TDOT contract CN262056 bid tabulation

The grading, drainage, lighting, and paving on i-24 at the s.r. 50 interchange (l.m. 0.56) (exit 127). Let by Tennessee DOT on August 14, 2026, Grundy County. 5 bids received; low bid $4,498,734 by Mack Construction, LLC.

Owner
Tennessee DOT
Letting
14 AUG 2026
Pay items
109
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Mack Construction, LLC$4,498,734Low
2Jones Bros. Contractors, LLC$4,787,388+6.0%
3Summers-Taylor, Inc.$4,789,783+6.0%
4Adams Contracting, LLC$5,352,962+19%
5APAC-Atlantic, Inc.$6,137,544+36%
TDOT contract CN262056: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Mack Construction, LLC2. Jones Bros. Contractors, LLC3. Summers-Taylor, Inc.4. Adams Contracting, LLC5. APAC-Atlantic, Inc.
1Construction stakes, lines and grades (105-01)LS1$31,000$40,000$27,700$40,000$38,675
2Clearing and grubbing (201-01)LS1$60,000$46,400$75,000$75,000$93,750
3Removal of structures and obstructions (202-01)LS1$6,100.00$10,000$9,000.00$20,000$9,875.30
4Removal of rigid pavement, sidewalk, etc. (202-03)SY331$20.00$24.00$49.00$35.00$83.51
5Road & drainage excavation (unclassified) (203-01)CY3,255$16.50$70.00$43.00$40.00$70.63
6Borrow excavation (graded solid rock) (203-02.01)TON900$38.00$55.00$56.00$50.00$56.67
7Borrow excavation (unclassified) (203-03)CY3,839$50.00$68.00$47.00$60.00$58.26
8Placing and spreading topsoil (203-04)CY1,000$16.00$42.00$32.00$25.00$45.96
9Undercutting (203-05)CY435$25.00$50.00$45.00$65.00$92.76
10Water (203-06)MG31$30.00$60.00$20.00$110.00$24.55
11Furnishing & spreading topsoil (203-07)CY868$74.00$45.00$52.00$85.00$88.59
12Sediment removal (209-05)CY170$40.00$35.00$50.00$15.00$62.97
13Temporary silt fence (with backing) (209-08.02)LF3,200$5.25$4.50$5.00$5.50$6.88
14Temporary silt fence (without backing) (209-08.03)LF3,060$2.25$1.75$2.00$3.50$2.63
15Enhanced rock check dam (209-08.08)EACH4$775.00$2,200.00$1,250.00$875.00$1,062.50
16Filter sock check dam (209-08.09)EACH9$250.00$245.00$275.00$225.00$500.00
17Sandbags (209-09.01)BAG4,100$6.25$14.00$7.00$10.00$8.75
18Sediment filter bag(15' X 10') (209-09.04)EACH1$400.00$200.00$1,500.00$1,100.00$250.00
19Polyethylene sheeting (6 mil. minimum) (209-20.03)SY220$3.00$10.77$4.50$5.00$1.25
20Catch basin protection (type D) (209-40.33)EACH2$150.00$225.00$250.00$400.00$500.00
21Mineral aggregate, type A base, grading D (303-01)TON8,437$50.00$50.00$48.00$50.00$33.67
22Mineral aggregate (size 57) (303-10.01)TON64$56.00$70.00$55.00$70.00$42.75
23Mineral aggregate (size 4) (303-10.07)TON111$45.00$70.00$54.50$70.00$42.76
24Asp. conc. mix(PG76-22) (BPMB-HM) GR. A-S (307-01.22)TON1,008$175.00$161.80$180.00$170.00$202.25
25Asphalt concrete mix (PG76-22) (BPMB-HM) grading A (307-03.01)TON1,045$165.00$170.00$189.00$160.00$212.50
26Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08)TON654$205.00$188.15$209.00$200.00$235.19
27Treated permeable base (313-03)SY208$65.00$150.50$167.00$60.00$188.13
28Bituminous material for tack coat (TC) (403-01)TON10$1,100.00$1,560.00$1,732.00$1,000.00$1,950.00
29Saw cutting asphalt pavement (407-20.05)LF10,133$3.25$1.50$3.00$4.50$12.50
30Acs mix(PG76-22) grading D (411-03.10)TON1,300$210.00$201.25$223.50$210.00$251.56
31Cold planing bituminous pavement (415-01.02)SY13,385$6.00$4.00$8.50$6.00$9.50
32Portland cement concrete pavement (plain) 10" (501-01.03)SY187$385.00$350.00$380.00$450.00$450.00
33Sawing concrete pavement (full depth) (502-04.01)LF176$25.00$10.00$4.00$15.00$12.50
34Scarifying (604-10.51)SY1,090$10.00$22.00$17.50$15.00$3.01
3524" concrete pipe culvert (class III) (607-05.02)LF18$155.00$360.00$300.00$335.00$907.33
3630" concrete pipe culvert (class III) (607-06.02)LF13$200.00$450.00$360.00$475.00$957.42
3748" concrete pipe culvert (class III) (607-09.02)LF39$320.00$460.00$409.00$480.00$740.05
3824IN endwall (cross drain) 4:1 (611-07.58)EACH1$5,100.00$6,300.00$5,100.00$5,800.00$3,197.70
3930IN endwall (cross drain) 4:1 (611-07.61)EACH1$7,600.00$8,000.00$9,650.00$8,200.00$8,536.76
4048IN endwall (cross drain) 3:1 (611-07.69)EACH1$13,000$11,000$10,200$11,500$23,544
4148IN endwall (cross drain) 4:1 (611-07.70)EACH1$15,000$15,000$12,330$13,000$23,544
4224" temporary drainage pipe (621-03.03)LF250$57.00$70.00$115.00$100.00$79.19
43Earth pad for type 38 GR end treatment (705-04.09)EACH1$1,400.00$1,500.00$1,220.00$1,160.00$1,375.00
44W beam GR (type 2) MASH TL-3 (long post) (705-06.02)LF612.50$29.00$27.00$30.00$28.00$33.75
45GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH1$1,550.00$1,450.00$1,610.00$1,530.00$1,812.50
46Tangent energy absorbing term MASH TL-3 (705-06.20)EACH1$3,675.00$3,400.00$3,775.00$3,570.00$4,250.00
47Guardrail removed (706-01)LF276$1.50$1.00$2.00$1.10$1.25
48High-visibility construction fence (707-08.11)LF3,650$3.00$1.75$2.00$2.70$3.31
49Machined rip-rap (class A-3) (709-05.05)TON260$55.00$62.00$61.25$77.00$79.03
50Machined rip-rap (class B) (709-05.08)TON25$55.00$60.00$67.00$78.00$79.03
51Machined rip-rap (class C) (709-05.09)TON217$55.00$60.00$67.00$80.00$79.03
52Traffic control (712-01)LS1$235,000$55,000$45,000$585,000$21,875
53Portable barrier rail (MASH TL-3) (712-02.10)LF7,250$48.00$55.00$51.50$45.00$88.56
54Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH6$6,500.00$6,500.00$7,215.00$6,830.00$8,125.00
55Flexible drums (channelizing) (712-04.01)EACH306$27.00$30.00$33.50$35.00$37.50
56Barrier rail delineator (712-04.50)EACH363$14.00$12.00$13.50$13.00$15.00
57Warning lights (type A) (712-05.01)EACH24$22.00$18.00$20.00$19.00$22.50
58Warning lights (type C) (712-05.03)EACH306$22.00$18.00$20.00$19.00$22.50
59Signs (construction) (712-06)SF615$8.00$6.50$7.25$7.00$8.13
60Signs (construction)(reduced speed warning) (712-06.16)EACH4$190.00$500.00$555.00$600.00$625.00
61Temporary barricades (type III) (712-07.03)LF144$26.00$17.50$19.50$20.00$21.88
62Arrow board (type C) (712-08.03)EACH6$1,100.00$800.00$890.00$1,000.00$1,000.00
63Queue protection truck (712-08.11)HR150$155.00$110.00$122.00$150.00$137.50
64Removable pavement marking (8" barrier line) (712-09.02)LF2,080$4.00$3.45$4.00$3.70$4.31
65Removable pavement marking (6" line) (712-09.08)LF2,105$3.25$2.95$3.50$3.10$3.69
66Removal of signs, posts and footings (713-15)LS1$135.00$100.00$833.00$105.00$125.00
67Removal & relocation of sign & support (713-15.02)EACH7$135.00$2,000.00$333.00$2,100.00$2,500.00
68Changeable message sign unit (713-16.01)EACH4$6,000.00$6,000.00$6,662.00$6,300.00$7,500.00
69Signs (R3-2) (713-16.20)EACH1$265.00$150.00$390.00$158.00$187.50
70Signs (R3-1) (713-16.21)EACH1$265.00$150.00$390.00$158.00$187.50
71Reset ground mounted sign (713-16.90)EACH4$535.00$2,000.00$316.50$2,100.00$2,500.00
72Conduit (structures - 2" RGS) (714-04.02)LF250$35.00$32.10$34.50$33.75$99.38
