) (303-01.02) | TON | 54 | $55.05 |
| 264 | Epoxy coated reinforcing steel (604-02.03) | LB | 209,144 | $1.60 |
| 265 | Class A concrete (bridges) (604-03.01) | CY | 684 | $1,450.13 |
| 266 | Steel bar reinforcement (bridges) (604-03.02) | LB | 147,321 | $1.38 |
| 267 | Pavement @ bridge ends (604-03.04) | SY | 426 | $346.85 |
| 268 | Class DS concrete (604-03.32) | CY | 975 | $1,219.77 |
| 269 | Three star state emblem (604-04.41) | EACH | 3 | $935.01 |
| 270 | Bridge deck grooving (mechanical) (604-05.31) | SY | 2,171 | $3.62 |
| 271 | Steel piles (10 inch) (606-02.03) | LF | 845 | $75.93 |
| 272 | Bridge deck drains (610-10.40) | LS | 1 | $46,367 |
| 273 | Prestressed concrete bulb tee beam (6" web)(BT-72) (615-01.12) | LF | 2,933 | $505.84 |
| 274 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 225 | $8.48 |
| 275 | 6" pipe underdrain (710-09.02) | LF | 24 | $24.44 |
| 276 | Structural lighting (see plans) (714-01.01) | LS | 1 | $16,863 |
| 277 | Pole 50FT class 2 metal (790-05.06) | EACH | 3 | $6,275.96 |
| 278 | Pole 55FT class H1 metal (790-06.07) | EACH | 1 | $9,207.03 |
| 279 | Pole 60FT class H1 metal (790-07.07) | EACH | 4 | $10,301 |
| 280 | Pole 65FT class H1 metal (790-08.14) | EACH | 5 | $11,334 |
| 281 | Pole(see plans) (790-20.01) | EACH | 1 | $12,893 |
| 282 | 3PH crossarm SGL LRG cond 15KV (790-25.08) | EACH | 5 | $2,445.50 |
| 283 | 3PH crossarm DBL prim support 15KV (790-25.10) | EACH | 2 | $2,729.54 |
| 284 | 3PH crossarm deadend SGL 15KV (790-25.21) | EACH | 4 | $2,020.61 |
| 285 | 3PH crossarm dde 15KV (790-25.23) | EACH | 7 | $2,683.26 |
| 286 | Secondary assemblies LRG angle (790-30.02) | EACH | 1 | $103.07 |
| 287 | Secondary conductor 2 AL triplex (790-30.13) | LF | 136 | $5.76 |
| 288 | Down guy - through bolt type (790-32.01) | EACH | 30 | $565.75 |
| 289 | Down guy - through bolt type heavy duty (790-32.02) | EACH | 5 | $615.35 |
| 290 | Anchor (32,000LB) (790-32.25) | EACH | 20 | $792.98 |
| 291 | OH cond 1/0 6/1 acsr raven (790-40.03) | LF | 168 | $2.92 |
| 292 | OH cond 4/0 6/1 acsr penguin (790-40.06) | LF | 2,640 | $4.31 |
| 293 | OH cond 795 37 aac arbutus (790-40.49) | LF | 9,744 | $9.07 |
| 294 | UG pri cond 1/0 AL 15KV (790-41.03) | LF | 612 | $16.63 |
| 295 | 4IN dia PVC pipe (790-42.10) | LF | 44 | $15.37 |
| 296 | Loadbreak junction 4 PT 200A 15KV (790-43.06) | EACH | 3 | $1,041.80 |
| 297 | Deadbreak elbow 600A 15KV (790-43.13) | EACH | 6 | $585.54 |
| 298 | Primary pullbox (790-43.47) | EACH | 1 | $1,482.37 |
| 299 | 1PH primary riser W/ 3IN conduit (790-43.53) | EACH | 1 | $3,094.15 |
| 300 | 3PH primary riser W/ 3IN conduit (790-43.57) | EACH | 1 | $4,351.84 |
| 301 | 1PH transformer conv W/pole MTD fuse & LA (790-46.02) | EACH | 1 | $1,370.04 |
| 302 | Remove wire (790-98.01) | LF | 6,309 | $2.24 |
| 303 | Remove poles (790-98.02) | EACH | 7 | $495.57 |
| 304 | Remove framing/associated apparatus (790-98.03) | EACH | 45 | $371.68 |
| 305 | 4IN HDPE gas main (791-03.04) | LF | 150 | $63.00 |
| 306 | 8IN HDPE gas main (791-03.06) | LF | 2,675 | $131.25 |
| 307 | 8IN steel casing open cut (791-05.53) | LF | 120 | $236.25 |
| 308 | 16IN steel casing open cut (791-05.58) | LF | 190 | $367.50 |
| 309 | Connect to 6IN EX. PE main (791-06.04) | EACH | 3 | $6,300.00 |
| 310 | 6IN PE gas valve assembly (791-07.03) | EACH | 2 | $2,362.50 |
| 311 | 8IN PE gas valve assembly (791-07.04) | EACH | 7 | $4,620.00 |
| 312 | PE gas fittings (791-07.40) | LB | 1,000 | $0.11 |
| 313 | Reconnect service assembly (791-08.40) | EACH | 2 | $1,890.00 |
| 314 | Bridge hanger system and pipe (791-09.01) | LS | 1 | $311,638 |
| 315 | Cathodic protection junction box (791-09.21) | EACH | 2 | $2,625.00 |
| 316 | Retire in place 6IN serv cut & plug (791-10.06) | EACH | 4 | $2,100.00 |
| 317 | Anchor 1IN (793-01.41) | EACH | 3 | $761.25 |
| 318 | Guy wire 10M or 3/8IN (793-02.08) | EACH | 3 | $488.25 |
| 319 | Install guy guard (793-02.99) | EACH | 3 | $215.25 |
| 320 | 10M strand (793-03.03) | LF | 965 | $3.44 |
| 321 | Underground to overhead riser (793-14.26) | EACH | 1 | $3,994.90 |
| 322 | 12IN dip restrained joint water line (795-01.09) | LF | 890 | $198.88 |
| 323 | 12IN dip slip joint water line (795-01.10) | LF | 1,620 | $160.94 |
| 324 | Bore/jack 24IN steel casing pipe-uncon. (795-05.68) | LF | 50 | $942.48 |
| 325 | Bore/jack 24IN steel casing pipe-rock. (795-05.82) | LF | 50 | $942.48 |
| 326 | Connect to 2IN water line (795-06.01) | EACH | 1 | $6,055.18 |
| 327 | Connect to 6IN water line (795-06.04) | EACH | 2 | $8,713.68 |
| 328 | Connect to 8IN water line (795-06.05) | EACH | 1 | $8,493.61 |
| 329 | Connect to 10IN water line (795-06.06) | EACH | 3 | $14,497 |
| 330 | Cut/cap existing lines (all sizes) (795-06.30) | EACH | 2 | $4,467.28 |
| 331 | 2IN gate valve assembly (795-08.01) | EACH | 1 | $3,675.87 |
| 332 | 6IN gate valve assembly (795-08.04) | EACH | 1 | $4,654.17 |
| 333 | 12IN gate valve assembly (795-08.09) | EACH | 5 | $10,209 |
| 334 | Relocate/reconnect service assembly (795-09.09) | EACH | 1 | $4,330.76 |
| 335 | (TI) of 3IN PVC casing for service pipe-uncon (795-09.35) | LF | 60 | $42.25 |
| 336 | 3/4IN service pipe (795-09.37) | LF | 50 | $43.05 |
| 337 | Reconnect service assembly (795-09.51) | EACH | 4 | $1,987.13 |
| 338 | 2IN auto air release valve assembly (795-10.05) | EACH | 2 | $4,825.48 |
| 339 | Blow-off assembly (795-11.01) | EACH | 3 | $3,666.25 |
| 340 | Fire hydrant assembly (795-11.02) | EACH | 1 | $12,349 |
| 341 | Reconnect fire hydrant (795-11.03) | EACH | 1 | $5,407.36 |
| 342 | Retire in place existing water main (795-11.12) | LF | 700 | $204.01 |
| 343 | Remove fire hydrant (795-12.01) | EACH | 1 | $1,562.41 |
| 344 | DI fittings (795-13.01) | LB | 3,200 | $11.01 |
| 345 | Bridge hanger system (795-13.04) | LS | 1 | $223,485 |
| 346 | 24IN steel casing pipe open cut method (795-15.07) | LF | 75 | $617.24 |
| 347 | 2IN PVC force main (797-03.04) | LF | 171 | $66.74 |
| 348 | 8IN PVC force main (797-03.07) | LF | 1,780 | $125.00 |
| 349 | 8IN PVC gravity sewer 6FT-12FT depth (797-05.52) | LF | 30 | $210.00 |
| 350 | 8IN PVC gravity sewer 12FT-18FT depth (797-05.53) | LF | 30 | $210.00 |
| 351 | 10IN PVC gravity sewer 6FT-12FT depth (797-05.56) | LF | 600 | $125.00 |
| 352 | 10IN PVC gravity sewer 12FT-18FT depth (797-05.57) | LF | 215 | $287.00 |
| 353 | 24IN PVC gravity sewer 12FT-18FT depth (797-05.73) | LF | 90 | $480.25 |
| 354 | 24IN PVC gravity sewer >18FT depth (797-05.74) | LF | 205 | $606.46 |
| 355 | __in PVC gravity sewer 6FT-12FT depth (797-05.80) | LF | 40 | $140.14 |
| 356 | __in PVC gravity sewer 12FT-18FT depth (797-05.81) | LF | 40 | $400.51 |
| 357 | Bore/jack 16IN steel casing pipe-uncon. (797-06.64) | LF | 25 | $992.46 |
| 358 | Bore/jack 16IN steel casing pipe-rock. (797-06.77) | LF | 25 | $992.46 |
| 359 | Open cut 16IN steel casing pipe (797-06.90) | LF | 100 | $580.43 |
| 360 | Open cut 48IN steel casing pipe (797-06.96) | LF | 250 | $1,394.49 |
| 361 | 48IN manhole 6FT-8FT depth (797-07.03) | EACH | 2 | $6,344.54 |
| 362 | 48IN manhole 8FT-10FT depth (797-07.04) | EACH | 3 | $8,917.12 |
| 363 | 60IN manhole 8FT-10FT depth (797-07.15) | EACH | 1 | $18,903 |
| 364 | 60IN manhole 10FT-12FT depth (797-07.16) | EACH | 1 | $20,607 |
| 365 | 60IN manhole 12FT-14FT depth (797-07.17) | EACH | 1 | $14,986 |
| 366 | Manhole drop connection assembly (797-07.56) | EACH | 1 | $6,249.60 |
| 367 | Adjust existing manhole (raise to new grade) (797-07.61) | EACH | 1 | $5,248.48 |
| 368 | DI fittings (797-08.01) | LB | 3,000 | $17.27 |
| 369 | 6IN PVC pipe for service lateral (797-08.05) | LF | 100 | $87.71 |
| 370 | 8IN plug valve assembly (797-09.08) | EACH | 2 | $21,066 |
| 371 | 1IN combo air release valve assembly (797-09.19) | EACH | 2 | $5,670.69 |
| 372 | Cut and cap 10IN gravity (797-09.48) | EACH | 1 | $8,519.91 |
| 373 | Connect EX.10-18IN sewer to new manhole (797-10.10) | EACH | 2 | $9,510.96 |
| 374 | Connect EX. >18IN sewer to new manhole (797-10.11) | EACH | 1 | $11,073 |
| 375 | 60IN manhole rehabilitation (797-11.11) | VF | 20 | $803.91 |
| 376 | Retirein place existing sewer 8IN-14IN (797-11.31) | LF | 270 | $204.01 |
| 377 | By-pass pumping (797-11.38) | LS | 1 | $75,096 |
| 378 | Bridge hanger system (797-11.43) | LS | 1 | $173,933 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.