TDOT contract CN261064 bid tabulation
The grading, drainage, construction of bridges and a retaining wall, signals, and paving on a s.i.a. route serving eastman chemical company. Let by Tennessee DOT on October 2, 2026, Sullivan County. 1 bid received; low bid $23,131,389 by Summers-Taylor, Inc..
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 274
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Summers-Taylor, Inc. | $23,131,389 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Summers-Taylor, Inc. |
|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $194,700 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $245,679 |
| 3 | Removal of pipe (see plans sheet 2F1) (202-01.13) | LF | 713 | $33.71 |
| 4 | Removal of structures and obstructions (202-01.50) | EACH | 16 | $954.74 |
| 5 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 600 | $11.36 |
| 6 | Removal of curb (existing roundabout) (202-08.10) | LF | 800 | $8.52 |
| 7 | Removal of curb and gutter (existing roundabout) (202-08.15) | LF | 1,500 | $5.12 |
| 8 | Road & drainage excavation (unclassified) (203-01) | CY | 88,915 | $15.45 |
| 9 | Borrow excavation (graded solid rock) (203-02.01) | TON | 42,423 | $47.08 |
| 10 | Borrow excavation (unclassified) (203-03) | CY | 10,138 | $16.75 |
| 11 | Placing and spreading topsoil (203-04) | CY | 9,185 | $28.33 |
| 12 | Water (203-06) | MG | 520 | $13.76 |
| 13 | Construction of haul road (203-50) | LS | 1 | $900,000 |
| 14 | Culvert excavation (unclassified) (204-01) | CY | 200 | $53.98 |
| 15 | Backfill material (flowable fill) (204-08.01) | CY | 125 | $472.30 |
| 16 | Brooming & degrassing shoulders (208-01.05) | LM | 0.36 | $11,382 |
| 17 | 18" temporary slope drain (209-02.07) | LF | 200 | $80.99 |
| 18 | Sediment removal (209-05) | CY | 650 | $40.65 |
| 19 | Temporary silt fence (with backing) (209-08.02) | LF | 19,000 | $6.52 |
| 20 | Rock check dam (209-08.07) | EACH | 100 | $740.70 |
| 21 | Enhanced rock check dam (209-08.08) | EACH | 12 | $1,359.63 |
| 22 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 4 | $3,358.50 |
| 23 | Catch basin filter assembly(type 6) (209-40.46) | EACH | 53 | $896.71 |
| 24 | Catch basin filter assembly(type 7) (209-40.47) | EACH | 6 | $944.85 |
| 25 | Temporary in stream diversion (209-65.04) | LF | 370 | $65.46 |
| 26 | Mineral aggregate, type A base, grading D (303-01) | TON | 20,000 | $45.19 |
| 27 | Granular backfill (roadway) (303-01.01) | TON | 900 | $69.08 |
| 28 | Mineral aggregate (size 57) (303-10.01) | TON | 100 | $92.15 |
| 29 | Mineral aggregate (size 4) (303-10.07) | TON | 4,551 | $60.96 |
| 30 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 5,000 | $165.00 |
| 31 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 3,800 | $175.00 |
| 32 | Bituminous material for tack coat (TC) (403-01) | TON | 30 | $1,350.00 |
| 33 | Acs mix(PG64-22) grading D (411-01.10) | TON | 2,700 | $199.50 |
| 34 | Cold planing bituminous pavement (415-01.02) | SY | 6,000 | $12.00 |
| 35 | Portland cement concrete pavement (plain) 8" (501-01.01) | SY | 280 | $158.22 |
| 36 | Class A concrete (roadway) (604-01.01) | CY | 76 | $1,878.96 |
| 37 | Steel bar reinforcement (roadway) (604-01.02) | LB | 16,700 | $0.92 |
| 38 | Retaining wall (R1, sta. 113+18.00 to sta. 118+60.00 RT riverport road) (604-07.01) | SF | 2,200 | $301.04 |
| 39 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 4,447 | $126.88 |
| 40 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 44 | $220.68 |
| 41 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 238 | $241.91 |
| 42 | Class A concrete (pipe endwalls) (611-07.01) | CY | 20 | $2,404.94 |
| 43 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 1,200 | $1.47 |
| 44 | 30IN endwall (cross drain) 4:1 (611-07.61) | EACH | 1 | $11,335 |
| 45 | Catch basins, type 12, 0' - 4' depth (611-12.01) | EACH | 26 | $6,858.49 |
| 46 | Catch basins, type 12, > 4' - 8' depth (611-12.02) | EACH | 26 | $7,416.50 |
| 47 | Catch basins, type 12, > 8' - 12' depth (611-12.03) | EACH | 1 | $11,575 |
| 48 | Catch basins, type 14, > 4' - 8' depth (611-14.02) | EACH | 6 | $13,239 |
| 49 | 72" temporary drainage pipe (621-03.11) | LF | 780 | $228.77 |
| 50 | Concrete sidewalk (4 ") (701-01.01) | SF | 5,000 | $15.41 |
| 51 | Concrete curb ramp (retrofit) (701-02.01) | SF | 150 | $43.92 |
| 52 | Concrete curb ramp (701-02.03) | SF | 1,000 | $45.69 |
| 53 | Concrete median pavement (701-03) | CY | 30 | $1,046.71 |
| 54 | Concrete curb (702-01) | CY | 60 | $767.62 |
| 55 | Concrete combined curb & gutter (702-03) | CY | 1,200 | $495.70 |
| 56 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 2 | $1,266.12 |
| 57 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 2,539 | $35.45 |
| 58 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 395 | $41.78 |
| 59 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,424.39 |
| 60 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 10 | $4,463.09 |
| 61 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 8 | $3,931.31 |
| 62 | Guardrail removed (706-01) | LF | 590 | $3.80 |
| 63 | Radius rail (706-06.03) | LF | 100 | $44.31 |
| 64 | Chain link fence (6 foot) (707-01.11) | LF | 600 | $36.18 |
| 65 | Gate - chain-link fence-6 foot (tract 18 access control) (707-01.13) | EACH | 2 | $2,584.46 |
| 66 | Removal of fence (tracts 4 & 18) (707-06.01) | LF | 1,910 | $12.92 |
| 67 | Removal of gate (tract 4 sta. 54+30 LT.) (707-06.02) | EACH | 1 | $646.11 |
| 68 | High-visibility construction fence (707-08.11) | LF | 1,910 | $3.39 |
| 69 | Machined rip-rap (class A-3) (709-05.05) | TON | 101 | $87.69 |
| 70 | Machined rip-rap (class A-1) (709-05.06) | TON | 130 | $180.07 |
| 71 | Machined rip-rap (class B) (709-05.08) | TON | 2,359 | $73.83 |
| 72 | Machined rip-rap (class C) (709-05.09) | TON | 225 | $79.57 |
| 73 | Traffic control (712-01) | LS | 1 | $150,000 |
| 74 | Interconnected portable barrier rail (712-02.02) | LF | 3,100 | $70.00 |
| 75 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 6 | $20,839 |
| 76 | Flexible drums (channelizing) (712-04.01) | EACH | 200 | $41.27 |
| 77 | Barrier rail delineator (712-04.50) | EACH | 40 | $19.42 |
| 78 | Warning lights (type A) (712-05.01) | EACH | 100 | $38.52 |
| 79 | Signs (construction) (712-06) | SF | 513 | $11.35 |
| 80 | Temporary barricades (type III) (712-07.03) | LF | 400 | $13.76 |
| 81 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 1,800 | $4.75 |
| 82 | Sign post delineation enhancement (713-02.21) | LF | 42 | $10.03 |
| 83 | "U" section steel posts (713-11.01) | LB | 350 | $5.01 |
| 84 | Perforated/knockout square tube post (713-11.02) | LB | 1,000 | $11.91 |
| 85 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 400 | $24.13 |
| 86 | Street name sign (rigid 0.100IN thick (713-14.21) | SF | 72 | $43.87 |
| 87 | Removal of signs, posts and footings (713-15) | LS | 1 | $2,506.93 |
| 88 | Metal barricade (type III) (713-15.35) | EACH | 4 | $1,190.79 |
| 89 | Changeable message sign unit (713-16.01) | EACH | 2 | $11,030 |
| 90 | Signs (R10-12A, (30"X36") (713-16.20) | EACH | 2 | $313.37 |
| 91 | Remove conductor (714-01.69) | LF | 1,575 | $1.90 |
| 92 | Jacked or bored conduit (714-03) | LF | 220 | $206.47 |
| 93 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 6,125 | $17.09 |
| 94 | Direct burial conduit (3" PVC, schedule 40) (714-03.02) | LF | 1,940 | $23.42 |
| 95 | Pull boxes (type C) (714-05.04) | EACH | 22 | $1,133.18 |
| 96 | Foundation for light standards - roadway (post top) (714-08.28) | EACH | 23 | $2,494.26 |
| 97 | Removal of light standard & foundation (714-08.32) | EACH | 5 | $734.35 |
| 98 | LED luminaires (relocate existing) (714-09.47) | EACH | 1 | $5,134.13 |
| 99 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 17 | $37.98 |
| 100 | Plastic pavement marking (stop line) (716-02.05) | LF | 200 | $14.56 |
| 101 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 14 | $234.23 |
| 102 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 740 | $3.48 |
| 103 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 250 | $37.35 |
| 104 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 6 | $265.89 |
| 105 | Plastic pavement marking (yield line) (716-04.12) | SF | 80 | $24.69 |
| 106 | Painted pavement marking (6" line) (716-05.20) | LM | 3 | $2,215.71 |
| 107 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 8 | $8,166.50 |
| 108 | Mobilization (717-01) | LS | 1 | $850,000 |
| 109 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 9 | $1,880.19 |
| 110 | Signal head assembly (140 A4F with backplate) (730-02.59) | EACH | 2 | $2,456.28 |
| 111 | Install pull box (type B) (730-03.21) | EACH | 4 | $1,525.68 |
| 112 | Electrical service connection (730-05.01) | EACH | 1 | $10,091 |
| 113 | Signal cable - 5 conductor (730-08.02) | LF | 600 | $4.56 |
| 114 | Signal cable - 7 conductor (730-08.03) | LF | 1,675 | $5.57 |
| 115 | Signal cable - 9 conductor (730-08.04) | LF | 150 | $8.86 |
| 116 | Conduit 2" diameter (directional bore) (730-12.23) | LF | 675 | $81.03 |
| 117 | Conduit 2" diameter (PVC schedule 80) (730-12.26) | LF | 125 | $30.39 |
| 118 | Conduit 3" diameter (PVC schedule 80) (730-12.27) | LF | 20 | $45.58 |
| 119 | Vehicle detector (video) (730-13.02) | EACH | 4 | $14,244 |
| 120 | Cabinet (TS2, type 1 (base mounted) (730-15.07) | EACH | 1 | $35,388 |
| 121 | Controller (atc) (730-16.04) | EACH | 1 | $8,660.28 |
| 122 | Install modem (730-17.01) | EACH | 1 | $4,836.59 |
| 123 | Pedestal pole (type A) (730-23.28) | EACH | 1 | $5,229.09 |
| 124 | Cantilever signal support (1 arm @ 30') (730-23.64) | EACH | 1 | $40,453 |
| 125 | Cantilever signal support (1 arm @ 40') (730-23.80) | EACH | 1 | $41,149 |
| 126 | Cantilever signal support (1 arm @ 55') (730-25.07) | EACH | 1 | $52,164 |
| 127 | Cantilever signal support (1 arm @ 60') (730-25.11) | EACH | 1 | $57,419 |
| 128 | Pedestrian pushbutton post (730-26.06) | EACH | 1 | $3,196.97 |
| 129 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 4 | $2,437.29 |
| 130 | Battery back-UP system (730-35.06) | EACH | 1 | $12,851 |
| 131 | Temporary traffic signal system (730-40.02) | LS | 1 | $51,378 |
| 132 | Geotextile (type III)(erosion control) (740-10.03) | SY | 8,622 | $7.75 |
| 133 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 15,541 | $7.97 |
| 134 | Temporary sediment tube 18IN (740-11.03) | LF | 646 | $13.77 |
| 135 | Seeding (with mulch) (801-01) | UNIT | 100 | $76.74 |
| 136 | Temporary seeding (with mulch) (801-01.07) | UNIT | 500 | $38.37 |
| 137 | Special wetland seed mixture (801-01.36) | UNIT | 6 | $402.90 |
| 138 | Seeding (without mulch) (801-02) | UNIT | 400 | $35.17 |
| 139 | Water (seeding & sodding) (801-03) | MG | 100 | $191.86 |
| 140 | Seed (supplemental application) (801-07) | LB | 300 | $6.40 |
| 141 | Sodding (new sod) (803-01) | SY | 19,930 | $7.03 |
| 142 | Turf reinforcement mat (class I) (805-01.01) | SY | 5,000 | $5.88 |
| 143 | Erosion control blanket (type II) (805-12.02) | SY | 32,000 | $1.15 |
| 144 | Dry excavation (bridges) (204-02.01) | CY | 381 | $26.23 |
| 145 | Wet excavation (bridges) (204-03.01) | CY | 201 | $63.80 |
| 146 | Rock excavation (bridges) (204-04.01) | CY | 52 | $326.99 |
| 147 | Rock drilling (bridges) (204-05) | LF | 108 | $59.04 |
| 148 | Foundation preparation(bent no.1, sta. 36+25.00) (204-10.01) | LS | 1 | $34,711 |
| 149 | Foundation preparation(pier no.1, sta. 73+15.70) (204-10.02) | LS | 1 | $97,946 |
| 150 | Foundation preparation(bent no.2, sta. 37+05.50) (204-10.03) | LS | 1 | $66,118 |
| 151 | Foundation preparation(pier no.2, sta. 73+75.70) (204-10.04) | LS | 1 | $122,763 |
| 152 | Core drilling for piles(rock) (204-14) | LF | 200 | $672.13 |
| 153 | Granular backfill (bridges) (303-01.02) | TON | 141 | $102.23 |
| 154 | Epoxy coated reinforcing steel (604-02.03) | LB | 213,888 | $1.83 |
| 155 | Class A concrete (bridges) (604-03.01) | CY | 694 | $2,033.29 |
| 156 | Steel bar reinforcement (bridges) (604-03.02) | LB | 120,375 | $1.97 |
| 157 | Pavement @ bridge ends (604-03.04) | SY | 444 | $497.45 |
| 158 | Class DS concrete (604-03.32) | CY | 523 | $1,751.94 |
| 159 | Applied texture finish (new structures) (604-04.01) | SY | 1,813 | $16.92 |
| 160 | Bridge deck grooving (mechanical) (604-05.31) | SY | 1,767 | $7.56 |
| 161 | Steel piles (12 inch) (606-03.03) | LF | 500 | $186.42 |
| 162 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 19 | $189.75 |
| 163 | Deck drains (grate drains type 2) (610-10.45) | EACH | 6 | $3,434.69 |
| 164 | Prestressed concrete I-beam (type III) (615-01.03) | LF | 868 | $471.79 |
| 165 | Prestressed concrete box beam (27" X 48") (615-02.10) | LF | 986 | $630.23 |
| 166 | Standard concrete classic parapet rail (620-05.02) | LF | 823 | $425.09 |
| 167 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 236 | $40.80 |
| 168 | 6" pipe underdrain (710-09.02) | LF | 84 | $29.55 |
| 169 | Pole 45FT class 2 wood (790-04.02) | EACH | 2 | $2,665.19 |
| 170 | Pole 45FT class 3 wood (790-04.03) | EACH | 5 | $2,495.00 |
| 171 | Pole 55FT class 1 wood (790-06.01) | EACH | 4 | $3,538.82 |
| 172 | Pole 55FT class 2 wood (790-06.02) | EACH | 2 | $3,381.73 |
| 173 | 3PH crossarm 25KV (790-26.01) | EACH | 1 | $1,646.65 |
| 174 | 3PH crossarm DBL SM angle 25KV (790-26.12) | EACH | 4 | $2,392.55 |
| 175 | 3PH crossarm DBL 10FT SM angle 25KV (790-26.14) | EACH | 1 | $2,808.27 |
| 176 | 3PH xarm DBL 10FT LRG cond SM angle 25KV (790-26.15) | EACH | 3 | $2,862.10 |
| 177 | 3PH crossarm dde 25KV (790-26.25) | EACH | 4 | $3,398.34 |
| 178 | 3PH crossarm DBL dde 25KV (790-26.27) | EACH | 2 | $4,093.64 |
| 179 | Service assembly-pole type (790-31.02) | EACH | 6 | $238.27 |
| 180 | Service conductor 2 AL triplex (790-31.11) | LF | 78 | $7.41 |
| 181 | Down guy - through bolt type (790-32.01) | EACH | 13 | $400.33 |
| 182 | Down guy - insulated (790-32.06) | EACH | 13 | $519.16 |
| 183 | OH guy - through bolt type (790-32.07) | EACH | 1 | $739.54 |
| 184 | Guy guard (790-32.23) | EACH | 11 | $25.57 |
| 185 | Overhead guy light construction - preform (790-32.27) | EACH | 1 | $715.65 |
| 186 | Screw type anchor 23,000LB (F1-5D-P) (790-33.31) | EACH | 11 | $807.91 |
| 187 | Transfer - light assembly (790-36.10) | EACH | 1 | $489.63 |
| 188 | Switch-900A-underslung (three phase) (790-36.21) | EACH | 1 | $5,655.76 |
| 189 | OH cond 2 7/1 acsr sparate (790-40.02) | LF | 1,370 | $3.33 |
| 190 | OH cond 1/0 6/1 acsr raven (790-40.03) | LF | 4,110 | $4.16 |
| 191 | OH cond 4/0 6/1 acsr penguin (790-40.06) | LF | 883 | $5.64 |
| 192 | OH cond 556.5 19 aac dahlia (790-40.46) | LF | 2,649 | $9.46 |
| 193 | UG pri cond 4/0 AL 25KV (790-41.16) | LF | 2,121 | $23.71 |
| 194 | 4IN dia PVC pipe (790-42.10) | LF | 3,868 | $18.57 |
| 195 | 4 duct bank @ 36IN-48IN depth (790-42.19) | LF | 1,040 | $52.66 |
| 196 | Deadbreak elbow 600A 25KV (790-43.29) | EACH | 12 | $1,237.87 |
| 197 | Primary pullbox (790-43.47) | EACH | 4 | $10,184 |
| 198 | 3PH transformer pad - ground sleeve (790-51.07) | EACH | 1 | $7,507.11 |
| 199 | 1PH fuse cutout xarm mount 25KV (790-61.01) | EACH | 1 | $946.22 |
| 200 | Pole ground rod type (790-68.01) | EACH | 8 | $443.97 |
| 201 | SGL phase mounting bracket - fiberglass (790-68.13) | EACH | 1 | $297.19 |
| 202 | Arm pin (790-69.32) | EACH | 9 | $238.52 |
| 203 | Remove wire (790-98.01) | LF | 12,384 | $2.86 |
| 204 | Remove poles (790-98.02) | EACH | 13 | $761.08 |
| 205 | Remove framing/associated apparatus (790-98.03) | EACH | 68 | $475.67 |
| 206 | <=2 in PE temp. by-pass for tie-in (791-02.27) | LS | 1 | $21,936 |
| 207 | 4IN HDPE gas main (791-03.04) | LF | 297 | $94.01 |
| 208 | HDD 2IN PE pipe - rock (791-04.11) | LF | 764 | $188.02 |
| 209 | HDD 4IN PE pipe - rock (791-04.13) | LF | 66 | $431.19 |
| 210 | Connect to 2IN EX. PE main (791-06.02) | EACH | 2 | $4,888.51 |
| 211 | Connect to 4IN EX. PE main (791-06.03) | EACH | 2 | $6,894.04 |
| 212 | 4IN PE gas valve assembly (791-07.02) | EACH | 1 | $2,506.93 |
| 213 | Retire gas main (791-10.10) | LS | 1 | $6,016.62 |
| 214 | Anchor 3/4IN (793-01.40) | EACH | 4 | $814.75 |
| 215 | Guy wire 10M or 3/8IN (793-02.08) | EACH | 9 | $188.02 |
| 216 | Install guy guard (793-02.99) | EACH | 9 | $46.38 |
| 217 | 25 pair group aerial splice (793-03.01) | EACH | 28 | $250.69 |
| 218 | 10M strand (793-03.03) | LF | 745 | $4.07 |
| 219 | 50 pair cable (793-03.12) | LF | 815 | $12.53 |
| 220 | Install strand bond (793-03.40) | EACH | 9 | $37.60 |
| 221 | Relash/delash cable (793-04.01) | LF | 200 | $5.01 |
| 222 | Ready access closure (793-04.06) | EACH | 6 | $564.06 |
| 223 | Transfer aerial cable (793-04.08) | EACH | 17 | $407.38 |
| 224 | Underground splice closure (793-04.12) | EACH | 4 | $1,880.19 |
| 225 | 48 fiber(material only) (793-07.04) | LF | 1,500 | $1.88 |
| 226 | 12-96 fiber(installation only) (793-07.16) | LF | 1,500 | $5.01 |
| 227 | Fiber optic maintenance loop (793-07.23) | EACH | 4 | $313.37 |
| 228 | Single fiber optic cable splice (793-07.25) | EACH | 120 | $94.01 |
| 229 | Fiber(48) aerial pressurized splice closure (793-07.73) | EACH | 2 | $1,065.45 |
| 230 | Test bare fiber (793-07.99) | EACH | 96 | $25.07 |
| 231 | Expose existing cable/conduit (all depths) (793-10.20) | LF | 60 | $125.35 |
| 232 | Buried riser guard (793-11.13) | EACH | 4 | $376.04 |
| 233 | Composite handhole 5FTX3FTX3FT (793-11.17) | EACH | 2 | $3,133.66 |
| 234 | Handhole 30INX48IN (793-11.20) | EACH | 2 | $2,757.62 |
| 235 | Remove handhole (793-11.31) | EACH | 3 | $501.39 |
| 236 | Rearrangement existing cable (793-12.02) | EACH | 10 | $2,256.23 |
| 237 | 200 pair UG cable (793-12.05) | LF | 1,060 | $25.07 |
| 238 | 25 pair group UG splice (793-13.06) | EACH | 17 | $250.69 |
| 239 | 1 duct formation @ 36IN depth (793-13.12) | LF | 230 | $50.14 |
| 240 | 2 duct formation @ 36IN depth (793-13.17) | LF | 900 | $62.67 |
| 241 | Sand encasement per duct (793-14.01) | LF | 660 | $10.03 |
| 242 | Concrete encasement per duct (793-14.02) | LF | 1,370 | $37.60 |
| 243 | Bridge conduit hanger system (793-14.09) | LS | 1 | $333,316 |
| 244 | 1 1/4IN innerduct (793-14.12) | LF | 2,760 | $3.76 |
| 245 | Laterally adjust conduit bank (793-14.41) | LF | 60 | $125.35 |
| 246 | Remove conduit/duct bank from existing cable (793-80.01) | LF | 8 | $125.35 |
| 247 | Remove aerial cable and wire (793-98.01) | LF | 6,300 | $2.51 |
| 248 | Remove poles all sizes (793-98.04) | EACH | 10 | $752.08 |
| 249 | Retire buried facilities in place (793-98.05) | LF | 530 | $1.88 |
| 250 | Remove anchor (any size) (793-98.08) | EACH | 4 | $125.35 |
| 251 | Remove down guy (793-98.09) | EACH | 7 | $94.01 |
| 252 | 12IN dip restrained joint water line (795-01.09) | LF | 520 | $252.63 |
| 253 | 16IN dip restrained joint water line (795-01.13) | LF | 320 | $330.21 |
| 254 | Connect to 12IN water line (795-06.07) | EACH | 2 | $20,440 |
| 255 | Connect to 16IN water line (795-06.09) | EACH | 2 | $22,098 |
| 256 | Cut and cap 12IN water line (795-06.37) | EACH | 2 | $7,211.39 |
| 257 | Cut and cap 16IN water line (795-06.39) | EACH | 2 | $8,137.13 |
| 258 | 12IN gate valve assembly (795-08.09) | EACH | 2 | $8,157.08 |
| 259 | 16IN butterfly valve assembly (795-08.13) | EACH | 2 | $10,578 |
| 260 | Removal of existing line 4" OD or greater (795-12.35) | LF | 630 | $65.54 |
| 261 | 30IN steel casing pipe open cut method (795-15.10) | LF | 115 | $552.88 |
| 262 | 3IN HDPE force main (797-02.05) | LF | 460 | $87.23 |
| 263 | 18IN dip gravity sewer 12FT-18FT depth (797-05.19) | LF | 233 | $365.75 |
| 264 | 18IN dip gravity sewer >18FT depth (797-05.20) | LF | 125 | $920.13 |
| 265 | 8IN PVC gravity sewer 0FT-6FT depth (797-05.51) | LF | 70 | $242.84 |
| 266 | Open cut 36IN steel casing pipe (797-06.95) | LF | 310 | $695.09 |
| 267 | 48IN manhole 4FT-6FT depth (797-07.02) | EACH | 2 | $6,180.42 |
| 268 | 60IN manhole 12FT-14FT depth (797-07.17) | EACH | 1 | $14,824 |
| 269 | 60IN manhole 24FT-28FT depth (797-07.21) | EACH | 1 | $43,963 |
| 270 | Manhole drop connection assembly (797-07.56) | EACH | 1 | $6,240.05 |
| 271 | Remove sewer manhole (797-07.80) | EACH | 2 | $5,092.88 |
| 272 | Connect to 3IN force main (797-10.15) | EACH | 1 | $5,841.68 |
| 273 | Retirein place existing sewer 15IN-24IN (797-11.32) | LF | 417 | $75.95 |
| 274 | By-pass pumping (797-11.38) | LS | 1 | $116,575 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.