Talley Construction Company, Inc.: TDOT bid record

Talley Construction Company, Inc. submitted 13 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 15 OCT 2024, and was the low bidder on 4 of them (31%). When it was not low, its total sat a median +6.0% above the low bid.

Owner
Tennessee DOT
Low bid volume
$7,747,144
Latest bid
15 OCT 2024
Data through
02 OCT 2026
13Bids
4Low bids
31Win rate, percent
+6.0%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
20184125%
20232150%
20247229%
Talley Construction Company, Inc., TDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Hamilton County200%
Hamilton And Meigs Counties200%
Hamilton200%
Bradley County11100%
Bradley And Mcminn Counties100%
Mcminn County11100%
Bradley11100%
Hamilton And Meigs100%
Polk11100%
Sequatchie100%
Talley Construction Company, Inc., TDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Mineral aggregate, type A base, grading D303-01TON115 (45%)$71.00$45.00
Acs mix(PG64-22) grading D411-01.10TON53 (60%)$168.32$171.29
Signs (construction)712-06SF112 (18%)$8.22$8.00
Flexible drums (channelizing)712-04.01EACH82 (25%)$35.65$34.50
Plastic pavement marking (turn lane arrow)716-02.06EACH82 (25%)$188.25$200.68
Bituminous material for tack coat (TC)403-01TON72 (29%)$721.05$969.62
Cold planing bituminous pavement415-01.01TON72 (29%)$35.44$34.00
Snowplowable raised pavement markers (BI-dir) (1 color)716-01.21EACH62 (33%)$48.00$40.48
Painted pavement marking (stop line)716-05.05LF62 (33%)$9.96$10.30
Plastic pavement marking (stop line)716-02.05LF91 (11%)$14.40$17.30
Enhanced flatline thermo PVMT MRKNG (6IN line)716-12.02LM81 (13%)$8,315.00$7,425.00
Removal of snowplowable reflective marker716-01.30EACH71 (14%)$13.89$12.00
Talley Construction Company, Inc., TDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Wright Brothers Construction Company, Inc.96 of 9
Rogers Group, Inc.22 of 2
Southern Constructors, Inc.11 of 1
Wright Brothers Civil Construction, LLC11 of 1
Wright Brothers Contracting, Inc.10 of 1
Summers-Taylor, Inc.10 of 1
Greenstar, LLC11 of 1
Steve Williams Construction, LLC10 of 1
Talley Construction Company, Inc., TDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
15 OCT 2024CNY309Mcminn CountyThe emergency sinkhole repairs at two locations on s.r. 39 at l.m. 4.21 of 2$1,392,945Low, 5.0% under the second
04 OCT 2024CNY261Bradley And Mcminn CountiesThe resurfacing on i-75 from north of hooper gap road nw (l.m. 15.35) in bradley county to south of county road 28 (l.m. 2.06) in mcminn cou2 of 2$7,303,229+5.0%
04 OCT 2024CNY253Hamilton And Meigs CountiesThe ada curb ramp upgrades on various state routes3 of 3$3,852,500+3.0%
10 MAY 2024CNY145Hamilton And Meigs Counties004,61s060-f8-005 the resurfacing on s.r. 60 from s.r. 58 (l.m. 0.17) to the meigs county line (l.m. 1.60) in hamilton county, and from sout3 of 3$1,256,613+6.0%
22 MAR 2024CNY095Bradley CountyThe resurfacing on u.s. 11 (s.r. 74) from north of inman street (l.m. 13.87) to north of s.r. 60 (l.m. 15.46) (includes the sb section l.m. 1 of 2$1,895,003Low, 6.0% under the second
22 MAR 2024CNY098Hamilton CountyThe resurfacing on u.s. 27 (s.r. 29) from south of old dayton pike (l.m. 25.72) to north of coulterville road (l.m. 28.32), including thin e2 of 2$2,404,520+4.0%
09 FEB 2024CNY057Hamilton CountyThe resurfacing on s.r. 58 from s.r. 153 (l.m. 4.57) to near eller road (l.m. 6.45)2 of 2$2,499,821+11%
08 DEC 2023CNX405BradleyThe resurfacing on i-75 from south of mm 18.6 (l.m. 2.99) to north of exit 20 (l.m. 5.35)1 of 2$3,587,027Low, 6.0% under the second
08 DEC 2023CNX408Hamilton And MeigsThe construction of a small drainage structure on s.r. 60 at l.m. 1.62 of 3$893,170+23%
23 MAR 2018CNS103SequatchieThe resurfacing on u.s. 127 (s.r. 8) from the hamilton county line (l.m. 0.00) to north of progress drive (l.m. 5.22)2 of 2$948,068+15%
09 FEB 2018CNS020HamiltonThe resurfacing on s.r. 111 from s.r. 29 (l.m. 0.00) to south of jones gap road (l.m. 3.65)2 of 2$2,065,619+6.0%
09 FEB 2018CNS025HamiltonThe grading, drainage and paving on s.r. 58 at the intersection of champion road (l.m. 7.03) in chattanooga2 of 3$357,445+26%
09 FEB 2018CNS021PolkThe resurfacing on u.s. 64 (s.r. 40) from west of the ocoee river recreation area, caney creek take out (l.m. 13.00) to mile post 17.0 (l.m.1 of 2$872,168Low, 30% under the second
Talley Construction Company, Inc.: latest TDOT bids in the data

How this record was read

TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

  • Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy