TDOT contract CNZ902 bid tabulation
The construction of a small drainage structure on s.r. 111 at l.m. 15.76. Let by Tennessee DOT on October 3, 2025, White County. 5 bids received; low bid $2,416,497 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 03 OCT 2025
- Pay items
- 76
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $2,416,497 | Low |
| 2 | Mack Construction, LLC | $2,733,093 | +13% |
| 3 | Cleary Construction, Inc. | $3,181,651 | +32% |
| 4 | J. Hill Excavating, LLC | $3,824,183 | +58% |
| 5 | Adams Contracting, LLC | $5,672,471 | +135% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Mack Construction, LLC | 3. Cleary Construction, Inc. | 4. J. Hill Excavating, LLC | 5. Adams Contracting, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $11,750 | $5,500.00 | $40,000 | $38,750 | $15,800 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $3,250.00 | $5,500.00 | $20,000 | $45,000 | $19,000 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $2,650.00 | $5,304.00 | $30,000 | $33,850 | $15,300 |
| 4 | Road & drainage excavation (unclassified) (203-01) | CY | 17,737 | $10.00 | $10.00 | $17.60 | $29.75 | $36.00 |
| 5 | Borrow excavation (graded solid rock) (203-02.01) | TON | 850 | $30.15 | $27.00 | $31.00 | $49.00 | $52.00 |
| 6 | Borrow excavation (unclassified) (203-03) | CY | 2,254 | $18.60 | $22.00 | $21.50 | $25.00 | $76.00 |
| 7 | Placing and spreading topsoil (203-04) | CY | 3,103 | $4.58 | $9.00 | $20.00 | $11.00 | $30.00 |
| 8 | Undercutting (203-05) | CY | 482 | $19.75 | $20.00 | $30.00 | $34.25 | $57.00 |
| 9 | Furnishing & spreading topsoil (203-07) | CY | 1,284 | $28.75 | $40.00 | $20.00 | $85.00 | $94.00 |
| 10 | Foundation fill material (204-08) | CY | 126 | $70.50 | $60.00 | $75.00 | $78.00 | $130.00 |
| 11 | Backfill material (flowable fill) (204-08.01) | CY | 57 | $255.00 | $250.00 | $320.00 | $415.00 | $390.00 |
| 12 | Filter sock (12 inch) (209-03.21) | LF | 2,200 | $4.23 | $4.20 | $4.60 | $5.20 | $5.75 |
| 13 | Sediment removal (209-05) | CY | 98 | $38.00 | $12.00 | $30.00 | $20.00 | $23.00 |
| 14 | Temporary silt fence (with backing) (209-08.02) | LF | 235 | $6.05 | $6.50 | $6.80 | $7.15 | $7.00 |
| 15 | Sandbags (209-09.01) | BAG | 170 | $30.00 | $8.00 | $10.00 | $15.00 | $8.75 |
| 16 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 4 | $634.00 | $620.00 | $1,900.00 | $1,750.00 | $390.00 |
| 17 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 500 | $3.50 | $15.00 | $7.00 | $9.75 | $4.25 |
| 18 | Catch basin protection (type D) (209-40.33) | EACH | 5 | $237.75 | $235.00 | $260.00 | $575.00 | $520.00 |
| 19 | Catch basin filter assembly(type 4) (209-40.44) | EACH | 1 | $534.50 | $600.00 | $575.00 | $825.00 | $2,800.00 |
| 20 | Catch basin filter assembly(type 5) (209-40.45) | EACH | 1 | $667.00 | $700.00 | $715.00 | $825.00 | $3,100.00 |
| 21 | Temporary stream diversion (instream diversion) (209-65.01) | LS | 1 | $13,150 | $16,000 | $18,300 | $29,875 | $46,400 |
| 22 | Mineral aggregate, type A base, grading D (303-01) | TON | 12,266 | $25.50 | $29.00 | $26.00 | $34.00 | $29.00 |
| 23 | Granular backfill (roadway) (303-01.01) | TON | 887 | $24.20 | $42.00 | $27.00 | $50.50 | $55.00 |
| 24 | Mineral aggregate (size 57) (303-10.01) | TON | 88 | $89.00 | $49.00 | $41.00 | $57.00 | $110.00 |
| 25 | Mineral aggregate (size 4) (303-10.07) | TON | 57 | $36.00 | $49.00 | $41.00 | $70.00 | $85.00 |
| 26 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 1,804 | $104.50 | $120.00 | $112.00 | $110.00 | $120.00 |
| 27 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 1,183 | $128.00 | $140.00 | $142.00 | $136.00 | $150.00 |
| 28 | Bituminous material for prime coat (PC) (402-01) | TON | 2 | $1,350.00 | $1,400.00 | $1,600.00 | $1,525.00 | $1,500.00 |
| 29 | Aggregate for cover material (PC) (402-02) | TON | 6 | $185.00 | $200.00 | $318.12 | $310.00 | $210.00 |
| 30 | Bituminous material for tack coat (TC) (403-01) | TON | 24 | $1,000.00 | $1,200.00 | $1,250.00 | $1,145.00 | $1,100.00 |
| 31 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 356 | $120.00 | $160.00 | $170.00 | $159.35 | $140.00 |
| 32 | Acs mix(PG70-22) grading D (411-02.10) | TON | 1,941 | $140.00 | $155.00 | $166.00 | $159.15 | $160.00 |
| 33 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 1.89 | $4,658.00 | $1,050.00 | $5,145.00 | $2,145.00 | $4,900.00 |
| 34 | Cold planing bituminous pavement (415-01.01) | TON | 980 | $65.00 | $50.00 | $41.00 | $68.00 | $71.00 |
| 35 | Class A concrete (roadway) (604-01.01) | CY | 5 | $2,103.00 | $3,100.00 | $1,465.00 | $2,185.00 | $4,500.00 |
| 36 | Steel bar reinforcement (roadway) (604-01.02) | LB | 753 | $0.85 | $5.25 | $4.00 | $4.35 | $3.50 |
| 37 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 250 | $130.00 | $110.00 | $147.00 | $245.00 | $140.00 |
| 38 | Precast concrete box culvert (6' X 3') (607-50.12) | LF | 258 | $612.00 | $760.00 | $1,050.00 | $1,355.00 | $3,900.00 |
| 39 | Adjustment of existing catchbasin (611-09.01) | EACH | 2 | $2,379.00 | $2,315.00 | $2,800.00 | $1,995.00 | $5,000.00 |
| 40 | Capping existing catchbasin (611-09.03) | EACH | 2 | $929.00 | $1,825.00 | $2,550.00 | $2,125.00 | $4,200.00 |
| 41 | Catch basins, type 39, > 4' - 8' depth (611-39.02) | EACH | 1 | $7,520.00 | $10,500 | $8,750.00 | $12,350 | $16,800 |
| 42 | Catch basins, type 39, > 8' - 12' depth (611-39.03) | EACH | 1 | $16,750 | $22,000 | $20,700 | $39,875 | $31,000 |
| 43 | 18" temporary drainage pipe (621-03.02) | LF | 270 | $62.00 | $75.00 | $80.00 | $49.00 | $69.00 |
| 44 | High-visibility construction fence (707-08.11) | LF | 1,900 | $3.20 | $3.25 | $4.00 | $3.75 | $3.50 |
| 45 | Machined rip-rap (class A-3) (709-05.05) | TON | 166 | $46.50 | $48.00 | $40.00 | $68.00 | $82.00 |
| 46 | Machined rip-rap (class A-1) (709-05.06) | TON | 76 | $44.00 | $48.00 | $40.00 | $73.00 | $84.00 |
| 47 | Traffic control (712-01) | LS | 1 | $34,000 | $55,000 | $68,200 | $71,950 | $500,000 |
| 48 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 6,750 | $19.00 | $25.00 | $25.00 | $47.50 | $56.00 |
| 49 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 8 | $380.00 | $5,600.00 | $8,600.00 | $6,345.00 | $5,800.00 |
| 50 | Flexible drums (channelizing) (712-04.01) | EACH | 200 | $23.25 | $33.00 | $35.00 | $40.00 | $34.00 |
| 51 | Barrier rail delineator (712-04.50) | EACH | 338 | $10.75 | $7.50 | $10.00 | $8.55 | $7.75 |
| 52 | Warning lights (type A) (712-05.01) | EACH | 40 | $21.00 | $13.00 | $11.50 | $16.35 | $14.00 |
| 53 | Signs (construction) (712-06) | SF | 1,337 | $8.40 | $7.40 | $8.60 | $8.40 | $7.75 |
| 54 | Arrow board (type C) (712-08.03) | EACH | 4 | $1,261.00 | $1,200.00 | $1,200.00 | $1,300.00 | $1,200.00 |
| 55 | Speed feedback sign assembly (712-08.08) | EACH | 2 | $5,044.00 | $5,200.00 | $5,650.00 | $5,675.00 | $5,400.00 |
| 56 | Digital speed limit sign assembly (712-08.09) | EACH | 12 | $5,044.00 | $3,500.00 | $5,650.00 | $5,600.00 | $5,400.00 |
| 57 | Temporary transverse rumble strips (712-10.02) | LF | 480 | $8.00 | $47.00 | $8.75 | $4.25 | $10.00 |
| 58 | Metal barricade (type III) (713-15.35) | EACH | 8 | $719.80 | $700.00 | $1,200.00 | $700.00 | $660.00 |
| 59 | Changeable message sign unit (713-16.01) | EACH | 2 | $5,045.00 | $6,050.00 | $5,700.00 | $6,100.00 | $6,300.00 |
| 60 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 65 | $66.60 | $88.00 | $75.00 | $72.55 | $71.00 |
| 61 | Removal of snowplowable reflective marker (716-01.30) | EACH | 65 | $15.50 | $26.00 | $17.00 | $20.00 | $17.00 |
| 62 | Painted pavement marking (6" line) (716-05.20) | LM | 1.24 | $2,846.00 | $3,000.00 | $3,200.00 | $3,500.00 | $3,000.00 |
| 63 | Painted pavement markings(8" line) (716-05.49) | LM | 5.28 | $1,255.25 | $1,900.00 | $1,400.00 | $1,445.00 | $1,400.00 |
| 64 | Removal of pavement marking (line) (716-08.20) | LM | 0.74 | $3,545.00 | $5,700.00 | $4,000.00 | $4,000.00 | $3,800.00 |
| 65 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 2.13 | $8,540.00 | $8,900.00 | $9,500.00 | $10,895 | $9,000.00 |
| 66 | Mobilization (717-01) | LS | 1 | $67,000 | $60,000 | $155,000 | $81,500 | $560,000 |
| 67 | Geotextile (type III)(erosion control) (740-10.03) | SY | 829 | $3.45 | $3.40 | $6.10 | $4.25 | $2.00 |
| 68 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 579 | $2.40 | $4.50 | $4.80 | $5.08 | $2.75 |
| 69 | Temporary sediment tube 12IN (740-11.02) | LF | 1,080 | $4.23 | $4.25 | $4.60 | $5.10 | $3.75 |
| 70 | Special wetland seed mixture (801-01.36) | UNIT | 2.50 | $335.00 | $335.00 | $365.00 | $400.00 | $550.00 |
| 71 | Temporary seeding (without mulch) (801-02.08) | UNIT | 474 | $37.00 | $38.00 | $40.00 | $41.00 | $44.00 |
| 72 | Water (seeding & sodding) (801-03) | MG | 377 | $79.22 | $80.00 | $85.00 | $88.00 | $55.00 |
| 73 | Sodding (new sod) (803-01) | SY | 32,904 | $5.80 | $5.75 | $6.30 | $6.11 | $6.50 |
| 74 | Erosion control blanket (type I) (805-12.01) | SY | 35,009 | $0.85 | $0.75 | $1.00 | $1.02 | $1.00 |
| 75 | 700 gram coir fiber erosion blanket (805-12.08) | SY | 280 | $6.34 | $10.00 | $6.90 | $7.00 | $9.25 |
| 76 | Project mowing (806-02.03) | CYCL | 1 | $1,580.00 | $1,585.00 | $1,150.00 | $2,500.00 | $2,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.