73Conduit (3" PVC jack/bore SCH 80) (714-04.04)LF730$24.00$22.29$24.00$23.50$40.00
74Conduit (2" PVC) (714-04.05)LF12,195$16.00$14.50$15.60$15.25$18.75
75Pull boxes (type C) (714-05.04)EACH15$1,600.00$1,500.00$1,614.00$1,580.00$1,500.00
76Cable (1/C # 6 AWG) (714-06.05)LF51,070$2.00$1.72$1.85$1.90$3.25
77Light standards (aluminum, 40') (714-08.09)EACH32$4,800.00$4,500.00$4,840.00$4,730.00$7,557.50
78Light standards (120' highmast) (714-08.10)EACH8$55,000$51,300$58,100$53,870$73,970
79Foundation (only) for light standards (714-08.23)EACH32$2,650.00$2,500.00$2,689.00$2,630.00$2,482.50
80Foundation (only) for high mast light standard (714-08.47)EACH8$10,600$10,000$10,755$10,500$32,925
81LED luminaires (182 watt) (714-09.47)EACH32$1,060.00$1,000.00$1,075.50$1,050.00$940.00
82LED luminaires-high mast (195 watt) (714-09.64)EACH48$1,275.00$1,200.00$1,290.00$1,260.00$1,550.00
83LED luminaires-underpass (52 watt) (714-09.83)EACH4$905.00$850.00$914.00$893.00$1,225.00
84Control center (no. 1) (714-12.01)LS1$21,400$20,148$21,668$21,160$27,613
85Control center (no. 2) (714-12.02)LS1$21,400$20,148$21,668$21,160$27,613
86Electrical connection (no.1) (714-25.01)LS1$3,800.00$3,500.00$3,764.00$3,680.00$10,125
87Electrical connection (no.2) (714-25.02)LS1$3,800.00$3,500.00$3,764.00$3,680.00$10,125
88#6 AWG ground wire bare solid copper (714-70.56)LF13,175$2.00$1.72$1.85$1.90$3.13
89Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH240$43.00$40.50$45.00$42.75$50.63
90Removal of snowplowable reflective marker (716-01.30)EACH66$16.00$15.00$16.65$15.75$18.75
91Plastic pavement marking (stop line) (716-02.05)LF54$14.00$12.50$13.90$13.25$15.63
92Plastic pavement marking (turn lane arrow) (716-02.06)EACH2$190.00$175.00$194.50$184.00$218.75
93Plastic pavement marking (24" barrier line) (716-02.07)LF858$13.00$12.00$13.50$12.75$15.00
94Plastic pavement marking (8IN line) (716-02.12)LM0.53$10,100$9,500.00$10,550$9,980.00$11,875
95Plastic pavement marking (wrong way arrow) (716-04.06)EACH4$265.00$250.00$280.00$263.00$312.50
96Hydroblast removal of pavement marking (line) (716-08.30)LM0.36$8,000.00$7,500.00$8,330.00$7,880.00$9,375.00
97Contrast pavement marking 6" (716-09.83)LF1,200$10.00$9.50$11.00$10.00$11.88
98Contrast pavement marking 6" dotted (716-09.90)LF400$10.00$9.50$11.00$10.00$11.88
99Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM2.20$7,500.00$7,000.00$7,775.00$7,350.00$8,750.00
100Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF5,307$1.35$1.25$1.40$1.40$1.56
101Mobilization (717-01)LS1$215,000$461,500$401,366$475,000$462,836
102Geotextile (type III)(erosion control) (740-10.03)SY670$3.20$6.00$6.00$2.50$3.06
103Geotextile (type IV)(stabilization) (740-10.04)SY870$5.50$9.00$7.85$4.20$5.44
104Temporary sediment tube 12IN (740-11.02)LF1,250$3.50$3.25$3.75$4.00$3.75
105Temporary seeding (with mulch) (801-01.07)UNIT200$48.00$29.50$32.75$50.00$43.75
106Special wetland seed mixture (801-01.36)UNIT26$300.00$100.00$111.00$40.00$425.00
107Water (seeding & sodding) (801-03)MG135$75.00$100.00$83.25$110.00$93.75
108Sodding (new sod) (803-01)SY11,090$6.50$6.00$6.75$7.00$6.94
109Erosion control blanket (type II) (805-12.02)SY2,900$1.10$1.25$1.40$1.25$1.31
TDOT contract CN262056: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of August 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy