TDOT contract CN261016 bid tabulation
The resurfacing on s.r. 92 from near the jefferson county line (l.m. 0.05) to u.s. 11w (s.r. 1) (l.m. 9.24) and on u.s. 11w (s.r. 1) from near loop circle (l.m. 14.22) to near helton road (l.m. 22.02). Let by Tennessee DOT on March 20, 2026, Grainger County. 2 bids received; low bid $4,010,040 by PRI of East Tennessee Inc..
- Owner
- Tennessee DOT
- Letting
- 20 MAR 2026
- Pay items
- 41
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | PRI of East Tennessee Inc. | $4,010,040 | Low |
| 2 | APAC-Atlantic, Inc. | $4,018,003 | 0.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. PRI of East Tennessee Inc. | 2. APAC-Atlantic, Inc. |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $4,500.00 | $3,625.00 |
| 2 | Removal of trash and debris (202-01.03) | LS | 1 | $2,000.00 | $8,000.00 |
| 3 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 169 | $30.00 | $85.00 |
| 4 | Removal of curb and gutter (see curb ramp tabulation) (202-08.15) | LF | 829 | $14.00 | $30.00 |
| 5 | Furnishing & spreading topsoil (203-07) | CY | 27 | $65.00 | $110.00 |
| 6 | Brooming & degrassing shoulders (208-01.05) | LM | 35 | $700.00 | $1,100.00 |
| 7 | Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15) | TON | 2,789 | $135.00 | $128.75 |
| 8 | Bituminous material for tack coat (TC) (403-01) | TON | 235 | $865.00 | $800.00 |
| 9 | Acs mix(PG70-22) thin lift D asphalt (411-03.13) | TON | 14,913 | $150.00 | $137.00 |
| 10 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 20 | $435.00 | $650.00 |
| 11 | Cold planing bituminous pavement (415-01.02) | SY | 13,716 | $2.90 | $4.50 |
| 12 | Concrete sidewalk (4 ") (701-01.01) | SF | 1,513 | $20.00 | $19.00 |
| 13 | Concrete curb ramp (retrofit) (701-02.01) | SF | 3,616 | $42.00 | $52.00 |
| 14 | Concrete curb (702-01) | CY | 6 | $1,600.00 | $1,305.00 |
| 15 | Concrete combined curb & gutter (702-03) | CY | 36 | $1,000.00 | $1,120.00 |
| 16 | Portable barrier rail delineator (705-04.50) | EACH | 50 | $40.00 | $5.50 |
| 17 | Traffic control (712-01) | LS | 1 | $149,000 | $183,000 |
| 18 | Flexible drums (channelizing) (712-04.01) | EACH | 200 | $36.00 | $38.00 |
| 19 | Warning lights (type A) (712-05.01) | EACH | 100 | $1.00 | $1.05 |
| 20 | Signs (construction) (712-06) | SF | 3,092 | $7.65 | $8.00 |
| 21 | Signs (OH3-L, 12" X 36") (713-16.20) | EACH | 2 | $250.00 | $285.00 |
| 22 | Signs (OH3-R, 12" X 36") (713-16.21) | EACH | 2 | $250.00 | $285.00 |
| 23 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 1,378 | $40.00 | $45.00 |
| 24 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 283 | $40.00 | $45.00 |
| 25 | Removal of snowplowable reflective marker (716-01.30) | EACH | 1,456 | $10.00 | $10.25 |
| 26 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 1,567 | $23.00 | $24.00 |
| 27 | Plastic pavement marking (stop line) (716-02.05) | LF | 1,138 | $12.00 | $13.00 |
| 28 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 143 | $2.00 | $2.50 |
| 29 | Plastic pavement marking (8IN line) (716-02.12) | LM | 1 | $10,500 | $11,500 |
| 30 | Plastic word pavement marking (school) (716-03.04) | EACH | 7 | $650.00 | $685.00 |
| 31 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 3 | $200.00 | $205.00 |
| 32 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 2 | $350.00 | $375.00 |
| 33 | Painted pavement marking (6" line) (716-05.20) | LM | 30 | $995.00 | $1,025.00 |
| 34 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 73 | $3,650.00 | $4,025.00 |
| 35 | Spray thermo PVMT MRKNG (60 mil) (6IN dotted line) (716-13.05) | LF | 174 | $1.00 | $1.05 |
| 36 | Mobilization (717-01) | LS | 1 | $120,000 | $175,000 |
| 37 | Saw slot (730-14.02) | LF | 600 | $6.00 | $6.50 |
| 38 | Loop wire (730-14.03) | LF | 1,100 | $1.00 | $1.25 |
| 39 | Seeding (with mulch) (801-01) | UNIT | 4 | $1,400.00 | $540.00 |
| 40 | Expansion joint repairs (604-10.44) | LF | 144 | $325.00 | $365.00 |
| 41 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 1,160 | $55.00 | $51.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.