TDOT contract CNZ178 bid tabulation
The construction of a concrete bulb-tee beam bridge on u.s. 27 (s.r. 29) over u.s. 27 (s.r. 29)/s.r. 61 (l.m. 12.10), including grading, drainage, and paving. Let by Tennessee DOT on June 27, 2025, Roane County. 7 bids received; low bid $4,478,908 by Whaley Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 70
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Whaley Construction, LLC | $4,478,908 | Low |
| 2 | Bell & Associates Construction, LLC | $4,482,066 | 0.0% |
| 3 | Charles Blalock & Sons, Inc. | $4,496,286 | 0.0% |
| 4 | Mid-State Construction Company, Inc. | $4,603,568 | +3.0% |
| 5 | Summers-Taylor, Inc. | $5,493,013 | +23% |
| 6 | Cleary Construction, Inc. | $5,943,298 | +33% |
| 7 | Southern Constructors, Inc. | $5,998,350 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Whaley Construction, LLC | 2. Bell & Associates Construction, LLC | 3. Charles Blalock & Sons, Inc. | 4. Mid-State Construction Company, Inc. | 5. Summers-Taylor, Inc. | 6. Cleary Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $29,005 | $28,000 | $27,686 | $51,569 | $133,500 | $206,000 |
| 2 | Trainee (109-10.01) | HR | 1,100 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $20,000 | $100,000 | $63,383 | $45,254 | $52,500 | $40,000 |
| 4 | Road & drainage excavation (unclassified) (203-01) | CY | 9,024 | $21.25 | $25.00 | $29.28 | $17.92 | $30.00 | $22.25 |
| 5 | Borrow excavation (unclassified) (203-03) | CY | 1,895 | $34.00 | $80.00 | $30.98 | $78.40 | $70.00 | $44.00 |
| 6 | Placing and spreading topsoil (203-04) | CY | 1,724 | $15.00 | $25.00 | $20.99 | $19.04 | $32.00 | $22.00 |
| 7 | Water (203-06) | MG | 51 | $150.00 | $5.00 | $79.95 | $33.60 | $184.00 | $140.00 |
| 8 | Sediment removal (209-05) | CY | 56 | $100.00 | $5.00 | $91.50 | $22.40 | $23.00 | $75.00 |
| 9 | Temporary silt fence (with backing) (209-08.02) | LF | 694 | $5.60 | $5.70 | $5.36 | $5.71 | $6.50 | $6.50 |
| 10 | Temporary silt fence (without backing) (209-08.03) | LF | 2,654 | $3.20 | $3.20 | $3.05 | $3.25 | $2.80 | $3.50 |
| 11 | Rock check dam (209-08.07) | EACH | 7 | $1,100.00 | $1,110.00 | $1,050.00 | $1,120.00 | $650.00 | $1,200.00 |
| 12 | Enhanced rock check dam (209-08.08) | EACH | 1 | $1,540.00 | $2,000.00 | $1,470.00 | $1,568.00 | $950.00 | $1,700.00 |
| 13 | Mineral aggregate, type A base, grading D (303-01) | TON | 4,614 | $50.40 | $75.00 | $52.21 | $56.00 | $58.00 | $55.00 |
| 14 | Mineral aggregate (size 57) (303-10.01) | TON | 2,180 | $54.00 | $70.00 | $51.87 | $80.45 | $80.00 | $60.00 |
| 15 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 529 | $157.50 | $176.00 | $167.37 | $178.30 | $172.50 | $188.00 |
| 16 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 436 | $186.90 | $189.00 | $212.10 | $190.29 | $205.00 | $200.00 |
| 17 | Bituminous material for prime coat (PC) (402-01) | TON | 12 | $1,575.00 | $1,300.00 | $1,575.00 | $1,400.00 | $1,725.00 | $1,500.00 |
| 18 | Aggregate for cover material (PC) (402-02) | TON | 40 | $367.50 | $120.00 | $148.05 | $140.00 | $402.00 | $150.00 |
| 19 | Bituminous material for tack coat (TC) (403-01) | TON | 5 | $997.50 | $1,500.00 | $1,575.00 | $1,568.00 | $1,090.00 | $1,650.00 |
| 20 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 146 | $351.75 | $215.00 | $252.33 | $220.98 | $385.00 | $235.00 |
| 21 | Acs mix(PG64-22) grading D (411-01.10) | TON | 575 | $222.60 | $215.00 | $241.83 | $220.98 | $244.00 | $230.00 |
| 22 | Cold planing bituminous pavement (415-01.01) | TON | 170 | $194.25 | $94.00 | $246.16 | $95.20 | $213.00 | $117.00 |
| 23 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 90 | $185.50 | $160.00 | $149.75 | $168.00 | $204.00 | $145.00 |
| 24 | 18IN endwall (side drain) (611-07.31) | EACH | 4 | $6,250.00 | $7,100.00 | $6,109.33 | $6,160.00 | $11,700 | $6,300.00 |
| 25 | Cement concrete ditch paving (reinforced) (703-02) | CY | 12 | $1,250.00 | $3,000.00 | $1,105.15 | $909.61 | $800.00 | $2,400.00 |
| 26 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 325 | $31.00 | $28.00 | $26.51 | $37.51 | $30.00 | $30.00 |
| 27 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 2 | $3,960.00 | $3,350.00 | $3,202.50 | $3,908.80 | $3,540.00 | $3,750.00 |
| 28 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 2 | $2,970.00 | $2,275.00 | $2,152.50 | $2,423.68 | $2,380.00 | $2,500.00 |
| 29 | Guardrail removed (706-01) | LF | 150 | $11.00 | $1.00 | $7.88 | $4.48 | $8.00 | $9.00 |
| 30 | High-visibility construction fence (707-08.11) | LF | 390 | $5.00 | $6.00 | $5.78 | $6.16 | $6.00 | $6.50 |
| 31 | Machined rip-rap (class A-3) (709-05.05) | TON | 771 | $58.50 | $100.00 | $72.57 | $61.60 | $135.00 | $100.00 |
| 32 | Machined rip-rap (class A-1) (709-05.06) | TON | 46 | $75.50 | $125.00 | $80.99 | $95.20 | $155.00 | $114.00 |
| 33 | Traffic control (712-01) | LS | 1 | $66,800 | $10,000 | $57,185 | $198,173 | $271,000 | $245,000 |
| 34 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $38.50 | $35.00 | $37.12 | $39.20 | $41.00 | $48.00 |
| 35 | Signs (construction) (712-06) | SF | 614 | $9.15 | $9.00 | $8.80 | $9.30 | $9.70 | $10.00 |
| 36 | Temporary barricades (type III) (712-07.03) | LF | 168 | $19.80 | $19.97 | $19.09 | $20.16 | $21.00 | $18.00 |
| 37 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 2,500 | $4.25 | $4.70 | $4.04 | $4.76 | $4.50 | $5.00 |
| 38 | Removable pavement marking (stop line) (712-09.04) | LF | 16 | $20.35 | $24.00 | $19.43 | $24.64 | $21.00 | $22.00 |
| 39 | Removable pavement marking (arrow) (712-09.05) | EACH | 2 | $220.00 | $220.00 | $210.00 | $224.00 | $230.00 | $240.00 |
| 40 | Removal of signs, posts and footings (713-15) | LS | 1 | $55.00 | $330.00 | $53.04 | $56.00 | $63.00 | $6,000.00 |
| 41 | Changeable message sign unit (713-16.01) | EACH | 1 | $7,920.00 | $10,000 | $7,636.37 | $8,064.00 | $8,500.00 | $12,000 |
| 42 | Signs (W4-1) (713-16.20) | EACH | 1 | $302.50 | $300.00 | $291.67 | $308.00 | $320.00 | $450.00 |
| 43 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 19 | $110.00 | $90.00 | $105.00 | $95.20 | $115.00 | $118.00 |
| 44 | Removal of snowplowable reflective marker (716-01.30) | EACH | 11 | $27.50 | $55.00 | $26.25 | $56.00 | $28.00 | $30.00 |
| 45 | Painted pavement marking (6" line) (716-05.20) | LM | 1 | $3,025.00 | $2,000.00 | $2,887.50 | $2,016.00 | $3,200.00 | $3,300.00 |
| 46 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1 | $8,250.00 | $9,400.00 | $7,875.00 | $9,520.00 | $8,650.00 | $8,900.00 |
| 47 | Mobilization (717-01) | LS | 1 | $206,910 | $331,000 | $300,000 | $368,423 | $480,000 | $593,000 |
| 48 | Geogrid reinforcement type 2 (740-07.04) | SY | 2,861 | $6.00 | $9.00 | $13.52 | $5.60 | $17.00 | $4.30 |
| 49 | Geotextile (type III)(erosion control) (740-10.03) | SY | 623 | $5.00 | $5.00 | $4.83 | $5.32 | $4.20 | $5.40 |
| 50 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 924 | $6.00 | $7.00 | $10.76 | $5.60 | $6.50 | $5.60 |
| 51 | Temporary seeding (with mulch) (801-01.07) | UNIT | 104 | $40.70 | $40.00 | $38.85 | $41.44 | $54.00 | $44.00 |
| 52 | Seeding (without mulch) (801-02) | UNIT | 88 | $33.00 | $30.00 | $31.50 | $33.60 | $31.00 | $35.00 |
| 53 | Water (seeding & sodding) (801-03) | MG | 25 | $110.00 | $100.00 | $105.00 | $112.00 | $98.00 | $118.00 |
| 54 | Erosion control blanket (type II) (805-12.02) | SY | 9,834 | $1.10 | $1.10 | $1.05 | $1.12 | $1.50 | $1.25 |
| 55 | Removal of structures (exist. bridge no. 73-SR029-12.83) (202-04.01) | LS | 1 | $262,454 | $170,000 | $136,586 | $309,210 | $310,000 | $420,000 |
| 56 | Dry excavation (bridges) (204-02.01) | CY | 682 | $45.00 | $50.00 | $52.61 | $59.58 | $30.00 | $36.00 |
| 57 | Granular backfill (bridges) (303-01.02) | TON | 40 | $50.00 | $75.00 | $145.62 | $74.66 | $72.00 | $86.00 |
| 58 | Epoxy coated reinforcing steel (604-02.03) | LB | 98,332 | $2.25 | $1.80 | $1.69 | $2.13 | $1.42 | $1.75 |
| 59 | Class A concrete (bridges) (604-03.01) | CY | 449 | $1,240.00 | $1,250.00 | $1,541.37 | $1,012.77 | $1,497.00 | $1,800.00 |
| 60 | Steel bar reinforcement (bridges) (604-03.02) | LB | 80,290 | $2.10 | $1.31 | $1.38 | $1.68 | $1.60 | $2.00 |
| 61 | Pavement @ bridge ends (604-03.04) | SY | 218 | $566.70 | $675.00 | $582.07 | $443.85 | $480.00 | $570.00 |
| 62 | Class D concrete (bridge deck) (604-03.09) | CY | 319 | $1,425.00 | $1,280.00 | $1,397.51 | $1,082.73 | $1,393.00 | $1,650.00 |
| 63 | Applied texture finish (new structures) (604-04.01) | SY | 3,356 | $14.00 | $9.50 | $16.07 | $10.08 | $18.00 | $22.00 |
| 64 | Three star state emblem (604-04.41) | EACH | 4 | $1,850.00 | $3,500.00 | $642.86 | $1,765.54 | $2,200.00 | $2,600.00 |
| 65 | Bridge deck grooving (mechanical) (604-05.31) | SY | 1,044 | $7.60 | $4.25 | $7.23 | $13.20 | $9.00 | $11.00 |
| 66 | Steel piles (10 inch) (606-02.03) | LF | 2,281 | $160.00 | $79.00 | $65.53 | $86.26 | $80.00 | $95.00 |
| 67 | Prestressed concrete bulb tee beam (6" web)(BT-72) (615-01.12) | LF | 1,103 | $457.00 | $440.00 | $561.84 | $521.24 | $600.00 | $708.50 |
| 68 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 536 | $162.10 | $135.00 | $106.74 | $179.29 | $140.00 | $166.00 |
| 69 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 173 | $45.00 | $65.00 | $55.22 | $71.23 | $37.00 | $44.00 |
| 70 | 6" pipe underdrain (710-09.02) | LF | 40 | $25.00 | $35.00 | $88.51 | $33.83 | $30.00 | $36.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.