TDOT contract CN261055 bid tabulation

The resurfacing (microsurface or thin mix overlay) on s.r. 70 from near s.r. 94 (l.m. 12.62) to the hancock county line (l.m. 22.17). Let by Tennessee DOT on June 26, 2026, Hawkins County. 2 bids received; low bid $1,887,200 by Summers-Taylor, Inc..

Owner
Tennessee DOT
Letting
26 JUN 2026
Pay items
20
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Summers-Taylor, Inc.$1,887,200Low
2APAC-Atlantic, Inc.$2,046,022+8.0%
TDOT contract CN261055: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Summers-Taylor, Inc.2. APAC-Atlantic, Inc.
1Brooming & degrassing shoulders (208-01.05)LM20$1,850.00$685.00
2Guardrail transition 27IN to 31IN (705-02.10)EACH6$84.00$84.00
3Earth pad for guard rail end treatment (705-04.10)EACH6$950.00$950.00
4GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH6$3,600.00$3,700.00
5Guardrail removed (706-01)LF132$4.75$5.00
6Traffic control (712-01)LS1$39,000$80,000
7Signs (construction) (712-06)SF730$10.00$11.50
8Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH630$38.00$45.00
9Removal of snowplowable reflective marker (716-01.30)EACH630$7.50$8.00
10Plastic pavement marking(channelization striping) (716-02.04)SY1,500$22.00$25.00
11Plastic pavement marking (stop line) (716-02.05)LF120$10.00$12.00
12Plastic pavement marking (turn lane arrow) (716-02.06)EACH3$175.00$250.00
13Painted pavement marking (6" line) (716-05.20)LM77$1,150.00$1,100.00
14Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM39$3,150.00$3,595.00
15Spray thermo PVMT MRKNG (60 mil) (6IN dotted line) (716-13.05)LF180$0.80$1.25
16Mobilization (717-01)LS1$42,011$92,000
17Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON1,496$187.00$178.50
18Bituminous material for tack coat (TC) (403-01)TON97$1,002.00$800.00
19Acs mix(PG64-22) thin lift D asphalt (411-03.12)TON5,982$179.00$193.50
20Cold planing bituminous pavement (415-01.02)SY225$48.00$100.00
TDOT contract CN261055: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy