TDOT contract CN262056 bid tabulation
The grading, drainage, lighting, and paving on i-24 at the s.r. 50 interchange (l.m. 0.56) (exit 127). Let by Tennessee DOT on August 14, 2026, Grundy County. 5 bids received; low bid $4,498,734 by Mack Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 14 AUG 2026
- Pay items
- 109
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mack Construction, LLC | $4,498,734 | Low |
| 2 | Jones Bros. Contractors, LLC | $4,787,388 | +6.0% |
| 3 | Summers-Taylor, Inc. | $4,789,783 | +6.0% |
| 4 | Adams Contracting, LLC | $5,352,962 | +19% |
| 5 | APAC-Atlantic, Inc. | $6,137,544 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mack Construction, LLC | 2. Jones Bros. Contractors, LLC | 3. Summers-Taylor, Inc. | 4. Adams Contracting, LLC | 5. APAC-Atlantic, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $31,000 | $40,000 | $27,700 | $40,000 | $38,675 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $60,000 | $46,400 | $75,000 | $75,000 | $93,750 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $6,100.00 | $10,000 | $9,000.00 | $20,000 | $9,875.30 |
| 4 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 331 | $20.00 | $24.00 | $49.00 | $35.00 | $83.51 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 3,255 | $16.50 | $70.00 | $43.00 | $40.00 | $70.63 |
| 6 | Borrow excavation (graded solid rock) (203-02.01) | TON | 900 | $38.00 | $55.00 | $56.00 | $50.00 | $56.67 |
| 7 | Borrow excavation (unclassified) (203-03) | CY | 3,839 | $50.00 | $68.00 | $47.00 | $60.00 | $58.26 |
| 8 | Placing and spreading topsoil (203-04) | CY | 1,000 | $16.00 | $42.00 | $32.00 | $25.00 | $45.96 |
| 9 | Undercutting (203-05) | CY | 435 | $25.00 | $50.00 | $45.00 | $65.00 | $92.76 |
| 10 | Water (203-06) | MG | 31 | $30.00 | $60.00 | $20.00 | $110.00 | $24.55 |
| 11 | Furnishing & spreading topsoil (203-07) | CY | 868 | $74.00 | $45.00 | $52.00 | $85.00 | $88.59 |
| 12 | Sediment removal (209-05) | CY | 170 | $40.00 | $35.00 | $50.00 | $15.00 | $62.97 |
| 13 | Temporary silt fence (with backing) (209-08.02) | LF | 3,200 | $5.25 | $4.50 | $5.00 | $5.50 | $6.88 |
| 14 | Temporary silt fence (without backing) (209-08.03) | LF | 3,060 | $2.25 | $1.75 | $2.00 | $3.50 | $2.63 |
| 15 | Enhanced rock check dam (209-08.08) | EACH | 4 | $775.00 | $2,200.00 | $1,250.00 | $875.00 | $1,062.50 |
| 16 | Filter sock check dam (209-08.09) | EACH | 9 | $250.00 | $245.00 | $275.00 | $225.00 | $500.00 |
| 17 | Sandbags (209-09.01) | BAG | 4,100 | $6.25 | $14.00 | $7.00 | $10.00 | $8.75 |
| 18 | Sediment filter bag(15' X 10') (209-09.04) | EACH | 1 | $400.00 | $200.00 | $1,500.00 | $1,100.00 | $250.00 |
| 19 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 220 | $3.00 | $10.77 | $4.50 | $5.00 | $1.25 |
| 20 | Catch basin protection (type D) (209-40.33) | EACH | 2 | $150.00 | $225.00 | $250.00 | $400.00 | $500.00 |
| 21 | Mineral aggregate, type A base, grading D (303-01) | TON | 8,437 | $50.00 | $50.00 | $48.00 | $50.00 | $33.67 |
| 22 | Mineral aggregate (size 57) (303-10.01) | TON | 64 | $56.00 | $70.00 | $55.00 | $70.00 | $42.75 |
| 23 | Mineral aggregate (size 4) (303-10.07) | TON | 111 | $45.00 | $70.00 | $54.50 | $70.00 | $42.76 |
| 24 | Asp. conc. mix(PG76-22) (BPMB-HM) GR. A-S (307-01.22) | TON | 1,008 | $175.00 | $161.80 | $180.00 | $170.00 | $202.25 |
| 25 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading A (307-03.01) | TON | 1,045 | $165.00 | $170.00 | $189.00 | $160.00 | $212.50 |
| 26 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 654 | $205.00 | $188.15 | $209.00 | $200.00 | $235.19 |
| 27 | Treated permeable base (313-03) | SY | 208 | $65.00 | $150.50 | $167.00 | $60.00 | $188.13 |
| 28 | Bituminous material for tack coat (TC) (403-01) | TON | 10 | $1,100.00 | $1,560.00 | $1,732.00 | $1,000.00 | $1,950.00 |
| 29 | Saw cutting asphalt pavement (407-20.05) | LF | 10,133 | $3.25 | $1.50 | $3.00 | $4.50 | $12.50 |
| 30 | Acs mix(PG76-22) grading D (411-03.10) | TON | 1,300 | $210.00 | $201.25 | $223.50 | $210.00 | $251.56 |
| 31 | Cold planing bituminous pavement (415-01.02) | SY | 13,385 | $6.00 | $4.00 | $8.50 | $6.00 | $9.50 |
| 32 | Portland cement concrete pavement (plain) 10" (501-01.03) | SY | 187 | $385.00 | $350.00 | $380.00 | $450.00 | $450.00 |
| 33 | Sawing concrete pavement (full depth) (502-04.01) | LF | 176 | $25.00 | $10.00 | $4.00 | $15.00 | $12.50 |
| 34 | Scarifying (604-10.51) | SY | 1,090 | $10.00 | $22.00 | $17.50 | $15.00 | $3.01 |
| 35 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 18 | $155.00 | $360.00 | $300.00 | $335.00 | $907.33 |
| 36 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 13 | $200.00 | $450.00 | $360.00 | $475.00 | $957.42 |
| 37 | 48" concrete pipe culvert (class III) (607-09.02) | LF | 39 | $320.00 | $460.00 | $409.00 | $480.00 | $740.05 |
| 38 | 24IN endwall (cross drain) 4:1 (611-07.58) | EACH | 1 | $5,100.00 | $6,300.00 | $5,100.00 | $5,800.00 | $3,197.70 |
| 39 | 30IN endwall (cross drain) 4:1 (611-07.61) | EACH | 1 | $7,600.00 | $8,000.00 | $9,650.00 | $8,200.00 | $8,536.76 |
| 40 | 48IN endwall (cross drain) 3:1 (611-07.69) | EACH | 1 | $13,000 | $11,000 | $10,200 | $11,500 | $23,544 |
| 41 | 48IN endwall (cross drain) 4:1 (611-07.70) | EACH | 1 | $15,000 | $15,000 | $12,330 | $13,000 | $23,544 |
| 42 | 24" temporary drainage pipe (621-03.03) | LF | 250 | $57.00 | $70.00 | $115.00 | $100.00 | $79.19 |
| 43 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 1 | $1,400.00 | $1,500.00 | $1,220.00 | $1,160.00 | $1,375.00 |
| 44 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 612.50 | $29.00 | $27.00 | $30.00 | $28.00 | $33.75 |
| 45 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $1,550.00 | $1,450.00 | $1,610.00 | $1,530.00 | $1,812.50 |
| 46 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 1 | $3,675.00 | $3,400.00 | $3,775.00 | $3,570.00 | $4,250.00 |
| 47 | Guardrail removed (706-01) | LF | 276 | $1.50 | $1.00 | $2.00 | $1.10 | $1.25 |
| 48 | High-visibility construction fence (707-08.11) | LF | 3,650 | $3.00 | $1.75 | $2.00 | $2.70 | $3.31 |
| 49 | Machined rip-rap (class A-3) (709-05.05) | TON | 260 | $55.00 | $62.00 | $61.25 | $77.00 | $79.03 |
| 50 | Machined rip-rap (class B) (709-05.08) | TON | 25 | $55.00 | $60.00 | $67.00 | $78.00 | $79.03 |
| 51 | Machined rip-rap (class C) (709-05.09) | TON | 217 | $55.00 | $60.00 | $67.00 | $80.00 | $79.03 |
| 52 | Traffic control (712-01) | LS | 1 | $235,000 | $55,000 | $45,000 | $585,000 | $21,875 |
| 53 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 7,250 | $48.00 | $55.00 | $51.50 | $45.00 | $88.56 |
| 54 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 6 | $6,500.00 | $6,500.00 | $7,215.00 | $6,830.00 | $8,125.00 |
| 55 | Flexible drums (channelizing) (712-04.01) | EACH | 306 | $27.00 | $30.00 | $33.50 | $35.00 | $37.50 |
| 56 | Barrier rail delineator (712-04.50) | EACH | 363 | $14.00 | $12.00 | $13.50 | $13.00 | $15.00 |
| 57 | Warning lights (type A) (712-05.01) | EACH | 24 | $22.00 | $18.00 | $20.00 | $19.00 | $22.50 |
| 58 | Warning lights (type C) (712-05.03) | EACH | 306 | $22.00 | $18.00 | $20.00 | $19.00 | $22.50 |
| 59 | Signs (construction) (712-06) | SF | 615 | $8.00 | $6.50 | $7.25 | $7.00 | $8.13 |
| 60 | Signs (construction)(reduced speed warning) (712-06.16) | EACH | 4 | $190.00 | $500.00 | $555.00 | $600.00 | $625.00 |
| 61 | Temporary barricades (type III) (712-07.03) | LF | 144 | $26.00 | $17.50 | $19.50 | $20.00 | $21.88 |
| 62 | Arrow board (type C) (712-08.03) | EACH | 6 | $1,100.00 | $800.00 | $890.00 | $1,000.00 | $1,000.00 |
| 63 | Queue protection truck (712-08.11) | HR | 150 | $155.00 | $110.00 | $122.00 | $150.00 | $137.50 |
| 64 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 2,080 | $4.00 | $3.45 | $4.00 | $3.70 | $4.31 |
| 65 | Removable pavement marking (6" line) (712-09.08) | LF | 2,105 | $3.25 | $2.95 | $3.50 | $3.10 | $3.69 |
| 66 | Removal of signs, posts and footings (713-15) | LS | 1 | $135.00 | $100.00 | $833.00 | $105.00 | $125.00 |
| 67 | Removal & relocation of sign & support (713-15.02) | EACH | 7 | $135.00 | $2,000.00 | $333.00 | $2,100.00 | $2,500.00 |
| 68 | Changeable message sign unit (713-16.01) | EACH | 4 | $6,000.00 | $6,000.00 | $6,662.00 | $6,300.00 | $7,500.00 |
| 69 | Signs (R3-2) (713-16.20) | EACH | 1 | $265.00 | $150.00 | $390.00 | $158.00 | $187.50 |
| 70 | Signs (R3-1) (713-16.21) | EACH | 1 | $265.00 | $150.00 | $390.00 | $158.00 | $187.50 |
| 71 | Reset ground mounted sign (713-16.90) | EACH | 4 | $535.00 | $2,000.00 | $316.50 | $2,100.00 | $2,500.00 |
| 72 | Conduit (structures - 2" RGS) (714-04.02) | LF | 250 | $35.00 | $32.10 | $34.50 | $33.75 | $99.38 |
| 73 | Conduit (3" PVC jack/bore SCH 80) (714-04.04) | LF | 730 | $24.00 | $22.29 | $24.00 | $23.50 | $40.00 |
| 74 | Conduit (2" PVC) (714-04.05) | LF | 12,195 | $16.00 | $14.50 | $15.60 | $15.25 | $18.75 |
| 75 | Pull boxes (type C) (714-05.04) | EACH | 15 | $1,600.00 | $1,500.00 | $1,614.00 | $1,580.00 | $1,500.00 |
| 76 | Cable (1/C # 6 AWG) (714-06.05) | LF | 51,070 | $2.00 | $1.72 | $1.85 | $1.90 | $3.25 |
| 77 | Light standards (aluminum, 40') (714-08.09) | EACH | 32 | $4,800.00 | $4,500.00 | $4,840.00 | $4,730.00 | $7,557.50 |
| 78 | Light standards (120' highmast) (714-08.10) | EACH | 8 | $55,000 | $51,300 | $58,100 | $53,870 | $73,970 |
| 79 | Foundation (only) for light standards (714-08.23) | EACH | 32 | $2,650.00 | $2,500.00 | $2,689.00 | $2,630.00 | $2,482.50 |
| 80 | Foundation (only) for high mast light standard (714-08.47) | EACH | 8 | $10,600 | $10,000 | $10,755 | $10,500 | $32,925 |
| 81 | LED luminaires (182 watt) (714-09.47) | EACH | 32 | $1,060.00 | $1,000.00 | $1,075.50 | $1,050.00 | $940.00 |
| 82 | LED luminaires-high mast (195 watt) (714-09.64) | EACH | 48 | $1,275.00 | $1,200.00 | $1,290.00 | $1,260.00 | $1,550.00 |
| 83 | LED luminaires-underpass (52 watt) (714-09.83) | EACH | 4 | $905.00 | $850.00 | $914.00 | $893.00 | $1,225.00 |
| 84 | Control center (no. 1) (714-12.01) | LS | 1 | $21,400 | $20,148 | $21,668 | $21,160 | $27,613 |
| 85 | Control center (no. 2) (714-12.02) | LS | 1 | $21,400 | $20,148 | $21,668 | $21,160 | $27,613 |
| 86 | Electrical connection (no.1) (714-25.01) | LS | 1 | $3,800.00 | $3,500.00 | $3,764.00 | $3,680.00 | $10,125 |
| 87 | Electrical connection (no.2) (714-25.02) | LS | 1 | $3,800.00 | $3,500.00 | $3,764.00 | $3,680.00 | $10,125 |
| 88 | #6 AWG ground wire bare solid copper (714-70.56) | LF | 13,175 | $2.00 | $1.72 | $1.85 | $1.90 | $3.13 |
| 89 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 240 | $43.00 | $40.50 | $45.00 | $42.75 | $50.63 |
| 90 | Removal of snowplowable reflective marker (716-01.30) | EACH | 66 | $16.00 | $15.00 | $16.65 | $15.75 | $18.75 |
| 91 | Plastic pavement marking (stop line) (716-02.05) | LF | 54 | $14.00 | $12.50 | $13.90 | $13.25 | $15.63 |
| 92 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 2 | $190.00 | $175.00 | $194.50 | $184.00 | $218.75 |
| 93 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 858 | $13.00 | $12.00 | $13.50 | $12.75 | $15.00 |
| 94 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.53 | $10,100 | $9,500.00 | $10,550 | $9,980.00 | $11,875 |
| 95 | Plastic pavement marking (wrong way arrow) (716-04.06) | EACH | 4 | $265.00 | $250.00 | $280.00 | $263.00 | $312.50 |
| 96 | Hydroblast removal of pavement marking (line) (716-08.30) | LM | 0.36 | $8,000.00 | $7,500.00 | $8,330.00 | $7,880.00 | $9,375.00 |
| 97 | Contrast pavement marking 6" (716-09.83) | LF | 1,200 | $10.00 | $9.50 | $11.00 | $10.00 | $11.88 |
| 98 | Contrast pavement marking 6" dotted (716-09.90) | LF | 400 | $10.00 | $9.50 | $11.00 | $10.00 | $11.88 |
| 99 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 2.20 | $7,500.00 | $7,000.00 | $7,775.00 | $7,350.00 | $8,750.00 |
| 100 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 5,307 | $1.35 | $1.25 | $1.40 | $1.40 | $1.56 |
| 101 | Mobilization (717-01) | LS | 1 | $215,000 | $461,500 | $401,366 | $475,000 | $462,836 |
| 102 | Geotextile (type III)(erosion control) (740-10.03) | SY | 670 | $3.20 | $6.00 | $6.00 | $2.50 | $3.06 |
| 103 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 870 | $5.50 | $9.00 | $7.85 | $4.20 | $5.44 |
| 104 | Temporary sediment tube 12IN (740-11.02) | LF | 1,250 | $3.50 | $3.25 | $3.75 | $4.00 | $3.75 |
| 105 | Temporary seeding (with mulch) (801-01.07) | UNIT | 200 | $48.00 | $29.50 | $32.75 | $50.00 | $43.75 |
| 106 | Special wetland seed mixture (801-01.36) | UNIT | 26 | $300.00 | $100.00 | $111.00 | $40.00 | $425.00 |
| 107 | Water (seeding & sodding) (801-03) | MG | 135 | $75.00 | $100.00 | $83.25 | $110.00 | $93.75 |
| 108 | Sodding (new sod) (803-01) | SY | 11,090 | $6.50 | $6.00 | $6.75 | $7.00 | $6.94 |
| 109 | Erosion control blanket (type II) (805-12.02) | SY | 2,900 | $1.10 | $1.25 | $1.40 | $1.25 | $1.31 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.