TDOT contract CNZ123 bid tabulation

The stream mitigation and dam removal of pistol creek dam in alcoa. Let by Tennessee DOT on March 21, 2025, Blount County. 4 bids received; low bid $560,847 by Marcum Excavating, Inc..

Owner
Tennessee DOT
Letting
21 MAR 2025
Pay items
42
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Marcum Excavating, Inc.$560,847Low
2Charles Blalock & Sons, Inc.$596,970+6.0%
3Summers-Taylor, Inc.$989,842+76%
4HGS, LLC$1,126,862+101%
TDOT contract CNZ123: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Marcum Excavating, Inc.2. Charles Blalock & Sons, Inc.3. Summers-Taylor, Inc.4. HGS, LLC
1Construction stakes, lines and grades (105-01)LS1$20,000$25,059$19,993$31,109
2Clearing and grubbing (201-01)LS1$30,000$75,000$113,500$69,956
3Removal of structures (existing dam structure) (202-04.01)LS1$200,000$125,000$113,500$190,006
4Road & drainage excavation (unclassified) (203-01)CY20$150.00$40.00$400.00$87.49
5Road & drainage excavation (stream mitigation) (203-01.13)CY1,083$60.00$40.00$242.00$231.10
6Water (203-06)MG1$800.00$1,000.00$1,200.00$311.09
7Stream mitigation-coconut fiber rolls (209-03.31)LF300$40.00$15.00$55.00$17.50
8Stream mitigation -J -hook (209-03.38)EACH3$8,000.00$6,000.00$22,250$16,411
9Temporary silt fence (with backing) (209-08.02)LF715$7.00$7.00$7.00$11.67
10Temporary silt fence (without backing) (209-08.03)LF920$3.50$5.00$4.00$5.60
11Turbidity curtain(floating trubidity curtain below dam) (209-13.04)LF170$50.00$60.00$66.00$126.21
12Mineral aggregate, type A base, grading D (303-01)TON686$50.00$98.50$83.00$101.69
13Mineral aggregate (size 57) (303-10.01)TON110$60.00$98.50$165.00$187.31
14Acs mix(PG64-22) grading D (411-01.10)TON6$800.00$800.00$755.00$874.93
1524" pipe culvert (607-05.30)LF40$100.00$250.00$355.00$233.92
1615" temporary drainage pipe (621-03.01)LF72$70.00$250.00$530.00$138.43
17High-visibility construction fence (707-08.11)LF330$5.00$6.00$5.00$7.00
18Machined rip-rap (class A-3) (709-05.05)TON60$90.00$95.00$250.00$159.08
19Machined rip-rap (class A-1) (709-05.06)TON220$90.00$95.00$255.00$171.60
20Traffic control (712-01)LS1$2,000.00$40,000$15,000$34,997
21Signs (construction) (712-06)SF104$38.46$10.45$11.00$16.43
22Mobilization (717-01)LS1$50,000$59,000$90,000$226,061
23Geotextile (type III)(erosion control) (740-10.03)SY60$20.00$8.00$5.00$9.92
24Temporary sediment tube 12IN (740-11.02)LF1,500$5.75$5.00$14.00$12.91
25Temporary seeding (with mulch) (801-01.07)UNIT20$110.00$150.00$60.00$77.77
26Grass seed mix (ripzn/FLPL) W/mulch (801-01.35)UNIT20$250.00$184.00$120.00$155.54
27Fertilizer (801-02.15)TON0.30$1,850.00$2,300.00$3,000.00$4,736.30
28Water (seeding & sodding) (801-03)MG2$600.00$115.00$182.00$233.32
29Cuttings: salix nigra (18IN-24IN length) (802-02.30)EACH254$7.00$9.20$12.00$15.55
30Cuttings: sambucus canadensis (18IN-24IN) (802-02.33)EACH254$13.00$9.20$12.00$15.55
31Cuttings: salix interior (18IN-24IN) (802-02.34)EACH254$13.00$9.20$12.00$15.55
32Cuttings: alnus serrulata (18IN-24IN) (802-02.37)EACH254$13.00$9.20$12.00$15.55
33Acer negundo (box elder 2-5FT CNTNR GRWN) (802-11.01)EACH12$84.00$86.25$73.00$93.33
34Diospyros virginiana (persimmon 2-5FT CNTNR GRWN) (802-11.14)EACH12$84.00$86.25$73.00$93.33
35Liriodendron tulipifera (tulip poplar 2-5FT CNTNR GRWN) (802-11.19)EACH12$84.00$86.25$73.00$93.33
36Platanus occidentalis (sycamore 2-5FT CNTNR GRWN) (802-11.26)EACH12$84.00$86.25$73.00$93.33
37Ulmus americana (american elm 2-5FT CNTNR GRWN) (802-11.44)EACH18$78.00$86.25$70.00$89.44
38Carpinus caroliniana (american hornbeam 2-5FT container GR) (802-11.45)EACH18$69.00$86.25$60.00$77.77
39Quercus pagoda (cherrybark oak seedling B.R.) (802-12.53)EACH12$68.00$46.00$12.00$15.55
40Celtis laevigata (sugarberry seedling B.R.) (802-13.76)EACH12$41.00$46.00$12.00$15.55
41Cornus amomum (silky dogwood 3FT live stakes) (802-16.04)EACH254$13.00$9.20$12.00$15.55
42700 gram coir fiber erosion blanket (805-12.08)SY1,000$10.00$9.00$10.00$12.58
TDOT contract CNZ123: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy