TDOT contract CNZ320 bid tabulation

The resurfacing on u.s. 11e (s.r. 34) from near s.r. 36 (l.m. 20.00) to the sullivan county line (l.m. 23.79), including thin epoxy overlay on the bridge over knob creek. Let by Tennessee DOT on December 5, 2025, Washington County. 1 bid received; low bid $3,205,662 by Summers-Taylor, Inc..

Owner
Tennessee DOT
Letting
05 DEC 2025
Pay items
26
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Summers-Taylor, Inc.$3,205,662Low
TDOT contract CNZ320: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Summers-Taylor, Inc.
1Brooming & degrassing shoulders (208-01.05)LM12$1,810.00
2Mineral aggregate, type A base, grading D (303-01)TON1,068$65.00
3Asc mix (PG64-22) (BPMLC-HM) grading CS (307-01.15)TON1,537$180.00
4Bituminous material for tack coat (TC) (403-01)TON61$1,200.00
5Acs mix (PG64-22) grading E shoulder (411-01.07)TON1,887$159.00
6Acs mix(PG70-22) grading D (411-02.10)TON10,244$164.00
7Scoring shoulders (continuous) (16IN width) (411-12.01)LM2$7,750.00
8Cold planing bituminous pavement (415-01.02)SY14,105$8.50
9Traffic control (712-01)LS1$120,000
10Flexible drums (channelizing) (712-04.01)EACH314$35.50
11Warning lights (type A) (712-05.01)EACH157$28.00
12Signs (construction) (712-06)SF1,929$11.50
13Arrow board (type C) (712-08.03)EACH2$578.00
14Flexible delineator (white) (713-02.14)EACH6$48.50
15Plastic pavement marking(channelization striping) (716-02.04)SY180$30.50
16Plastic pavement marking (stop line) (716-02.05)LF540$11.00
17Plastic pavement marking (turn lane arrow) (716-02.06)EACH48$166.00
18Plastic pavement marking (longitudinal cross-walk) (716-02.09)LF1,202$31.00
19Plastic pavement marking(double turning arrow) (716-04.02)EACH1$250.00
20Plastic pavement marking (lane reduction arrow) (716-04.14)EACH1$277.00
21Painted pavement marking (6" line) (716-05.20)LM18$1,530.00
22Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM18$3,880.00
23Mobilization (717-01)LS1$115,000
24Saw slot (730-14.02)LF16,000$7.00
25Loop wire (730-14.03)LF32,000$1.00
26Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY1,195$64.00
TDOT contract CNZ320: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy