TDOT contract CN261044 bid tabulation
The grading, drainage, signals and paving on s.r. 322 from sheppard road (l.m. 13.34) to s.r. 72 (l.m. 15.53). Let by Tennessee DOT on June 26, 2026, Monroe County. 6 bids received; low bid $21,113,715 by Charles Blalock & Sons, Inc..
- Owner
- Tennessee DOT
- Letting
- 26 JUN 2026
- Pay items
- 348
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Charles Blalock & Sons, Inc. | $21,113,715 | Low |
| 2 | Jones Bros. Contractors, LLC | $22,223,900 | +5.0% |
| 3 | Cleary Construction, Inc. | $24,634,446 | +17% |
| 4 | Summers-Taylor, Inc. | $25,095,415 | +19% |
| 5 | APAC-Atlantic, Inc. | $25,996,175 | +23% |
| 6 | Wright Brothers Civil Construction, LLC | $27,098,501 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Charles Blalock & Sons, Inc. | 2. Jones Bros. Contractors, LLC | 3. Cleary Construction, Inc. | 4. Summers-Taylor, Inc. | 5. APAC-Atlantic, Inc. | 6. Wright Brothers Civil Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $155,663 | $199,637 | $390,000 | $176,036 | $159,658 | $167,000 |
| 2 | Trainee (109-10.01) | HR | 4,120 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $400,000 | $1,074,000 | $900,000 | $127,349 | $309,894 | $450,000 |
| 4 | Removal of pipe (18" ,sta. 607+90) (202-02.01) | LF | 312 | $24.14 | $35.00 | $15.50 | $27.36 | $52.38 | $25.00 |
| 5 | Removal of buildings (tract no. 1) (202-06.01) | LS | 1 | $500.00 | $100.00 | $700.00 | $596.75 | $787.50 | $810.00 |
| 6 | Removal of buildings (tract no. 3) (202-06.02) | LS | 1 | $500.00 | $100.00 | $700.00 | $596.75 | $682.50 | $705.00 |
| 7 | Removal of buildings (tract no. 8,11,12) (202-06.03) | LS | 1 | $500.00 | $100.00 | $50,000 | $29,838 | $30,135 | $64,650 |
| 8 | Removal of buildings (tract no. 10) (202-06.04) | LS | 1 | $500.00 | $100.00 | $2,600.00 | $4,774.09 | $4,200.00 | $4,325.00 |
| 9 | Removal of buildings (tract no. 14) (202-06.05) | LS | 1 | $500.00 | $100.00 | $700.00 | $1,193.53 | $1,050.00 | $1,075.00 |
| 10 | Removal of buildings (tract no. 18) (202-06.06) | LS | 1 | $500.00 | $100.00 | $2,600.00 | $2,983.80 | $1,312.50 | $1,350.00 |
| 11 | Removal of buildings (tract no. 19) (202-06.07) | LS | 1 | $500.00 | $100.00 | $700.00 | $596.75 | $787.50 | $800.00 |
| 12 | Removal of buildings (tract no.20) (202-06.08) | LS | 1 | $500.00 | $100.00 | $700.00 | $1,193.53 | $787.50 | $800.00 |
| 13 | Removal of buildings (tract no. 21,23) (202-06.09) | LS | 1 | $500.00 | $100.00 | $14,000 | $17,903 | $14,700 | $24,800 |
| 14 | Removal of buildings (tract no. 22) (202-06.10) | LS | 1 | $500.00 | $100.00 | $2,600.00 | $2,983.80 | $1,575.00 | $1,620.00 |
| 15 | Removal of buildings (tract no. 24) (202-06.11) | LS | 1 | $500.00 | $100.00 | $18,500 | $17,903 | $14,700 | $17,225 |
| 16 | Removal of buildings (tract no. 26) (202-06.12) | LS | 1 | $500.00 | $100.00 | $7,000.00 | $8,951.41 | $5,250.00 | $6,880.00 |
| 17 | Removal of buildings (tract no. 30) (202-06.13) | LS | 1 | $500.00 | $100.00 | $28,500 | $11,935 | $23,415 | $22,650 |
| 18 | Removal of buildings (tract no. 33) (202-06.14) | LS | 1 | $500.00 | $100.00 | $8,700.00 | $11,935 | $14,175 | $14,600 |
| 19 | Removal of buildings (tract no. 34) (202-06.15) | LS | 1 | $500.00 | $100.00 | $5,300.00 | $11,935 | $14,175 | $14,800 |
| 20 | Removal of buildings (tract no. 35) (202-06.16) | LS | 1 | $500.00 | $100.00 | $11,250 | $11,935 | $15,750 | $16,250 |
| 21 | Removal of buildings (tract no. 37) (202-06.17) | LS | 1 | $500.00 | $100.00 | $26,500 | $17,903 | $31,710 | $25,000 |
| 22 | Removal of buildings (tract no. 41) (202-06.18) | LS | 1 | $500.00 | $100.00 | $700.00 | $596.75 | $630.00 | $650.00 |
| 23 | Removal of buildings (tract no. 43) (202-06.19) | LS | 1 | $500.00 | $100.00 | $700.00 | $1,193.53 | $787.50 | $800.00 |
| 24 | Removal of buildings (tract no. 45) (202-06.20) | LS | 1 | $500.00 | $100.00 | $8,700.00 | $8,951.41 | $2,100.00 | $2,150.00 |
| 25 | Removal of buildings (tract no. 48) (202-06.21) | LS | 1 | $500.00 | $100.00 | $11,250 | $11,935 | $15,225 | $15,700 |
| 26 | Removal of buildings (tract no. 50) (202-06.22) | LS | 1 | $500.00 | $100.00 | $7,850.00 | $8,951.41 | $8,400.00 | $8,650.00 |
| 27 | Removal of buildings (tract no. 52) (202-06.23) | LS | 1 | $500.00 | $100.00 | $2,600.00 | $5,967.61 | $1,890.00 | $2,600.00 |
| 28 | Removal of buildings (tract no. 54) (202-06.24) | LS | 1 | $500.00 | $100.00 | $700.00 | $596.75 | $630.00 | $650.00 |
| 29 | Removal of buildings (tract no. 55) (202-06.25) | LS | 1 | $500.00 | $100.00 | $700.00 | $1,790.28 | $2,100.00 | $2,150.00 |
| 30 | Removal of buildings (tract no. 57) (202-06.26) | LS | 1 | $500.00 | $100.00 | $38,000 | $29,838 | $31,500 | $32,400 |
| 31 | Removal of buildings (tract no. 58) (202-06.27) | LS | 1 | $500.00 | $100.00 | $700.00 | $1,193.53 | $2,625.00 | $2,700.00 |
| 32 | Removal of buildings (tract no. 59) (202-06.28) | LS | 1 | $500.00 | $100.00 | $11,285 | $11,935 | $13,125 | $13,550 |
| 33 | Removal of buildings (tract no. 60) (202-06.29) | LS | 1 | $500.00 | $100.00 | $700.00 | $1,193.53 | $1,050.00 | $1,075.00 |
| 34 | Removal of buildings (tract no. 61) (202-06.30) | LS | 1 | $500.00 | $100.00 | $5,250.00 | $5,967.61 | $2,625.00 | $2,750.00 |
| 35 | Removal of buildings (tract no. 83) (202-06.31) | LS | 1 | $500.00 | $100.00 | $700.00 | $1,193.53 | $1,575.00 | $1,600.00 |
| 36 | Removal of buildings (tract no. 85) (202-06.32) | LS | 1 | $500.00 | $100.00 | $2,600.00 | $4,774.09 | $3,150.00 | $3,200.00 |
| 37 | Road & drainage excavation (unclassified) (203-01) | CY | 237,722 | $6.43 | $9.20 | $8.95 | $16.58 | $11.92 | $11.90 |
| 38 | Borrow excavation (graded solid rock) (203-02.01) | TON | 5,729 | $39.00 | $44.00 | $46.10 | $77.41 | $46.84 | $48.50 |
| 39 | Placing and spreading topsoil (203-04) | CY | 15,633 | $9.54 | $11.60 | $21.00 | $13.44 | $11.33 | $16.70 |
| 40 | Undercutting (203-05) | CY | 4,994 | $13.57 | $16.40 | $14.50 | $11.56 | $15.83 | $9.40 |
| 41 | Water (203-06) | MG | 1,795 | $1.58 | $5.60 | $51.00 | $16.57 | $22.30 | $98.75 |
| 42 | Furnishing & spreading topsoil (203-07) | CY | 4,500.70 | $2.10 | $15.60 | $21.00 | $12.97 | $32.24 | $79.75 |
| 43 | Compacted clay (203-15.03) | CY | 4,994 | $15.26 | $18.10 | $15.75 | $15.01 | $18.58 | $8.35 |
| 44 | Flowable fill (excavatable) (204-06.02) | CY | 72 | $990.00 | $323.70 | $315.00 | $203.37 | $251.39 | $312.00 |
| 45 | Backfill material (flowable fill) (204-08.01) | CY | 99 | $990.00 | $323.70 | $550.00 | $508.32 | $410.00 | $310.00 |
| 46 | Brooming & degrassing shoulders (208-01.05) | LM | 8 | $2,292.86 | $1,500.00 | $4,175.00 | $1,580.78 | $1,521.47 | $1,500.00 |
| 47 | 18" temporary slope drain (209-02.07) | LF | 1,998 | $37.63 | $41.00 | $25.00 | $34.02 | $14.30 | $30.30 |
| 48 | Sediment removal (209-05) | CY | 2,130 | $15.02 | $18.10 | $22.75 | $9.15 | $19.20 | $31.50 |
| 49 | Temporary silt fence (with backing) (209-08.02) | LF | 32,657 | $5.25 | $4.59 | $5.80 | $5.37 | $5.25 | $5.60 |
| 50 | Rock check dam (209-08.07) | EACH | 410 | $577.50 | $1,293.80 | $590.00 | $656.51 | $577.50 | $1,000.00 |
| 51 | Enhanced rock check dam (209-08.08) | EACH | 60 | $840.00 | $1,728.65 | $1,150.00 | $1,014.61 | $840.00 | $1,400.00 |
| 52 | Sandbags (209-09.01) | BAG | 1,508 | $7.09 | $14.30 | $9.60 | $8.64 | $7.09 | $7.55 |
| 53 | Catch basin protection (type A) (209-40.30) | EACH | 4 | $551.25 | $524.50 | $600.00 | $954.93 | $551.25 | $590.00 |
| 54 | Mineral aggregate, type A base, grading D (303-01) | TON | 71,591 | $37.00 | $39.00 | $39.50 | $37.22 | $36.80 | $41.30 |
| 55 | Granular backfill (roadway) (303-01.01) | TON | 3,908.45 | $58.19 | $53.00 | $47.45 | $59.50 | $46.19 | $51.75 |
| 56 | Mineral aggregate (size 57) (303-10.01) | TON | 2,158 | $55.81 | $49.30 | $47.45 | $44.36 | $46.19 | $46.50 |
| 57 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 5,962 | $141.75 | $140.00 | $160.00 | $155.00 | $147.00 | $148.00 |
| 58 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 6,361 | $157.50 | $151.00 | $172.00 | $165.00 | $158.55 | $165.00 |
| 59 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 2,343 | $157.50 | $149.00 | $170.00 | $172.50 | $156.45 | $165.00 |
| 60 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 1,152 | $178.50 | $169.00 | $192.50 | $195.65 | $177.45 | $187.00 |
| 61 | Bituminous material for prime coat (PC) (402-01) | TON | 136 | $128.10 | $300.00 | $341.00 | $347.31 | $315.00 | $1,300.00 |
| 62 | Aggregate for cover material (PC) (402-02) | TON | 401 | $152.25 | $45.00 | $51.25 | $52.10 | $47.25 | $159.00 |
| 63 | Bituminous material for tack coat (TC) (403-01) | TON | 53 | $997.50 | $1,250.00 | $1,425.00 | $1,447.14 | $1,312.50 | $1,000.00 |
| 64 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 2,397 | $165.90 | $169.00 | $192.00 | $195.65 | $177.45 | $174.00 |
| 65 | Acs mix(PG64-22) grading D (411-01.10) | TON | 3,975 | $215.25 | $171.00 | $195.00 | $197.97 | $179.55 | $225.00 |
| 66 | Acs mix(PG70-22) grading D (411-02.10) | TON | 747 | $215.25 | $187.00 | $213.00 | $216.49 | $196.35 | $225.00 |
| 67 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 4 | $2,714.25 | $2,585.00 | $2,950.00 | $2,992.70 | $1,981.88 | $4,000.00 |
| 68 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 102 | $119.49 | $82.80 | $114.50 | $144.22 | $143.78 | $107.00 |
| 69 | 18" concrete pipe culvert (class IV) (607-03.03) | LF | 197 | $107.44 | $80.90 | $118.25 | $152.93 | $151.16 | $110.00 |
| 70 | 18" concrete pipe culvert (class IV) trenchless (607-03.10) | LF | 222 | $903.11 | $114.30 | $960.00 | $1,330.33 | $1,039.96 | $1,300.00 |
| 71 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 196 | $156.44 | $109.30 | $160.00 | $164.15 | $156.87 | $125.00 |
| 72 | 24" concrete pipe culvert(class IV) trenchless (607-05.10) | LF | 35 | $1,386.00 | $510.10 | $200.00 | $2,951.53 | $1,399.49 | $1,800.00 |
| 73 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 27 | $238.25 | $184.20 | $275.00 | $255.04 | $389.35 | $202.00 |
| 74 | 36" concrete pipe culvert (class IV) trenchless (607-07.10) | LF | 153 | $1,519.74 | $220.30 | $305.00 | $1,726.37 | $2,304.79 | $2,400.00 |
| 75 | 42" concrete pipe culvert (class III) (607-08.02) | LF | 102 | $320.23 | $186.20 | $265.00 | $279.05 | $237.51 | $279.00 |
| 76 | 48" concrete pipe culvert (class III) (607-09.02) | LF | 96 | $367.47 | $259.70 | $315.00 | $336.93 | $337.48 | $309.00 |
| 77 | 48" concrete pipe culvert (class IV) trenchless (607-09.10) | LF | 84 | $1,560.94 | $703.40 | $425.00 | $3,009.68 | $3,395.63 | $3,900.00 |
| 78 | 60" concrete pipe culvert (class III) (607-11.03) | LF | 110 | $1,731.10 | $369.60 | $445.00 | $1,957.47 | $1,729.45 | $520.00 |
| 79 | 23"X 14" horizontal oval concrete pipe culvert (607-16.01) | LF | 32 | $890.06 | $133.50 | $190.00 | $246.38 | $167.08 | $164.00 |
| 80 | 18" pipe culvert (side drain) (607-39.02) | LF | 1,010 | $76.45 | $97.10 | $70.00 | $144.08 | $80.24 | $129.00 |
| 81 | 24" pipe culvert (side drain) (607-39.03) | LF | 80 | $117.00 | $132.90 | $92.00 | $191.73 | $105.26 | $153.00 |
| 82 | Manholes, > 12' - 16' depth (611-01.04) | EACH | 1 | $21,750 | $18,362 | $23,000 | $30,166 | $13,650 | $26,700 |
| 83 | Class A concrete (pipe endwalls) (611-07.01) | CY | 35 | $2,859.35 | $1,322.20 | $2,975.00 | $1,056.02 | $2,782.50 | $2,500.00 |
| 84 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 1,713 | $4.90 | $1.90 | $8.80 | $1.18 | $16.70 | $11.25 |
| 85 | 18IN endwall (cross drain) 3:1 (611-07.54) | EACH | 6 | $3,321.06 | $1,873.90 | $2,030.00 | $4,026.55 | $1,963.85 | $3,100.00 |
| 86 | 18IN endwall (cross drain) 4:1 (611-07.55) | EACH | 4 | $3,737.00 | $2,175.30 | $2,350.00 | $4,451.61 | $2,140.83 | $3,600.00 |
| 87 | 24IN endwall (cross drain) 3:1 (611-07.57) | EACH | 3 | $4,133.14 | $2,693.90 | $2,825.00 | $4,908.46 | $2,860.58 | $4,300.00 |
| 88 | 24IN endwall (cross drain) 4:1 (611-07.58) | EACH | 3 | $4,786.76 | $3,164.30 | $3,315.00 | $6,243.30 | $3,149.65 | $5,000.00 |
| 89 | 36IN endwall (cross drain) 3:1 (611-07.63) | EACH | 1 | $7,975.80 | $7,877.20 | $6,450.00 | $10,583 | $10,541 | $6,100.00 |
| 90 | 36IN endwall (cross drain) 4:1 (611-07.64) | EACH | 1 | $9,389.24 | $9,317.00 | $7,575.00 | $13,913 | $10,646 | $7,200.00 |
| 91 | 36IN endwall (cross drain) 6:1 (611-07.65) | EACH | 2 | $12,232 | $12,205 | $9,680.00 | $17,911 | $10,853 | $9,300.00 |
| 92 | 42IN endwall (cross drain) 3:1 (611-07.66) | EACH | 2 | $9,246.31 | $12,319 | $8,525.00 | $6,944.43 | $14,339 | $7,300.00 |
| 93 | 48IN endwall (cross drain) 3:1 (611-07.69) | EACH | 3 | $10,845 | $13,118 | $9,825.00 | $15,749 | $20,315 | $8,900.00 |
| 94 | Catch basins, type 43, > 8' - 12' depth (611-43.03) | EACH | 1 | $32,754 | $18,722 | $20,850 | $29,975 | $27,198 | $19,900 |
| 95 | 24" temporary drainage pipe (621-03.03) | LF | 40 | $100.00 | $98.10 | $45.25 | $166.44 | $81.15 | $90.25 |
| 96 | 54" temporary drainage pipe (621-03.08) | LF | 570 | $171.70 | $189.90 | $206.00 | $229.29 | $168.88 | $164.00 |
| 97 | Concrete driveway (701-02) | SF | 1,372 | $15.80 | $30.00 | $22.60 | $31.50 | $34.66 | $18.00 |
| 98 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 2 | $79.12 | $75.00 | $85.79 | $86.83 | $78.75 | $151.00 |
| 99 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 2,646 | $27.43 | $26.00 | $29.50 | $30.10 | $27.30 | $32.70 |
| 100 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 4 | $1,793.32 | $1,700.00 | $1,940.00 | $1,968.12 | $1,785.00 | $2,000.00 |
| 101 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 7 | $2,900.96 | $2,750.00 | $3,150.00 | $3,183.72 | $2,887.50 | $3,800.00 |
| 102 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 1 | $2,637.23 | $2,500.00 | $2,900.00 | $2,894.29 | $2,625.00 | $3,600.00 |
| 103 | Guardrail removed (706-01) | LF | 215 | $0.53 | $0.50 | $1.15 | $0.58 | $0.53 | $1.65 |
| 104 | Radius rail (706-06.03) | LF | 292 | $30.59 | $29.00 | $33.15 | $33.57 | $30.45 | $49.10 |
| 105 | Rounded end element (706-10.26) | EACH | 4 | $105.49 | $100.00 | $114.25 | $115.77 | $105.00 | $351.00 |
| 106 | Stock fence (707-03.01) | LF | 1,150 | $8.19 | $7.80 | $9.00 | $9.31 | $39.90 | $8.85 |
| 107 | End, braced line, corner post assembly(stock fence) (707-03.02) | EACH | 7 | $283.50 | $270.00 | $308.00 | $322.25 | $892.50 | $306.00 |
| 108 | High-visibility construction fence (707-08.11) | LF | 825 | $2.63 | $2.50 | $2.85 | $2.39 | $2.63 | $2.80 |
| 109 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 79 | $315.00 | $367.18 | $515.00 | $358.06 | $502.55 | $340.00 |
| 110 | Machined rip-rap (class A-3) (709-05.05) | TON | 800 | $62.89 | $60.00 | $53.90 | $58.06 | $52.34 | $64.25 |
| 111 | Machined rip-rap (class A-1) (709-05.06) | TON | 1,958 | $60.29 | $60.00 | $53.95 | $59.42 | $52.16 | $53.00 |
| 112 | Machined rip-rap (class B) (709-05.08) | TON | 2,758.91 | $64.71 | $61.00 | $55.25 | $64.10 | $53.40 | $48.40 |
| 113 | Machined rip-rap (class C) (709-05.09) | TON | 817 | $64.71 | $61.00 | $55.25 | $65.57 | $59.60 | $57.00 |
| 114 | Traffic control (712-01) | LS | 1 | $179,562 | $96,393 | $245,000 | $304,515 | $159,951 | $400,000 |
| 115 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 4,721 | $171.80 | $26.79 | $45.00 | $56.08 | $62.91 | $68.25 |
| 116 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 870 | $186.91 | $131.83 | $165.00 | $215.88 | $185.16 | $98.75 |
| 117 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 12 | $5,050.50 | $9,200.00 | $7,000.00 | $5,568.61 | $10,798 | $10,300 |
| 118 | Flexible drums (channelizing) (712-04.01) | EACH | 790 | $53.03 | $50.00 | $57.00 | $57.89 | $52.50 | $55.75 |
| 119 | Barrier rail delineator (712-04.50) | EACH | 159 | $16.97 | $16.00 | $18.25 | $18.52 | $16.80 | $17.85 |
| 120 | Warning lights (type A) (712-05.01) | EACH | 249 | $28.11 | $26.50 | $30.25 | $30.68 | $27.83 | $29.60 |
| 121 | Signs (construction) (712-06) | SF | 939.17 | $8.48 | $8.00 | $9.15 | $9.26 | $8.40 | $8.90 |
| 122 | Temporary barricades (type III) (712-07.03) | LF | 1,175 | $10.61 | $10.00 | $11.45 | $11.58 | $10.50 | $11.15 |
| 123 | Removable pavement marking (stop line) (712-09.04) | LF | 225 | $21.00 | $20.00 | $20.00 | $23.15 | $21.00 | $22.30 |
| 124 | Removable pavement marking (6" line) (712-09.08) | LF | 4,000 | $3.41 | $3.25 | $3.25 | $3.76 | $3.41 | $3.65 |
| 125 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 4 | $606.90 | $200.00 | $230.00 | $231.54 | $210.00 | $223.00 |
| 126 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 772 | $4.10 | $1.00 | $1.15 | $1.16 | $1.05 | $1.10 |
| 127 | Perforated/knockout square tube post (713-11.02) | LB | 1,619 | $4.40 | $4.50 | $5.15 | $5.21 | $4.73 | $5.00 |
| 128 | Square tube sign support (713-11.05) | LB | 66 | $8.74 | $4.50 | $5.15 | $5.21 | $4.73 | $5.00 |
| 129 | P post slip base (713-11.21) | EACH | 31 | $601.65 | $575.00 | $650.00 | $665.69 | $603.75 | $640.00 |
| 130 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 98 | $19.16 | $14.00 | $34.00 | $16.21 | $14.70 | $15.60 |
| 131 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 277 | $20.53 | $15.25 | $24.00 | $17.66 | $16.01 | $17.00 |
| 132 | Extruded aluminum panel signs (713-14) | SF | 96 | $45.12 | $30.00 | $70.00 | $34.73 | $31.50 | $33.50 |
| 133 | Street name sign (suspended 0.100IN thick) (713-14.22) | SF | 106 | $45.68 | $43.50 | $120.00 | $50.87 | $96.60 | $71.50 |
| 134 | Removal of signs, posts and footings (713-15) | LS | 1 | $3,412.50 | $500.00 | $570.00 | $578.86 | $525.00 | $560.00 |
| 135 | Changeable message sign unit (713-16.01) | EACH | 3 | $9,651.52 | $9,100.00 | $10,400 | $10,535 | $9,555.00 | $10,200 |
| 136 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 210 | $42.00 | $40.00 | $45.75 | $46.31 | $42.00 | $44.60 |
| 137 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 60 | $42.00 | $40.00 | $45.75 | $46.31 | $42.00 | $44.60 |
| 138 | Removal of snowplowable reflective marker (716-01.30) | EACH | 270 | $10.50 | $10.00 | $17.15 | $11.58 | $10.50 | $11.15 |
| 139 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 313 | $26.25 | $25.00 | $27.45 | $28.94 | $26.25 | $27.90 |
| 140 | Plastic pavement marking (stop line) (716-02.05) | LF | 579 | $10.50 | $10.00 | $13.15 | $11.58 | $10.50 | $11.15 |
| 141 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 13 | $157.50 | $150.00 | $171.25 | $173.66 | $157.50 | $167.00 |
| 142 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 5 | $183.75 | $175.00 | $200.00 | $202.60 | $183.75 | $195.00 |
| 143 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 3 | $157.50 | $150.00 | $160.00 | $173.66 | $157.50 | $167.00 |
| 144 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 2 | $236.25 | $225.00 | $315.00 | $260.49 | $236.25 | $251.00 |
| 145 | Painted pavement marking (6" line) (716-05.20) | LM | 8 | $1,312.50 | $1,250.00 | $1,170.00 | $1,447.14 | $1,312.50 | $1,400.00 |
| 146 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 16 | $6,483.75 | $6,175.00 | $7,145.00 | $7,148.89 | $6,483.75 | $6,900.00 |
| 147 | Mobilization (717-01) | LS | 1 | $1,080,000 | $2,222,300 | $1,565,000 | $1,250,000 | $2,520,542 | $2,388,000 |
| 148 | Removal of signal equipment (730-01.02) | EACH | 1 | $11,183 | $10,650 | $2,500.00 | $12,454 | $2,310.00 | $13,300 |
| 149 | Modification of existing traffic signal equipment (730-01.03) | EACH | 1 | $3,832.50 | $3,650.00 | $2,120.00 | $4,268.34 | $1,953.00 | $26,200 |
| 150 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 2 | $1,522.50 | $1,450.00 | $1,760.00 | $1,695.64 | $1,621.20 | $1,900.00 |
| 151 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 6 | $1,459.50 | $1,390.00 | $1,760.00 | $1,625.48 | $1,621.20 | $1,900.00 |
| 152 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 2 | $2,415.00 | $2,300.00 | $2,750.00 | $2,689.64 | $2,541.00 | $2,900.00 |
| 153 | Electrical service connection (730-05.01) | EACH | 1 | $5,764.50 | $5,490.00 | $9,340.00 | $6,420.05 | $8,610.00 | $3,900.00 |
| 154 | Signal cable - 5 conductor (730-08.02) | LF | 336 | $2.31 | $2.20 | $2.80 | $2.57 | $2.63 | $5.90 |
| 155 | Signal cable - 7 conductor (730-08.03) | LF | 699 | $2.63 | $2.50 | $3.15 | $2.92 | $2.89 | $6.45 |
| 156 | Span wire assembly (730-09.20) | LF | 550 | $5.04 | $4.80 | $3.40 | $5.61 | $3.15 | $7.25 |
| 157 | Tether wire assembly - 1/4" diameter (730-10.01) | LF | 550 | $4.31 | $4.10 | $3.40 | $4.79 | $3.15 | $6.70 |
| 158 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 20 | $46.20 | $44.00 | $27.00 | $51.45 | $25.20 | $27.90 |
| 159 | Vehicle detector (radar - stop line) (730-13.12) | EACH | 4 | $13,440 | $12,800 | $12,650 | $14,968 | $11,652 | $12,000 |
| 160 | Vehicle detector (radar - advance) (730-13.13) | EACH | 4 | $14,018 | $13,350 | $13,420 | $15,612 | $12,366 | $12,800 |
| 161 | Cabinet (atc) (730-15.07) | EACH | 1 | $31,185 | $29,700 | $39,775 | $34,731 | $36,651 | $32,100 |
| 162 | Controller (atc) (730-16.04) | EACH | 1 | $7,801.50 | $7,430.00 | $13,200 | $8,688.72 | $12,173 | $11,900 |
| 163 | Steel strain pole (signal support) (730-23.01) | EACH | 4 | $30,660 | $29,200 | $39,370 | $34,147 | $36,280 | $39,400 |
| 164 | Geomembrane (740-06.01) | SY | 19,858.54 | $11.33 | $8.82 | $12.00 | $16.22 | $14.12 | $10.65 |
| 165 | Geotextile (type III)(erosion control) (740-10.03) | SY | 5,117 | $1.84 | $4.58 | $4.50 | $5.93 | $1.84 | $1.95 |
| 166 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 70 | $24.67 | $3.85 | $20.00 | $7.97 | $3.89 | $4.15 |
| 167 | Temporary sediment tube 12IN (740-11.02) | LF | 17,435 | $3.68 | $3.50 | $4.50 | $3.28 | $3.68 | $3.90 |
| 168 | Temporary sediment tube 20IN (740-11.04) | LF | 15,515 | $3.94 | $3.70 | $4.75 | $3.40 | $3.94 | $4.20 |
| 169 | Temporary seeding (with mulch) (801-01.07) | UNIT | 1,396 | $31.50 | $29.89 | $35.00 | $29.84 | $31.50 | $33.50 |
| 170 | Seeding (without mulch) (801-02) | UNIT | 1,396 | $19.95 | $18.95 | $21.50 | $29.84 | $19.95 | $21.20 |
| 171 | Water (seeding & sodding) (801-03) | MG | 140 | $63.00 | $60.00 | $68.50 | $119.37 | $63.00 | $67.00 |
| 172 | Sodding (new sod) (803-01) | SY | 16,980.80 | $5.72 | $5.39 | $6.15 | $7.16 | $5.72 | $6.10 |
| 173 | Erosion control blanket (type II) (805-12.02) | SY | 155,080 | $1.10 | $1.00 | $3.25 | $1.19 | $1.10 | $1.15 |
| 174 | Project mowing (806-02.03) | CYCL | 6 | $9,208.91 | $5,985.00 | $6,800.00 | $9,549.31 | $6,300.00 | $6,700.00 |
| 175 | Pole 40FT class 4 wood (790-03.03) | EACH | 4 | $1,135.44 | $1,375.00 | $1,225.00 | $1,607.94 | $1,560.67 | $1,600.00 |
| 176 | Pole 45FT class 1 wood (790-04.01) | EACH | 2 | $1,692.32 | $1,543.66 | $1,825.00 | $1,805.17 | $2,040.06 | $2,100.00 |
| 177 | Pole 45FT class 2 wood (790-04.02) | EACH | 3 | $1,615.50 | $1,455.86 | $1,800.00 | $1,702.50 | $1,959.92 | $2,100.00 |
| 178 | Pole 45FT class 3 wood (790-04.03) | EACH | 39 | $1,525.87 | $1,353.43 | $1,700.00 | $1,582.71 | $1,866.43 | $2,000.00 |
| 179 | Pole 50FT class 2 wood (790-05.02) | EACH | 8 | $1,996.98 | $1,761.67 | $2,200.00 | $2,060.12 | $2,528.64 | $2,700.00 |
| 180 | Pole 60FT class 2 wood (790-07.02) | EACH | 1 | $2,564.09 | $2,344.76 | $2,800.00 | $2,741.98 | $3,427.17 | $3,600.00 |
| 181 | Pole 65FT class 2 wood (790-08.01) | EACH | 1 | $3,233.61 | $3,175.13 | $3,490.00 | $3,713.02 | $4,432.55 | $4,700.00 |
| 182 | 1PH SGL support 15KV (790-21.04) | EACH | 4 | $602.91 | $819.31 | $650.00 | $958.11 | $289.75 | $303.00 |
| 183 | 1PH DBL primary support 15KV (790-21.05) | EACH | 1 | $712.10 | $885.16 | $800.00 | $1,035.11 | $383.78 | $403.00 |
| 184 | 1PH primary LG angle 15KV (790-21.07) | EACH | 6 | $1,061.75 | $1,265.63 | $1,200.00 | $1,480.04 | $799.22 | $840.00 |
| 185 | 1PH deadend 15KV (790-21.08) | EACH | 4 | $275.23 | $790.05 | $300.00 | $923.89 | $331.11 | $348.00 |
| 186 | 1PH primary tap 15KV (790-21.09) | EACH | 16 | $475.96 | $982.07 | $525.00 | $1,148.44 | $391.86 | $412.00 |
| 187 | 1PH dde feed through 15KV (790-21.18) | EACH | 6 | $1,054.79 | $1,726.43 | $1,200.00 | $2,018.90 | $659.62 | $690.00 |
| 188 | 3PH crossarm SGL 15KV (790-25.01) | EACH | 24 | $1,467.04 | $1,872.10 | $1,600.00 | $2,189.25 | $1,430.06 | $1,500.00 |
| 189 | 3PH crossarm DBL LRG cond 15KV (790-25.07) | EACH | 9 | $1,403.96 | $1,891.13 | $1,500.00 | $2,211.51 | $1,651.65 | $1,700.00 |
| 190 | 3PH vertical deadend 15KV (790-25.19) | EACH | 4 | $806.45 | $1,247.26 | $860.00 | $1,458.56 | $1,336.28 | $1,400.00 |
| 191 | 3PH crossarm deadend SGL 15KV (790-25.21) | EACH | 5 | $1,666.51 | $2,074.05 | $1,800.00 | $2,425.42 | $2,090.90 | $2,200.00 |
| 192 | 3PH crossarm dde LRG cond 15KV (790-25.24) | EACH | 2 | $2,076.40 | $2,308.18 | $2,300.00 | $2,699.21 | $3,121.48 | $3,300.00 |
| 193 | Secondary assemblies deadend (790-30.03) | EACH | 9 | $195.33 | $529.25 | $225.00 | $618.91 | $105.47 | $111.00 |
| 194 | Secondary conductor 1/0 AL duplex (790-30.09) | LF | 90 | $3.93 | $7.40 | $5.00 | $8.65 | $7.46 | $7.85 |
| 195 | Secondary conductor 1/0 AL triplex (790-30.14) | LF | 687 | $4.63 | $8.51 | $5.00 | $9.95 | $8.19 | $8.60 |
| 196 | Down guy - through bolt type heavy duty (790-32.02) | EACH | 63 | $740.53 | $585.99 | $800.00 | $685.26 | $441.97 | $464.00 |
| 197 | OH guy - through bolt type (790-32.07) | EACH | 2 | $459.05 | $537.70 | $500.00 | $628.79 | $602.11 | $630.00 |
| 198 | Guy guard (790-32.23) | EACH | 24 | $19.44 | $92.29 | $20.00 | $107.92 | $27.10 | $28.50 |
| 199 | Anchor (description) (790-32.25) | EACH | 51 | $1,013.82 | $865.81 | $1,000.00 | $1,012.49 | $1,025.34 | $1,100.00 |
| 200 | Transfer light (790-36.06) | EACH | 3 | $222.20 | $702.25 | $235.00 | $821.22 | $250.97 | $264.00 |
| 201 | Transfer - 1TR XFMR assembly (790-36.09) | EACH | 3 | $1,048.32 | $2,165.27 | $1,130.00 | $2,532.08 | $1,010.56 | $1,100.00 |
| 202 | Transfer street light (790-36.13) | EACH | 6 | $341.00 | $694.76 | $360.00 | $812.46 | $250.97 | $264.00 |
| 203 | Transfer framing/associated apparatus (790-36.15) | EACH | 1 | $1,828.20 | $3,116.26 | $1,950.00 | $3,644.19 | $3,030.99 | $3,200.00 |
| 204 | OH cond 1/0 6/1 acsr raven (790-40.03) | LF | 5,762 | $3.62 | $2.78 | $4.00 | $3.25 | $2.94 | $3.10 |
| 205 | OH cond 336.4 19 aac tulip (790-40.42) | LF | 9,200 | $3.85 | $4.31 | $4.00 | $5.04 | $4.83 | $5.05 |
| 206 | OH cond 556.5 19 aac dahlia (790-40.46) | LF | 26,802 | $6.42 | $6.38 | $6.50 | $7.46 | $6.90 | $7.25 |
| 207 | UG pri cond 1/0 AL 15KV (790-41.03) | LF | 672 | $19.35 | $14.61 | $20.50 | $17.09 | $17.49 | $18.40 |
| 208 | UG sec cond 1/0 AL TPLX (790-41.46) | LF | 623 | $4.37 | $4.76 | $4.70 | $5.57 | $9.45 | $9.95 |
| 209 | 1 duct @ 36IN-48IN depth (790-42.16) | LF | 599 | $44.15 | $40.00 | $47.50 | $46.78 | $148.45 | $156.00 |
| 210 | 2 duct bank @ 36IN-48IN depth (790-42.17) | LF | 672 | $50.26 | $59.00 | $55.00 | $69.00 | $152.46 | $160.00 |
| 211 | Secondary riser W/ 2IN conduit (790-43.50) | EACH | 3 | $673.54 | $735.88 | $725.00 | $860.54 | $1,314.95 | $1,400.00 |
| 212 | 1PH primary riser W/ 3IN conduit (790-43.53) | EACH | 2 | $1,460.71 | $1,975.62 | $1,550.00 | $2,311.48 | $3,090.69 | $3,200.00 |
| 213 | Urd splice 46KV (790-43.64) | EACH | 2 | $565.82 | $907.11 | $600.00 | $1,060.79 | $2,684.42 | $2,800.00 |
| 214 | 1PH transformer (790-46.01) | EACH | 8 | $914.73 | $863.21 | $985.00 | $1,009.45 | $738.26 | $780.00 |
| 215 | Cutout knife switch-SNGL loadbreak 25KV (790-59.03) | EACH | 14 | $1,282.63 | $1,075.40 | $1,350.00 | $1,257.58 | $795.77 | $840.00 |
| 216 | 3PH sectionalizer or recl 15KV (790-60.09) | EACH | 1 | $6,425.32 | $7,864.80 | $6,900.00 | $9,197.18 | $8,205.21 | $8,600.00 |
| 217 | Lightning arrester arm MTD 9 KV (790-65.03) | EACH | 1 | $395.59 | $1,623.99 | $425.00 | $1,899.10 | $429.99 | $452.00 |
| 218 | Pole ground rod type (790-68.01) | EACH | 22 | $303.15 | $515.75 | $325.00 | $603.12 | $445.92 | $468.00 |
| 219 | Pole ground plate type (790-68.02) | EACH | 35 | $296.75 | $508.43 | $315.00 | $594.56 | $371.18 | $390.00 |
| 220 | Pole ground for air break switch (790-68.07) | EACH | 1 | $1,393.65 | $1,605.93 | $1,500.00 | $1,877.99 | $2,189.76 | $2,300.00 |
| 221 | Switch goab 1W 600A 69KV max (790-73.11) | EACH | 1 | $12,447 | $12,665 | $13,400 | $14,810 | $15,309 | $16,100 |
| 222 | Fiber optic maintenance loop (790-74.26) | EACH | 100 | $413.49 | $217.34 | $440.00 | $254.19 | $793.97 | $1,600.00 |
| 223 | Fiber tangent assembly (790-74.31) | EACH | 25 | $206.36 | $556.54 | $220.00 | $650.82 | $309.79 | $1,600.00 |
| 224 | Fiber deadend assembly (790-74.32) | EACH | 1 | $375.08 | $1,017.96 | $400.00 | $1,190.40 | $634.13 | $1,600.00 |
| 225 | Fiber double deadend assembly (790-74.33) | EACH | 6 | $628.52 | $1,472.07 | $675.00 | $1,721.45 | $879.40 | $1,600.00 |
| 226 | Remove wire (790-98.01) | LF | 42,516 | $0.91 | $1.80 | $1.00 | $2.10 | $1.91 | $2.00 |
| 227 | Remove poles (790-98.02) | EACH | 65 | $296.19 | $617.00 | $320.00 | $721.53 | $544.59 | $570.00 |
| 228 | Remove framing/associated apparatus (790-98.03) | EACH | 296 | $250.62 | $335.00 | $270.00 | $391.75 | $340.37 | $358.00 |
| 229 | 2IN mdpe gas main (791-02.02) | LF | 1,187 | $20.13 | $22.00 | $52.50 | $23.15 | $74.55 | $44.10 |
| 230 | 4IN mdpe gas main (791-02.04) | LF | 3,117 | $35.72 | $30.00 | $72.25 | $39.99 | $99.75 | $61.25 |
| 231 | 6IN mdpe gas main (791-02.05) | LF | 10,253 | $61.13 | $45.00 | $78.85 | $68.43 | $132.30 | $67.00 |
| 232 | Bore/jack 4IN - steel casing pipe - uncon. (791-05.01) | LF | 186 | $52.50 | $150.00 | $81.00 | $58.77 | $262.50 | $69.25 |
| 233 | Bore/jack 8IN - steel casing pipe - uncon. (791-05.03) | LF | 13 | $105.00 | $500.00 | $94.00 | $117.53 | $807.45 | $79.25 |
| 234 | Bore/jack 12IN - steel casing pipe - uncon. (791-05.04) | LF | 173 | $147.00 | $277.72 | $120.00 | $411.37 | $824.25 | $103.00 |
| 235 | Bore/jack 4IN - steel casing pipe - rock (791-05.17) | LF | 186 | $147.00 | $295.00 | $217.00 | $164.55 | $642.60 | $184.00 |
| 236 | Bore/jack 8IN - steel casing pipe - rock (791-05.19) | LF | 13 | $252.00 | $800.00 | $275.00 | $282.08 | $1,734.60 | $234.00 |
| 237 | Bore/jack 12IN - steel casing pipe - rock (791-05.21) | LF | 173 | $367.50 | $450.00 | $395.00 | $411.37 | $1,485.75 | $335.00 |
| 238 | Connect to 2IN EX. PE main (791-06.02) | EACH | 2 | $2,276.77 | $2,500.00 | $1,700.00 | $2,548.56 | $3,150.00 | $1,500.00 |
| 239 | Connect to 4IN EX. PE main (791-06.03) | EACH | 3 | $3,772.98 | $3,000.00 | $2,100.00 | $4,223.38 | $5,775.00 | $1,800.00 |
| 240 | Connect to 6IN EX. PE main (791-06.04) | EACH | 8 | $8,222.71 | $4,200.00 | $3,285.00 | $9,204.31 | $6,825.00 | $2,100.00 |
| 241 | 2IN PE gas valve assembly (791-07.01) | EACH | 2 | $840.00 | $1,500.00 | $1,250.00 | $940.28 | $1,312.50 | $1,100.00 |
| 242 | 4IN PE gas valve assembly (791-07.02) | EACH | 5 | $1,155.00 | $2,000.00 | $1,840.00 | $1,292.88 | $2,205.00 | $1,600.00 |
| 243 | 6IN PE gas valve assembly (791-07.03) | EACH | 4 | $1,680.00 | $2,800.00 | $2,500.00 | $1,880.56 | $3,255.00 | $2,100.00 |
| 244 | 3/4IN service assembly (791-08.02) | EACH | 9 | $1,470.00 | $1,200.00 | $1,840.00 | $1,645.48 | $4,515.00 | $1,600.00 |
| 245 | 3/4IN PE service pipe (791-08.07) | LF | 450 | $10.50 | $20.00 | $34.25 | $11.75 | $32.55 | $29.00 |
| 246 | Gas main removal (791-08.41) | LF | 11,553 | $0.01 | $2.00 | $11.50 | $4.70 | $31.50 | $8.90 |
| 247 | Retire in place 3/4IN serv cut & plug (791-10.01) | EACH | 9 | $1,050.00 | $1,200.00 | $790.00 | $1,175.35 | $834.75 | $670.00 |
| 248 | Retire in place 2IN serv cut & plug (791-10.04) | EACH | 3 | $4,316.08 | $1,200.00 | $920.00 | $4,831.32 | $3,045.00 | $780.00 |
| 249 | Retire in place 4IN serv cut & plug (791-10.05) | EACH | 3 | $4,316.08 | $1,600.00 | $1,182.00 | $4,831.32 | $3,675.00 | $1,000.00 |
| 250 | Retire in place 6IN serv cut & plug (791-10.06) | EACH | 8 | $6,474.12 | $2,200.00 | $1,576.00 | $7,246.98 | $6,405.00 | $1,300.00 |
| 251 | Retire gas main (791-10.20) | LF | 1 | $8.90 | $75.00 | $13,100 | $51.00 | $105.00 | $11,200 |
| 252 | Pole 40FT class 4 wood (793-01.12) | EACH | 1 | $1,443.75 | $1,375.00 | $4,325.00 | $1,607.95 | $4,725.00 | $3,800.00 |
| 253 | Pole 45FT class 3 wood (793-01.17) | EACH | 4 | $1,653.75 | $1,575.00 | $5,125.00 | $1,841.82 | $5,670.00 | $4,100.00 |
| 254 | Anchor 3/4IN (793-01.40) | EACH | 7 | $1,160.25 | $1,105.00 | $200.00 | $1,292.20 | $1,155.00 | $1,200.00 |
| 255 | Anchor 1 1/4IN (793-01.42) | EACH | 35 | $1,575.00 | $1,500.00 | $265.00 | $1,754.11 | $1,260.00 | $1,200.00 |
| 256 | Install pole number (793-01.99) | EACH | 5 | $136.50 | $130.00 | $85.00 | $152.02 | $131.25 | $93.25 |
| 257 | Guy wire 10M or 3/8IN (793-02.08) | EACH | 7 | $239.40 | $228.00 | $85.00 | $266.63 | $4.73 | $301.00 |
| 258 | Overhead guy wire (see plans) (793-02.94) | EACH | 1 | $1,218.00 | $1,160.00 | $255.00 | $1,356.52 | $1,701.00 | $1,100.00 |
| 259 | Install guy guard (793-02.99) | EACH | 7 | $103.43 | $98.50 | $85.00 | $115.18 | $84.00 | $107.00 |
| 260 | 25 pair group aerial splice (793-03.01) | EACH | 4 | $894.60 | $852.00 | $340.00 | $996.34 | $546.00 | $439.00 |
| 261 | 10M strand (793-03.03) | LF | 481 | $11.03 | $10.50 | $3.15 | $12.28 | $4.73 | $9.90 |
| 262 | 50 pair cable (793-03.12) | LF | 681 | $22.05 | $21.00 | $7.65 | $24.56 | $9.35 | $14.65 |
| 263 | Install strand bond (793-03.40) | EACH | 2 | $218.40 | $208.00 | $22.80 | $243.24 | $131.25 | $93.25 |
| 264 | Relash/delash cable (793-04.01) | LF | 345 | $5.78 | $5.50 | $2.50 | $6.43 | $6.30 | $5.40 |
| 265 | Aerial splice closure (793-04.07) | EACH | 3 | $1,569.75 | $1,495.00 | $1,250.00 | $1,748.27 | $6,090.00 | $4,400.00 |
| 266 | Underground splice closure (793-04.12) | EACH | 1 | $955.50 | $910.00 | $1,250.00 | $1,064.16 | $3,570.00 | $3,000.00 |
| 267 | 48 fiber(material only) (793-07.04) | LF | 445 | $1.47 | $1.40 | $2.25 | $1.64 | $2.31 | $1.80 |
| 268 | 96 fiber(material only) (793-07.05) | LF | 7,927 | $3.78 | $3.60 | $2.50 | $4.21 | $3.78 | $22.00 |
| 269 | 12-96 fiber(installation only) (793-07.16) | LF | 8,505 | $5.04 | $4.80 | $2.00 | $5.61 | $3.78 | $11.45 |
| 270 | Fiber optic maintenance loop (793-07.23) | EACH | 10 | $1,191.75 | $1,135.00 | $255.00 | $1,327.28 | $420.00 | $800.00 |
| 271 | Single fiber optic cable splice (793-07.25) | EACH | 288 | $92.93 | $88.50 | $43.00 | $103.49 | $63.00 | $80.50 |
| 272 | Fiber(48) aerial pressurized splice closure (793-07.73) | EACH | 1 | $1,401.75 | $1,335.00 | $998.00 | $1,561.15 | $13,272 | $3,000.00 |
| 273 | Fiber(144) aerial pressurized splice closure (793-07.74) | EACH | 2 | $2,268.00 | $2,160.00 | $998.00 | $2,525.93 | $19,866 | $8,900.00 |
| 274 | Marker post (793-11.19) | EACH | 1 | $580.65 | $553.00 | $85.00 | $646.69 | $525.00 | $530.00 |
| 275 | Handhole 30INX48IN (793-11.20) | EACH | 1 | $5,727.75 | $5,455.00 | $2,850.00 | $6,379.13 | $6,090.00 | $6,200.00 |
| 276 | Handhole (36IN X 24IN X 24IN) (793-11.21) | EACH | 3 | $4,011.00 | $3,820.00 | $2,850.00 | $4,467.14 | $4,410.00 | $4,600.00 |
| 277 | Enter existing handhole (793-11.32) | EACH | 1 | $1,060.50 | $1,010.00 | $200.00 | $1,181.09 | $1,890.00 | $5,100.00 |
| 278 | Dig splice pit 80 C.F. (793-12.01) | EACH | 8 | $1,590.75 | $1,515.00 | $370.00 | $1,771.66 | $1,596.00 | $451.00 |
| 279 | 1 duct formation @ 36IN depth (793-13.12) | LF | 20 | $53.55 | $51.00 | $48.00 | $59.64 | $84.00 | $113.00 |
| 280 | 2 duct formation @ 36IN depth (793-13.17) | LF | 575 | $60.90 | $58.00 | $51.25 | $67.83 | $94.50 | $75.50 |
| 281 | Concrete encasement per duct (793-14.02) | LF | 575 | $18.38 | $17.50 | $6.00 | $20.46 | $24.15 | $21.40 |
| 282 | 1 1/4IN innerduct (793-14.12) | LF | 52 | $3.89 | $3.70 | $3.75 | $4.33 | $12.60 | $6.55 |
| 283 | Multi duct (793-14.14) | LF | 575 | $7.46 | $7.10 | $4.85 | $8.30 | $5.51 | $6.75 |
| 284 | Underground cable (793-14.22) | LF | 82 | $5.78 | $5.50 | $17.00 | $6.43 | $13.02 | $5.70 |
| 285 | Underground to overhead riser (793-14.26) | EACH | 1 | $657.30 | $626.00 | $142.00 | $732.04 | $1,260.00 | $690.00 |
| 286 | Transfer cable attachment (793-15.01) | EACH | 2 | $558.60 | $532.00 | $200.00 | $622.13 | $840.00 | $467.00 |
| 287 | Directional bore 4IN/flex sleeve (793-16.04) | LF | 30 | $119.70 | $114.00 | $40.00 | $133.31 | $189.00 | $169.00 |
| 288 | Directional bore 1.25IN/flex sleeve (793-16.45) | LF | 52 | $87.68 | $83.50 | $35.00 | $97.65 | $168.00 | $169.00 |
| 289 | Remove aerial cable and wire (793-98.01) | LF | 8,684 | $2.73 | $2.60 | $1.10 | $3.04 | $3.15 | $3.70 |
| 290 | Remove poles all sizes (793-98.04) | EACH | 6 | $604.80 | $576.00 | $513.00 | $673.58 | $525.00 | $467.00 |
| 291 | Retire buried facilities in place (793-98.05) | LF | 1,041 | $1.89 | $1.80 | $5.90 | $2.10 | $12.60 | $2.05 |
| 292 | Remove pedestals (793-98.06) | EACH | 24 | $416.85 | $397.00 | $85.00 | $464.26 | $525.00 | $270.00 |
| 293 | Remove underground to overhead riser (793-98.07) | EACH | 1 | $476.70 | $454.00 | $200.00 | $530.92 | $525.00 | $467.00 |
| 294 | Remove anchor (any size) (793-98.08) | EACH | 15 | $238.35 | $227.00 | $145.00 | $265.46 | $525.00 | $233.00 |
| 295 | Remove down guy (793-98.09) | EACH | 3 | $238.35 | $227.00 | $63.00 | $265.46 | $525.00 | $233.00 |
| 296 | Remove fiber storage bracket (793-98.10) | EACH | 8 | $476.70 | $454.00 | $52.00 | $530.91 | $525.00 | $560.00 |
| 297 | 6IN dip restrained joint water line (795-01.03) | LF | 1,100 | $90.74 | $84.00 | $105.00 | $101.57 | $86.48 | $113.00 |
| 298 | 6IN dip slip joint water line (795-01.04) | LF | 1,100 | $88.71 | $78.00 | $99.00 | $99.30 | $60.87 | $106.00 |
| 299 | 8IN dip restrained joint water line (795-01.05) | LF | 1,150 | $110.22 | $98.00 | $118.25 | $123.38 | $91.31 | $128.00 |
| 300 | 8IN dip slip joint water line (795-01.06) | LF | 7,800 | $90.99 | $90.00 | $105.00 | $101.86 | $67.38 | $116.00 |
| 301 | HDD __in HDPE casing pipe-uncon (795-05.14) | LF | 700 | $21.66 | $24.00 | $120.00 | $24.25 | $47.11 | $144.00 |
| 302 | Flowable fill (trench plugs) (795-05.99) | CY | 10 | $507.32 | $250.00 | $262.00 | $567.88 | $304.04 | $590.00 |
| 303 | Connect to 2IN water line (795-06.01) | EACH | 1 | $3,300.68 | $2,500.00 | $1,500.00 | $3,694.70 | $2,206.40 | $9,300.00 |
| 304 | Connect to 6IN water line (795-06.04) | EACH | 5 | $7,389.35 | $4,200.00 | $3,200.00 | $8,271.47 | $3,891.51 | $10,200 |
| 305 | Connect to 8IN water line (795-06.05) | EACH | 2 | $8,029.69 | $5,800.00 | $4,000.00 | $8,988.25 | $3,891.51 | $7,700.00 |
| 306 | Cut and cap 2IN water line (795-06.31) | EACH | 1 | $1,992.47 | $1,800.00 | $985.00 | $2,230.33 | $1,826.71 | $3,600.00 |
| 307 | Cut and cap 6IN water line (795-06.33) | EACH | 5 | $2,049.16 | $2,800.00 | $1,650.00 | $2,293.78 | $1,826.69 | $3,800.00 |
| 308 | Cut and cap 8IN water line (795-06.34) | EACH | 2 | $2,219.23 | $3,400.00 | $1,850.00 | $2,484.15 | $1,826.69 | $4,000.00 |
| 309 | 6IN gate valve assembly (795-08.04) | EACH | 3 | $3,110.84 | $2,800.00 | $4,200.00 | $3,482.19 | $2,251.63 | $2,600.00 |
| 310 | 8IN gate valve assembly (795-08.05) | EACH | 17 | $4,433.85 | $3,800.00 | $6,300.00 | $4,963.15 | $3,254.53 | $3,500.00 |
| 311 | 3/4IN water service meter assembly (795-09.01) | EACH | 2 | $1,404.33 | $1,800.00 | $1,315.00 | $1,571.97 | $976.26 | $5,200.00 |
| 312 | 1IN water service meter assembly (795-09.02) | EACH | 1 | $2,267.77 | $2,200.00 | $2,300.00 | $2,538.48 | $1,170.95 | $5,700.00 |
| 313 | Relocate/reconnect service assembly (795-09.09) | EACH | 25 | $1,662.45 | $1,800.00 | $1,975.00 | $1,860.91 | $1,116.43 | $2,000.00 |
| 314 | 3/4IN pexa service pipe (795-09.60) | LF | 1,500 | $12.44 | $10.00 | $85.00 | $13.93 | $14.67 | $85.50 |
| 315 | 1IN pex service pipe (795-09.62) | LF | 100 | $13.55 | $20.00 | $99.00 | $15.16 | $49.34 | $86.75 |
| 316 | 1IN manual air release valve assembly (795-10.04) | EACH | 10 | $3,401.57 | $1,000.00 | $6,500.00 | $3,807.64 | $6,325.63 | $7,400.00 |
| 317 | Fire hydrant assembly (795-11.02) | EACH | 3 | $12,517 | $8,500.00 | $11,825 | $14,010 | $9,169.13 | $15,300 |
| 318 | Retire in place existing water main (795-11.12) | LF | 12,500 | $0.93 | $2.00 | $9.00 | $1.05 | $1.12 | $4.45 |
| 319 | DI fittings (795-13.01) | LB | 12,000 | $7.75 | $12.00 | $20.00 | $8.67 | $11.06 | $5.45 |
| 320 | Concrete encasement (795-14.05) | LF | 20 | $446.78 | $250.00 | $1,315.00 | $500.11 | $226.69 | $138.00 |
| 321 | 12IN steel casing pipe open cut method (795-15.02) | LF | 150 | $219.00 | $120.00 | $625.00 | $245.14 | $142.61 | $109.00 |
| 322 | 16IN steel casing pipe open cut method (795-15.25) | LF | 400 | $275.69 | $165.00 | $755.00 | $308.60 | $247.06 | $143.00 |
| 323 | Retire water meter assemblies (795-21.01) | LS | 1 | $3,541.82 | $5,000.00 | $19,000 | $3,964.63 | $446.67 | $14,900 |
| 324 | Retire water valves and hydrants (795-21.02) | LS | 1 | $5,897.83 | $15,000 | $32,850 | $6,601.90 | $446.67 | $14,900 |
| 325 | 16IN epoxy coated dip force main (797-01.18) | LF | 1,270 | $315.00 | $375.00 | $375.00 | $328.47 | $233.33 | $266.00 |
| 326 | Bore/jack 30IN steel casing pipe-uncon. (797-06.68) | LF | 84 | $1,050.00 | $2,500.00 | $1,660.00 | $1,094.91 | $1,589.67 | $1,300.00 |
| 327 | Open cut 30IN steel casing pipe (797-06.94) | LF | 105 | $666.75 | $510.00 | $935.00 | $695.27 | $401.29 | $530.00 |
| 328 | DI fittings (797-08.01) | LB | 2,400 | $15.75 | $15.00 | $30.00 | $16.42 | $19.32 | $12.45 |
| 329 | 1IN combo air release valve assembly (797-09.19) | EACH | 1 | $10,658 | $8,500.00 | $10,000 | $11,113 | $7,020.00 | $10,800 |
| 330 | Connect to 16IN force main (797-10.21) | EACH | 2 | $14,438 | $15,000 | $15,500 | $15,055 | $34,481 | $32,800 |
| 331 | Retirein place existing sewer 15IN-24IN (797-11.32) | LF | 1,250 | $3.05 | $10.00 | $70.00 | $3.18 | $1.12 | $18.65 |
| 332 | By-pass pumping (797-11.38) | LS | 1 | $36,750 | $25,000 | $40,000 | $38,322 | $24,864 | $62,800 |
| 333 | Fiber optic cable splice (798-05.03) | EACH | 100 | $144.90 | $138.00 | $44.00 | $66.84 | $63.00 | $67.00 |
| 334 | 3/8IN high strength strand (798-05.07) | LF | 9,809 | $5.88 | $5.60 | $2.45 | $4.99 | $4.73 | $5.00 |
| 335 | Communication assembly (bond) (798-05.27) | EACH | 24 | $276.15 | $263.00 | $40.00 | $219.98 | $3,003.00 | $3,200.00 |
| 336 | Communication assembly (CSC) (798-05.29) | EACH | 9 | $257.25 | $245.00 | $250.00 | $231.91 | $2,247.00 | $2,400.00 |
| 337 | Communication assembly (dde) (798-05.32) | EACH | 15 | $514.50 | $490.00 | $375.00 | $439.97 | $3,297.00 | $3,500.00 |
| 338 | Communication assembly (DE) (798-05.33) | EACH | 4 | $270.90 | $258.00 | $230.00 | $249.82 | $2,982.00 | $3,200.00 |
| 339 | Fiber optic cable (48F) (798-06.13) | LF | 10,588 | $6.30 | $6.00 | $2.50 | $6.18 | $4.62 | $4.90 |
| 340 | Fiber optic service drop cable (798-06.36) | LF | 2,829 | $5.67 | $5.40 | $2.00 | $5.59 | $4.62 | $4.90 |
| 341 | Fiber storage loop (798-06.48) | EACH | 50 | $817.95 | $779.00 | $255.00 | $559.32 | $420.00 | $446.00 |
| 342 | Transfer fiberoptic cable (798-08.06) | EACH | 27 | $885.15 | $843.00 | $255.00 | $439.97 | $3,360.00 | $3,600.00 |
| 343 | Remove steel strand (798-09.01) | LF | 10,076 | $2.63 | $2.50 | $1.00 | $2.05 | $3.15 | $3.35 |
| 344 | Remove poles, guys, anchors (798-09.03) | EACH | 64 | $165.90 | $158.00 | $1,360.00 | $95.08 | $525.00 | $560.00 |
| 345 | Remove fiber optic cable (798-09.07) | LF | 12,171 | $4.94 | $4.70 | $1.30 | $3.80 | $3.15 | $3.35 |
| 346 | Remove strand pole framing (798-09.08) | EACH | 90 | $132.30 | $126.00 | $63.00 | $95.08 | $525.00 | $560.00 |
| 347 | Power installed anchor (798-11.31) | EACH | 24 | $1,391.25 | $1,325.00 | $425.00 | $1,118.64 | $1,260.00 | $1,300.00 |
| 348 | Downguy - wrap type (798-11.41) | EACH | 24 | $247.80 | $236.00 | $130.00 | $231.91 | $525.00 | $560.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.