TDOT contract CN261038 bid tabulation

The resurfacing on s.r. 139 from the sevier county line (l.m. 0.00) to s.r. 92 (l.m. 7.97). Let by Tennessee DOT on May 8, 2026, Jefferson County. 2 bids received; low bid $1,248,046 by Charles Blalock & Sons, Inc..

Owner
Tennessee DOT
Letting
08 MAY 2026
Pay items
14
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Charles Blalock & Sons, Inc.$1,248,046Low
2PRI of East Tennessee Inc.$1,638,567+31%
TDOT contract CN261038: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Charles Blalock & Sons, Inc.2. PRI of East Tennessee Inc.
1Brooming & degrassing shoulders (208-01.05)LM16$300.00$2,200.00
2Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON1,082$125.00$175.00
3Bituminous material for tack coat (TC) (403-01)TON87$600.00$1,100.00
4Acs mix(PG70-22) thin lift D asphalt (411-03.13)TON5,408$152.00$195.00
5Cold planing bituminous pavement (415-01.02)SY760$5.00$25.00
6Traffic control (712-01)LS1$40,000$43,950
7Signs (construction) (712-06)SF1,138$7.25$7.45
8Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH638$38.00$38.00
9Removal of snowplowable reflective marker (716-01.30)EACH638$7.50$7.50
10Plastic pavement marking (stop line) (716-02.05)LF12$10.00$10.00
11Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF360$28.00$28.00
12Painted pavement marking (6" line) (716-05.20)LM13$1,100.00$1,100.00
13Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM32$2,850.00$3,400.00
14Mobilization (717-01)LS1$37,000$30,000
TDOT contract CN261038: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy