TDOT contract CN261079 bid tabulation
The construction of a concrete bulb-tee beam bridge on afg road over southern railway (l.m. 0.45), including grading, drainage, and paving. Let by Tennessee DOT on October 2, 2026, Hawkins County. 3 bids received; low bid $7,295,755 by Southern Constructors, Inc..
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 108
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Southern Constructors, Inc. | $7,295,755 | Low |
| 2 | Jones Bros. Contractors, LLC | $7,711,129 | +6.0% |
| 3 | Summers-Taylor, Inc. | $7,949,973 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Southern Constructors, Inc. | 2. Jones Bros. Contractors, LLC | 3. Summers-Taylor, Inc. |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $100,000 | $40,000 | $41,376 |
| 2 | Trainee (109-10.01) | HR | 1,100 | $0.80 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $70,000 | $90,000 | $69,774 |
| 4 | Removal of pipe (12" CMP, sta. 108+57) (202-01.13) | LF | 15 | $50.00 | $40.00 | $174.16 |
| 5 | Removal of pipe (15" CMP, sta. 108+77) (202-01.14) | LF | 38 | $50.00 | $30.00 | $68.75 |
| 6 | Removal of buildings tract no. 2) (202-06.01) | LS | 1 | $3,000.00 | $100.00 | $34,887 |
| 7 | Road & drainage excavation (unclassified) (203-01) | CY | 8,540 | $40.00 | $33.00 | $48.23 |
| 8 | Placing and spreading topsoil (203-04) | CY | 647 | $40.00 | $20.00 | $50.62 |
| 9 | Water (203-06) | MG | 32 | $125.00 | $1.00 | $29.86 |
| 10 | Furnishing & spreading topsoil (203-07) | CY | 74 | $100.00 | $30.00 | $67.83 |
| 11 | Brooming & degrassing shoulders (208-01.05) | LM | 0.10 | $1,500.00 | $100,000 | $16,572 |
| 12 | Sediment removal (209-05) | CY | 92 | $100.00 | $28.00 | $33.48 |
| 13 | Temporary silt fence (with backing) (209-08.02) | LF | 1,240 | $10.00 | $6.10 | $6.98 |
| 14 | Rock check dam (209-08.07) | EACH | 10 | $1,200.00 | $1,000.00 | $948.92 |
| 15 | Enhanced rock check dam (209-08.08) | EACH | 9 | $1,500.00 | $1,200.00 | $1,395.47 |
| 16 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,915 | $65.00 | $65.00 | $85.91 |
| 17 | Granular backfill (roadway) (303-01.01) | TON | 68 | $65.00 | $150.00 | $139.20 |
| 18 | Mineral aggregate (size 57) (303-10.01) | TON | 25 | $70.00 | $75.00 | $110.38 |
| 19 | Mineral aggregate (size varies) (303-10.04) | TON | 808 | $70.00 | $100.00 | $102.72 |
| 20 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 400 | $275.00 | $247.00 | $247.00 |
| 21 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 325 | $325.00 | $273.00 | $273.00 |
| 22 | Bituminous material for tack coat (TC) (403-01) | TON | 2 | $1,450.00 | $1,425.00 | $1,425.00 |
| 23 | Acs mix(PG70-22) grading D (411-02.10) | TON | 281 | $325.00 | $267.00 | $267.00 |
| 24 | Cold planing bituminous pavement (415-01.01) | TON | 80 | $325.00 | $265.00 | $265.00 |
| 25 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 14 | $350.00 | $195.00 | $335.19 |
| 26 | 30" pipe culvert (607-06.30) | LF | 21 | $350.00 | $340.00 | $360.40 |
| 27 | 18" pipe culvert (side drain) (607-39.02) | LF | 114 | $300.00 | $100.00 | $171.49 |
| 28 | Class A concrete (pipe endwalls) (611-07.01) | CY | 3 | $2,500.00 | $2,000.00 | $3,224.00 |
| 29 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 122 | $3.00 | $3.00 | $14.31 |
| 30 | 18IN endwall (side drain) (611-07.31) | EACH | 5 | $4,000.00 | $5,200.00 | $6,847.43 |
| 31 | Junction structure, 48IN round,> ('4' FT depth) (611-63.02) | EACH | 1 | $10,000 | $5,000.00 | $5,645.96 |
| 32 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 582 | $35.00 | $30.00 | $40.47 |
| 33 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $2,000.00 | $1,700.00 | $1,744.33 |
| 34 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 1 | $1,500.00 | $1,500.00 | $1,535.02 |
| 35 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 4 | $2,500.00 | $2,300.00 | $4,186.41 |
| 36 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 6 | $3,000.00 | $2,800.00 | $4,465.51 |
| 37 | Guardrail removed (706-01) | LF | 898 | $2.00 | $1.00 | $1.40 |
| 38 | Radius rail (706-06.03) | LF | 17 | $60.00 | $57.00 | $51.63 |
| 39 | High-visibility construction fence (707-08.11) | LF | 600 | $6.00 | $6.00 | $28.22 |
| 40 | Machined rip-rap (class A-3) (709-05.05) | TON | 50 | $100.00 | $75.00 | $155.29 |
| 41 | Machined rip-rap (class A-1) (709-05.06) | TON | 304 | $100.00 | $75.00 | $113.70 |
| 42 | Traffic control (712-01) | LS | 1 | $200,000 | $100,000 | $175,000 |
| 43 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 1,480 | $80.00 | $150.00 | $175.05 |
| 44 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 8 | $7,500.00 | $7,500.00 | $10,466 |
| 45 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $55.00 | $36.00 | $50.24 |
| 46 | Barrier rail delineator (712-04.50) | EACH | 68 | $40.00 | $8.00 | $11.16 |
| 47 | Warning lights (type A) (712-05.01) | EACH | 50 | $35.00 | $22.00 | $30.70 |
| 48 | Signs (construction) (712-06) | SF | 331 | $15.00 | $7.85 | $10.95 |
| 49 | Temporary barricades (type III) (712-07.03) | LF | 30 | $35.00 | $15.00 | $20.93 |
| 50 | Removable pavement marking (stop line) (712-09.04) | LF | 48 | $30.00 | $17.00 | $33.49 |
| 51 | Removable pavement marking (6" line) (712-09.08) | LF | 7,250 | $3.50 | $3.00 | $5.09 |
| 52 | Removable black-out tape (6") (712-09.30) | LF | 750 | $3.50 | $5.00 | $5.37 |
| 53 | Raised PVMT markers (BI-directional) (1 color lens) (716-01.11) | EACH | 72 | $15.00 | $15.00 | $20.93 |
| 54 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 16 | $100.00 | $220.00 | $139.55 |
| 55 | Painted pavement marking (6" line) (716-05.20) | LM | 1 | $2,500.00 | $1,900.00 | $3,837.54 |
| 56 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 1 | $9,000.00 | $6,600.00 | $8,721.69 |
| 57 | Mobilization (717-01) | LS | 1 | $700,000 | $765,000 | $625,000 |
| 58 | Temporary traffic signal system (730-40.02) | LS | 1 | $100,000 | $300,000 | $107,989 |
| 59 | Geomembrane (740-06.01) | SY | 117 | $115.00 | $12.00 | $42.24 |
| 60 | Geogrid reinforcement type 2 (740-07.04) | SY | 1,430 | $12.00 | $10.00 | $11.95 |
| 61 | Geotextile (type III)(erosion control) (740-10.03) | SY | 531 | $12.00 | $4.00 | $7.87 |
| 62 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 507 | $12.00 | $3.00 | $7.86 |
| 63 | Temporary sediment tube 12IN (740-11.02) | LF | 2,823 | $10.00 | $5.00 | $4.40 |
| 64 | Seeding (with mulch) (801-01) | UNIT | 1 | $550.00 | $250.00 | $697.73 |
| 65 | Seeding (without mulch) (801-02) | UNIT | 38 | $225.00 | $70.00 | $48.84 |
| 66 | Water (seeding & sodding) (801-03) | MG | 6.50 | $225.00 | $150.00 | $209.32 |
| 67 | Sodding (new sod) (803-01) | SY | 277 | $25.00 | $20.00 | $14.65 |
| 68 | Erosion control blanket (type II) (805-12.02) | SY | 3,268 | $6.00 | $1.50 | $1.74 |
| 69 | Removal of structures (exist. BR. no. 37-0A352-0.46) (202-04.01) | LS | 1 | $275,000 | $500,000 | $319,240 |
| 70 | Dry excavation (bridges) (204-02.01) | CY | 214 | $125.00 | $125.00 | $89.63 |
| 71 | Core drilling and sampling (204-05.01) | LF | 184 | $450.00 | $115.00 | $170.75 |
| 72 | Granular backfill (bridges) (303-01.02) | TON | 32 | $200.00 | $150.00 | $112.89 |
| 73 | Epoxy coated reinforcing steel (604-02.03) | LB | 101,237 | $2.25 | $2.50 | $2.68 |
| 74 | Class A concrete (bridges) (604-03.01) | CY | 293 | $1,600.00 | $2,000.00 | $2,710.30 |
| 75 | Steel bar reinforcement (bridges) (604-03.02) | LB | 66,898 | $3.00 | $2.00 | $3.27 |
| 76 | Pavement @ bridge ends (604-03.04) | SY | 204 | $650.00 | $600.00 | $814.30 |
| 77 | Class DS concrete (604-03.32) | CY | 281 | $1,800.00 | $1,750.00 | $2,349.22 |
| 78 | Applied texture finish (new structures) (604-04.01) | SY | 1,227 | $22.00 | $14.50 | $20.23 |
| 79 | Bridge deck grooving (mechanical) (604-05.31) | SY | 1,117 | $10.00 | $6.76 | $10.76 |
| 80 | Steel piles (10 inch) (606-02.03) | LF | 390 | $400.00 | $130.00 | $297.02 |
| 81 | Pile tips (steel piles, 10 inch) (606-02.06) | EACH | 24 | $500.00 | $300.00 | $208.65 |
| 82 | Drainage system - bridge deck(span no.3) (610-10.04) | LS | 1 | $45,000 | $50,000 | $22,835 |
| 83 | Prestressed concrete bulb tee beam (6" web)(BT-63) (615-01.11) | LF | 1,088 | $725.00 | $600.00 | $871.78 |
| 84 | Bridge deck crack sealing (617-02) | LF | 225 | $50.00 | $25.00 | $9.62 |
| 85 | Sealant (HMWM) (617-05) | GAL | 2 | $750.00 | $400.00 | $432.07 |
| 86 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 525 | $200.00 | $160.00 | $168.98 |
| 87 | Temporary shoring (621-05.02) | LS | 1 | $100,000 | $50,000 | $121,204 |
| 88 | Camera inspection - drilled shaft (dry) (625-01.10) | EACH | 4 | $4,000.00 | $1,500.00 | $8,372.83 |
| 89 | Drilled shaft-soil (12-0" dia.) (625-02.01) | VF | 33 | $5,000.00 | $10,000 | $1,542.49 |
| 90 | Drilled shaft-rock (8'-0" dia.) (625-02.13) | VF | 48 | $5,500.00 | $8,000.00 | $4,630.19 |
| 91 | Drilled shaft (SH-SCC) concrete (625-02.40) | CY | 90 | $2,500.00 | $1,000.00 | $993.09 |
| 92 | Chain-link fence (bridges) (707-07.01) | SF | 2,360 | $35.00 | $30.00 | $41.86 |
| 93 | Reinforced concrete slope pavement (709-04) | CY | 125 | $1,450.00 | $850.00 | $1,263.97 |
| 94 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 142 | $75.00 | $50.00 | $50.92 |
| 95 | 6" pipe underdrain (710-09.02) | LF | 38 | $75.00 | $10.00 | $50.46 |
| 96 | 6IN dip restrained joint water line (795-01.03) | LF | 487 | $135.00 | $620.00 | $171.53 |
| 97 | 6IN PVC water line (795-03.05) | LF | 1,022 | $85.00 | $98.00 | $86.38 |
| 98 | Connect to 4IN water line (795-06.03) | EACH | 2 | $8,500.00 | $2,000.00 | $8,304.66 |
| 99 | 6IN gate valve assembly (795-08.04) | EACH | 2 | $5,000.00 | $2,500.00 | $4,981.10 |
| 100 | 1IN auto air release valve assembly (795-10.03) | EACH | 1 | $8,000.00 | $6,000.00 | $9,389.70 |
| 101 | DI fittings (795-13.01) | LB | 50 | $70.00 | $10.00 | $83.09 |
| 102 | Bridge hanger system (795-13.04) | LS | 1 | $80,000 | $100,000 | $132,969 |
| 103 | 14IN steel casing pipe open cut method (795-15.03) | LF | 260 | $240.00 | $250.00 | $396.57 |
| 104 | __in dip force main (797-01.11) | LF | 338 | $170.00 | $750.00 | $254.07 |
| 105 | 3IN PVC force main (797-03.05) | LF | 563 | $90.00 | $77.00 | $58.93 |
| 106 | Open cut 12IN steel casing pipe (797-06.89) | LF | 80 | $110.00 | $200.00 | $236.79 |
| 107 | DI fittings (797-08.01) | LB | 50 | $70.00 | $10.00 | $8.31 |
| 108 | Bridge hanger system (797-11.43) | LS | 1 | $60,000 | $100,000 | $98,858 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.