TDOT contract CN261061 bid tabulation

The intersection improvements on s.r. 131 (emory road) at harrell road/carpenter road (l.m. 9.5), including grading, drainage, signals, and paving. Let by Tennessee DOT on August 14, 2026, Knox County. 4 bids received; low bid $7,897,170 by Charles Blalock & Sons, Inc..

Owner
Tennessee DOT
Letting
14 AUG 2026
Pay items
203
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Charles Blalock & Sons, Inc.$7,897,170Low
2Cleary Construction, Inc.$9,179,203+16%
3Southern Constructors, Inc.$9,401,602+19%
4Whaley Construction, LLC$10,499,161+33%
TDOT contract CN261061: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Charles Blalock & Sons, Inc.2. Cleary Construction, Inc.3. Southern Constructors, Inc.4. Whaley Construction, LLC
1Construction stakes, lines and grades (105-01)LS1$80,000$87,500$100,000$169,485
2Clearing and grubbing (201-01)LS1$250,000$465,000$125,000$456,540
3Removal of structures and obstructions (202-01.50)EACH5$4,000.00$1,925.00$12,500$7,412.34
4Removal of pipe (24" ,sta.202+67.90) (202-02.01)LF20$10.00$50.00$75.00$68.32
5Removal of pipe (15", sta.202+94.70) (202-02.02)LF27$10.00$37.00$60.00$52.78
6Removal of pipe (18" ,sta.106+84.34) (202-02.03)LF278$10.00$21.00$60.00$61.89
7Removal of pipe (15" ,sta.110+86.87) (202-02.04)LF21$10.00$47.00$60.00$53.96
8Removal of pipe (15" ,sta.111+75.08) (202-02.05)LF31$10.00$32.00$60.00$52.12
9Removal of pipe (15" ,sta.112+47.21) (202-02.06)LF27$10.00$37.00$60.00$51.98
10Removal of pipe (18" ,sta.113+95.82) (202-02.07)LF31$10.00$32.00$60.00$58.23
11Removal of pipe (18" ,sta.114+05.43) (202-02.08)LF41$10.00$24.00$60.00$57.45
12Removal of pipe (18" ,sta.114+35.71) (202-02.09)LF31$10.00$32.00$60.00$56.39
13Removal of pipe (18" ,sta.300+63.87) (202-02.10)LF42$10.00$23.00$60.00$58.23
14Removal of pipe (18" ,sta.301+08.93) (202-02.11)LF22$10.00$45.00$60.00$59.63
15Removal of pipe (48" ,sta.400+32.52) (202-02.12)LF31$10.00$81.00$175.00$186.36
16Removal of pipe (18" ,sta.302+26.48) (202-02.13)LF60$10.00$41.00$60.00$58.41
17Removal of pipe (18" ,sta.400+92.87) (202-02.14)LF24$10.00$41.00$60.00$56.23
18Removal of pipe (18" ,sta.400+71.37) (202-02.15)LF18$10.00$55.00$60.00$61.32
19Removal of pipe (18" ,sta.500+47.58) (202-02.17)LF25$10.00$40.00$60.00$62.38
20Removal of pipe (18" ,sta.500+40.92) (202-02.18)LF23$10.00$43.00$60.00$63.27
21Removal of curb (sta. 500+00 - sta. 501+25.00) (202-08.10)LF229$30.00$10.00$20.00$52.36
22Road & drainage excavation (unclassified) (203-01)CY6,633$15.00$61.60$50.00$55.28
23Borrow excavation (unclassified) (203-03)CY5,262$35.00$27.25$60.00$65.89
24Placing and spreading topsoil (203-04)CY934$5.00$40.50$35.00$35.32
25Water (203-06)MG69$10.00$130.00$260.00$115.28
26Furnishing & spreading topsoil (203-07)CY354$70.00$95.65$80.00$75.47
27Flowable fill (excavatable) (204-06.02)CY103$806.72$585.00$600.00$550.23
28Brooming & degrassing shoulders (208-01.05)LM0.06$42,801$59,500$7,500.00$21,147
29Sediment removal (209-05)CY167$5.00$77.35$46.00$110.28
30Temporary silt fence (with backing) (209-08.02)LF860$4.73$6.50$7.00$5.55
31Rock check dam (209-08.07)EACH6$840.00$1,000.00$1,000.00$750.21
32Enhanced rock check dam (209-08.08)EACH3$1,260.00$1,485.00$1,250.00$1,258.39
33Curb inlet protection (type 1) (209-09.40)EACH28$183.75$235.00$400.00$441.23
34Catch basin protection (type E) (209-40.34)EACH1$262.50$350.00$1,100.00$328.96
35Catch basin filter assembly(type 1) (209-40.41)EACH5$682.50$830.00$700.00$1,587.36
36Catch basin filter assembly(type 8) (209-40.48)EACH1$1,575.00$1,850.00$1,100.00$1,798.39
37Temporary diversion channel (209-65.03)LF430$49.68$112.00$250.00$185.47
38Mineral aggregate, type A base, grading D (303-01)TON5,176$71.00$63.50$65.00$62.37
39Granular backfill (roadway) (303-01.01)TON1,643$71.00$76.25$70.00$65.23
40Mineral aggregate (size 57) (303-10.01)TON86$119.91$66.50$90.00$78.36
41Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON982$142.80$160.00$160.00$220.36
42Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON984$162.75$185.00$170.00$242.12
43Bituminous material for prime coat (PC) (402-01)TON8$142.00$1,550.00$1,325.00$1,100.46
44Bituminous material for tack coat (TC) (403-01)TON5$987.00$1,115.00$950.00$568.32
45Acs mix(PG64-22) grading D (411-01.10)TON741$210.00$235.00$225.00$275.63
46Cold planing bituminous pavement (415-01.01)TON192$105.00$120.00$125.00$198.85
47Class A concrete (roadway) (604-01.01)CY213$1,600.00$2,341.00$3,250.00$1,998.32
48Steel bar reinforcement (roadway) (604-01.02)LB50,498$2.00$1.90$2.25$3.15
4918" concrete pipe culvert (class III) (607-03.02)LF1,282$265.39$145.00$250.00$221.84
5024" concrete pipe culvert (class III) (607-05.02)LF141$289.72$173.00$400.00$286.38
5136" concrete pipe culvert (class III) (607-07.02)LF145$397.79$279.00$350.00$387.42
52Class A concrete (pipe endwalls) (611-07.01)CY21$4,082.55$3,570.00$1,750.00$2,154.65
53Steel bar reinforcement (pipe endwalls) (611-07.02)LB722$18.31$4.25$2.25$5.63
54Catch basins, type 12, 0' - 4' depth (611-12.01)EACH1$12,638$8,100.00$7,000.00$9,547.23
55Catch basins, type 12, > 8' - 12' depth (611-12.03)EACH2$15,333$12,750$9,500.00$11,548
56Catch basins, type 14, 0' - 4' depth (611-14.01)EACH1$16,504$13,800$9,500.00$10,353
57Catch basins, type 14, > 4' - 8' depth (611-14.02)EACH3$16,766$15,000$12,000$12,857
58Catch basins, type 25, 0' - 4' depth (611-25.01)EACH1$12,710$8,115.00$7,500.00$9,265.87
59Catch basins, type 25, > 4' - 8' depth (611-25.02)EACH3$13,440$11,750$8,000.00$10,124
60Catch basins, type 25, > 12' - 16' depth (611-25.04)EACH2$21,507$28,715$18,000$23,525
61Catch basins, type 26, > 4' - 8' depth (611-26.02)EACH1$19,004$21,350$12,500$13,659
62Catch basins, type 42, 0' - 4' depth (611-42.01)EACH2$11,151$6,700.00$6,500.00$9,123.64
63Catch basins, type 42, > 4' - 8' depth (611-42.02)EACH2$13,702$12,000$9,500.00$12,590
64Catch basins, type 42, > 8' - 12' depth (611-42.03)EACH1$16,483$20,000$15,000$13,854
65Catch basins, type 43, > 4' - 8' depth (611-43.02)EACH1$19,987$22,650$16,000$16,834
6618" temporary drainage pipe (621-03.02)LF153$130.09$120.00$85.00$108.58
6724" temporary drainage pipe (621-03.03)LF100$202.01$142.00$90.00$132.45
6830" temporary drainage pipe (621-03.04)LF1,898$88.41$125.00$100.00$109.32
6954" temporary drainage pipe (621-03.08)LF60$419.74$465.00$250.00$387.32
70Temporary shoring (temporary runaround) (621-05.10)LS1$197,290$760,000$450,000$185,258
71Concrete driveway (701-02)SF3,187$16.80$15.50$20.00$30.98
72Concrete curb (702-01)CY27$1,034.25$1,125.00$900.00$1,243.63
73Concrete combined curb & gutter (702-03)CY164$792.75$715.00$650.00$852.51
74Metal beam guard fence (705-01.04)LF33$79.80$90.00$80.00$128.70
75W beam GR (type 2) MASH TL-3 (705-06.01)LF384$28.35$32.00$30.00$29.70
76GR terminal (in-inline) MASH TL-3 (705-06.11)EACH3$1,149.75$1,300.00$1,200.00$1,320.20
77Tangent energy absorbing term MASH TL-3 (705-06.20)EACH2$3,570.00$4,100.00$3,600.00$3,685.10
78GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH1$2,971.50$3,350.00$3,000.00$3,520.30
79Guardrail removed (706-01)LF281$4.73$13.25$5.00$1.10
80Radius rail (706-06.03)LF64$36.75$41.50$38.00$48.40
81Rounded end element (706-10.26)EACH3$126.00$143.00$150.00$275.20
82Markers (concrete R.O.W. posts) (708-02.01)EACH28$747.61$360.00$500.00$550.32
83Machined rip-rap (class A-3) (709-05.05)TON100$95.00$90.00$90.00$86.39
84Machined rip-rap (class A-1) (709-05.06)TON1,315$95.00$87.00$120.00$85.12
85Machined rip-rap (class B) (709-05.08)TON1,241$95.00$75.00$90.00$98.36
86Traffic control (712-01)LS1$265,205$325,000$300,000$652,128
87Portable barrier rail (MASH TL-3) (712-02.10)LF3,460$101.66$46.50$50.00$135.37
88Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH10$5,118.75$7,500.00$7,500.00$12,542
89Flexible drums (channelizing) (712-04.01)EACH50$45.00$48.00$50.00$44.55
90Barrier rail delineator (712-04.50)EACH170$20.00$20.00$35.00$17.88
91Warning lights (type A) (712-05.01)EACH25$2.00$33.00$50.00$30.80
92Signs (construction) (712-06)SF693$8.00$9.75$17.00$8.97
93Temporary barricades (type III) (712-07.03)LF40$16.00$19.00$30.00$17.60
94Removable pavement marking (stop line) (712-09.04)LF107$15.75$17.75$35.00$16.58
95Removable pavement marking (6" line) (712-09.08)LF8,620$3.27$3.50$4.00$3.42
96Removable black-out tape (6") (712-09.30)LF9,279$3.27$3.50$4.50$3.42
97Class A concrete (foundation for sign supports) (713-01.01)CY1$210.00$240.00$250.00$220.30
98Steel bar reinforcement(foundation for sign supports) (713-01.02)LB125$1.05$1.20$1.25$1.10
99Perforated/knockout square tube post (713-11.02)LB272$4.73$5.25$5.00$4.95
100P post slip base (713-11.21)EACH5$556.50$630.00$600.00$583.26
101Flat sheet aluminum signs (0.100" thick) (713-13.03)SF54$15.07$17.00$20.00$15.79
102Street name sign (rigid 0.100IN thick (713-14.21)SF82$121.80$138.00$40.00$127.60
103Removal of signs, posts and footings (713-15)LS1$315.00$350.00$2,000.00$330.23
104Suspended flat sheet aluminum sign (0.080" thick) (713-15.07)EACH2$345.45$390.00$750.00$361.90
105Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH58$42.00$48.00$60.00$44.23
106Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH30$42.00$48.00$60.00$44.23
107Removal of snowplowable reflective marker (716-01.30)EACH12$7.88$9.00$20.00$8.25
108Plastic pavement marking (stop line) (716-02.05)LF230$10.50$12.00$16.00$11.23
109Plastic pavement marking (turn lane arrow) (716-02.06)EACH6$131.25$148.00$300.00$137.50
110Plastic pavement marking (8" dotted line) (716-02.08)LF738$1.58$1.80$3.50$1.65
111Plastic pavement marking (8IN line) (716-02.12)LM0.20$8,316.00$9,500.00$12,000$8,712.94
112Plastic pavement marking (straight-turn arrow) (716-04.01)EACH2$157.50$175.00$400.00$165.00
113Plastic pavement marking (straight arrow) (716-04.05)EACH2$131.25$150.00$200.00$137.50
114Painted pavement marking (6" line) (716-05.20)LM0.70$1,312.50$1,500.00$1,850.00$1,375.00
115Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM2$6,168.75$7,000.00$8,500.00$6,462.50
116Mobilization (717-01)LS1$650,161$915,000$900,000$898,327
117Signal head assembly (130 with backplate) (730-02.09)EACH6$1,569.75$1,650.00$1,500.00$1,644.50
118Signal head assembly (150 A2H with backplate) (730-02.17)EACH2$2,546.25$2,700.00$2,500.00$2,667.50
119Signal head assembly (140 A4F with backplate) (730-02.59)EACH2$1,937.25$2,050.00$2,000.00$2,029.50
120Install pull box (type B) (730-03.21)EACH4$1,302.00$1,350.00$1,250.00$1,364.00
121Electrical service connection (730-05.01)EACH1$5,748.75$6,115.00$6,000.00$6,022.50
122Signal cable - 7 conductor (730-08.03)LF1,137$3.47$3.70$4.00$3.63
123Conduit 2" diameter (directional bore) (730-12.23)LF224$56.70$60.00$55.00$59.40
124Conduit 2" diameter (PVC schedule 80) (730-12.26)LF174$16.80$26.20$25.00$17.60
125Conduit 3" diameter (PVC schedule 80) (730-12.27)LF17$46.20$50.00$50.00$48.40
126Vehicle detector (video) (730-13.02)EACH2$5,502.00$5,550.00$7,500.00$5,764.00
127Vehicle detector (360-degree camera) (730-13.14)EACH1$38,850$40,400$40,000$40,700
128Cabinet (atc) (730-15.07)EACH1$38,063$39,275$38,000$39,875
129Controller (atc) (730-16.04)EACH1$11,760$12,250$12,000$12,320
130Cantilever signal support (1 arm @ 55') (730-25.07)EACH2$45,728$43,920$45,000$47,905
131Cantilever signal support (1 arm @ 60') (730-25.11)EACH1$41,895$43,080$45,000$43,890
132Cantilever signal support (1 arm @ 65') (730-25.13)EACH1$56,805$51,000$50,000$59,510
133Geomembrane (740-06.01)SY995$21.01$11.75$20.00$25.89
134Geotextile (type III)(erosion control) (740-10.03)SY2,514$2.47$4.05$12.00$6.32
135Temporary sediment tube 18IN (740-11.03)LF3,653$3.68$5.25$7.00$5.98
136Seeding (with mulch) (801-01)UNIT78$42.00$47.50$50.00$60.51
137Temporary seeding (with mulch) (801-01.07)UNIT69$31.50$35.75$40.00$38.57
138Natve seed MX final stablizatn of slopes (801-01.38)UNIT17$105.00$119.00$90.00$154.52
139Water (seeding & sodding) (801-03)MG60$78.75$89.25$105.00$82.51
140Sodding (new sod) (803-01)SY6,142$6.30$7.15$7.50$6.11
141Project mowing (806-02.03)CYCL4$270.00$5,950.00$6,000.00$2,958.74
1422IN mdpe gas main (791-02.02)LF530$73.77$172.00$65.00$57.20
1434IN mdpe gas main (791-02.04)LF160$91.36$172.00$70.00$61.60
1448IN mdpe gas main (791-02.06)LF767$114.47$211.00$120.00$114.40
145HDD 2IN PE pipe - unconsolidated (791-04.02)LF100$73.48$300.00$80.00$74.80
146Connect to 2IN EX. PE main (791-06.02)EACH7$3,327.02$3,250.00$3,500.00$2,750.30
147Connect to 8IN EX. PE main (791-06.05)EACH2$5,652.14$6,000.00$8,500.00$7,920.20
1482IN PE gas valve assembly (791-07.01)EACH6$755.83$1,450.00$3,000.00$2,420.30
1494IN PE gas valve assembly (791-07.02)EACH2$1,499.93$2,000.00$4,000.00$3,300.80
1508IN PE gas valve assembly (791-07.04)EACH4$3,644.96$4,750.00$6,500.00$5,720.90
151PE gas fittings (791-07.40)LB500$38.67$0.01$22.00$16.58
1521/2IN service assembly (791-08.01)EACH2$2,144.70$3,000.00$3,000.00$1,981.30
1531/2IN PE service pipe (791-08.06)LF250$17.97$40.00$65.00$52.80
154Retire gas main (791-10.10)LS1$9,998.10$5,500.00$8,000.00$8,581.40
1556IN dip restrained joint water line (795-01.03)LF60$225.51$188.00$190.00$168.27
1566IN dip slip joint water line (795-01.04)LF49$138.69$175.00$190.00$211.12
1578IN dip restrained joint water line (795-01.05)LF160$227.77$188.00$200.00$223.69
1588IN dip slip joint water line (795-01.06)LF261$127.69$177.00$200.00$237.89
15912IN dip restrained joint water line (795-01.09)LF200$250.71$215.00$260.00$288.32
16012IN dip slip joint water line (795-01.10)LF316$199.89$210.00$260.00$308.46
16116IN dip restrained joint water line (795-01.13)LF200$315.00$305.00$350.00$357.41
16216IN dip slip joint water line (795-01.14)LF309$267.38$270.00$350.00$394.51
163Bore/jack 24IN steel casing pipe-uncon. (795-05.68)LF75$2,310.00$1,130.00$1,400.00$1,241.87
164Connect to 6IN water line (795-06.04)EACH1$5,250.00$2,500.00$5,000.00$6,412.32
165Connect to 8IN water line (795-06.05)EACH3$6,300.00$2,750.00$7,500.00$7,887.21
166Connect to 16IN water line (795-06.09)EACH1$15,598$6,500.00$15,000$16,522
167Cut and cap 6IN water line (795-06.33)EACH1$2,283.79$3,000.00$3,500.00$7,142.36
168Cut and cap 8IN water line (795-06.34)EACH4$3,234.86$3,250.00$3,500.00$9,232.08
169Cut and cap 16IN water line (795-06.39)EACH1$6,252.53$4,000.00$6,000.00$24,336
17016IN X 8IN tapping sleeve and valve (795-07.18)EACH1$21,000$12,000$35,000$29,874
1716IN gate valve assembly (795-08.04)EACH2$2,310.00$3,250.00$4,000.00$5,512.39
17212IN gate valve assembly (795-08.09)EACH2$5,355.00$7,500.00$5,500.00$6,897.41
17316IN butterfly valve assembly (795-08.13)EACH2$10,500$21,500$13,000$11,872
174TI of 2IN HDPE casing for service pipe-uncon (795-09.24)LF140$82.72$230.00$50.00$119.27
1753/4IN copper service pipe (795-09.28)LF365$26.25$60.00$35.00$48.31
1761IN copper service pipe (795-09.29)LF40$57.75$65.00$50.00$68.41
1771IN auto air release valve assembly (795-10.03)EACH2$4,934.39$6,100.00$8,000.00$4,787.39
178Fire hydrant assembly (795-11.02)EACH1$10,500$13,500$17,000$8,412.69
179Retire in place existing water main (795-11.12)LF1,163$7.58$25.00$20.00$41.26
180DI fittings (795-13.01)LB4,500$9.45$15.00$32.00$9.87
18124IN steel casing pipe open cut method (795-15.07)LF65$572.87$525.00$450.00$683.24
18230IN steel casing pipe open cut method (795-15.10)LF65$763.42$655.00$750.00$815.42
183Relocate/reconnect 3/4IN water meter assembly (795-16.16)EACH11$2,991.15$1,650.00$2,500.00$2,147.28
1848IN PVC gravity sewer 0FT-6FT depth (797-05.51)LF95$169.78$140.00$275.00$284.37
1858IN PVC gravity sewer 6FT-12FT depth (797-05.52)LF535$230.52$150.00$315.00$314.28
1868IN PVC gravity sewer 12FT-18FT depth (797-05.53)LF245$447.58$250.00$350.00$410.28
1878IN PVC gravity sewer >18FT depth (797-05.54)LF100$593.76$250.00$450.00$417.28
188Bore/jack 16IN steel casing pipe-uncon. (797-06.64)LF430$729.63$860.00$1,100.00$1,028.31
18948IN manhole 4FT-6FT depth (797-07.02)EACH1$8,228.36$9,000.00$9,000.00$12,148
19048IN manhole 6FT-8FT depth (797-07.03)EACH2$7,296.20$11,000$12,000$15,436
19148IN manhole 8FT-10FT depth (797-07.04)EACH2$7,810.03$12,000$14,000$17,236
19248IN manhole 10FT-12FT depth (797-07.05)EACH1$12,337$13,000$17,500$19,287
19348IN manhole 14FT-16FT depth (797-07.07)EACH2$13,841$17,000$20,500$24,185
194Manhole drop connection assembly (797-07.56)EACH1$10,245$6,000.00$5,000.00$6,217.84
1956IN PVC pipe for service lateral (797-08.05)LF25$393.19$155.00$250.00$101.87
1966IN clean out assembly (797-08.08)EACH1$2,155.85$1,800.00$3,500.00$3,945.28
197Connect 6IN lateral to sewer line (797-10.06)EACH1$4,406.58$2,500.00$3,500.00$4,287.39
198Retirein place 48IN manhole (797-11.25)EACH5$5,761.01$2,500.00$3,500.00$2,874.69
199Retirein place existing sewer 8IN-14IN (797-11.31)LF900$39.56$27.00$25.00$49.26
200Remove existing sewer 8IN-14IN (797-11.35)LF100$84.54$40.00$275.00$51.36
201By-pass pumping (797-11.38)LS1$74,949$45,000$25,000$257,489
202Concrete encasement (797-40.01)LF30$547.28$250.00$400.00$98.23
203Additional work (797-99.01)LS1$20,961$12,000$35,000$93,697
TDOT contract CN261061: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy