TDOT contract CN261079 bid tabulation

The construction of a concrete bulb-tee beam bridge on afg road over southern railway (l.m. 0.45), including grading, drainage, and paving. Let by Tennessee DOT on October 2, 2026, Hawkins County. 3 bids received; low bid $7,295,755 by Southern Constructors, Inc..

Owner
Tennessee DOT
Letting
02 OCT 2026
Pay items
108
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Southern Constructors, Inc.$7,295,755Low
2Jones Bros. Contractors, LLC$7,711,129+6.0%
3Summers-Taylor, Inc.$7,949,973+9.0%
TDOT contract CN261079: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Southern Constructors, Inc.2. Jones Bros. Contractors, LLC3. Summers-Taylor, Inc.
1Construction stakes, lines and grades (105-01)LS1$100,000$40,000$41,376
2Trainee (109-10.01)HR1,100$0.80$0.80$0.80
3Clearing and grubbing (201-01)LS1$70,000$90,000$69,774
4Removal of pipe (12" CMP, sta. 108+57) (202-01.13)LF15$50.00$40.00$174.16
5Removal of pipe (15" CMP, sta. 108+77) (202-01.14)LF38$50.00$30.00$68.75
6Removal of buildings tract no. 2) (202-06.01)LS1$3,000.00$100.00$34,887
7Road & drainage excavation (unclassified) (203-01)CY8,540$40.00$33.00$48.23
8Placing and spreading topsoil (203-04)CY647$40.00$20.00$50.62
9Water (203-06)MG32$125.00$1.00$29.86
10Furnishing & spreading topsoil (203-07)CY74$100.00$30.00$67.83
11Brooming & degrassing shoulders (208-01.05)LM0.10$1,500.00$100,000$16,572
12Sediment removal (209-05)CY92$100.00$28.00$33.48
13Temporary silt fence (with backing) (209-08.02)LF1,240$10.00$6.10$6.98
14Rock check dam (209-08.07)EACH10$1,200.00$1,000.00$948.92
15Enhanced rock check dam (209-08.08)EACH9$1,500.00$1,200.00$1,395.47
16Mineral aggregate, type A base, grading D (303-01)TON1,915$65.00$65.00$85.91
17Granular backfill (roadway) (303-01.01)TON68$65.00$150.00$139.20
18Mineral aggregate (size 57) (303-10.01)TON25$70.00$75.00$110.38
19Mineral aggregate (size varies) (303-10.04)TON808$70.00$100.00$102.72
20Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON400$275.00$247.00$247.00
21Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON325$325.00$273.00$273.00
22Bituminous material for tack coat (TC) (403-01)TON2$1,450.00$1,425.00$1,425.00
23Acs mix(PG70-22) grading D (411-02.10)TON281$325.00$267.00$267.00
24Cold planing bituminous pavement (415-01.01)TON80$325.00$265.00$265.00
2518" concrete pipe culvert (class III) (607-03.02)LF14$350.00$195.00$335.19
2630" pipe culvert (607-06.30)LF21$350.00$340.00$360.40
2718" pipe culvert (side drain) (607-39.02)LF114$300.00$100.00$171.49
28Class A concrete (pipe endwalls) (611-07.01)CY3$2,500.00$2,000.00$3,224.00
29Steel bar reinforcement (pipe endwalls) (611-07.02)LB122$3.00$3.00$14.31
3018IN endwall (side drain) (611-07.31)EACH5$4,000.00$5,200.00$6,847.43
31Junction structure, 48IN round,> ('4' FT depth) (611-63.02)EACH1$10,000$5,000.00$5,645.96
32W beam GR (type 2) MASH TL-3 (705-06.01)LF582$35.00$30.00$40.47
33GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH1$2,000.00$1,700.00$1,744.33
34GR terminal (in-inline) MASH TL-3 (705-06.11)EACH1$1,500.00$1,500.00$1,535.02
35Thrie beam bridge transition MASH TL-3 (705-06.25)EACH4$2,500.00$2,300.00$4,186.41
36GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH6$3,000.00$2,800.00$4,465.51
37Guardrail removed (706-01)LF898$2.00$1.00$1.40
38Radius rail (706-06.03)LF17$60.00$57.00$51.63
39High-visibility construction fence (707-08.11)LF600$6.00$6.00$28.22
40Machined rip-rap (class A-3) (709-05.05)TON50$100.00$75.00$155.29
41Machined rip-rap (class A-1) (709-05.06)TON304$100.00$75.00$113.70
42Traffic control (712-01)LS1$200,000$100,000$175,000
43Portable barrier rail (MASH TL-3) (712-02.10)LF1,480$80.00$150.00$175.05
44Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH8$7,500.00$7,500.00$10,466
45Flexible drums (channelizing) (712-04.01)EACH100$55.00$36.00$50.24
46Barrier rail delineator (712-04.50)EACH68$40.00$8.00$11.16
47Warning lights (type A) (712-05.01)EACH50$35.00$22.00$30.70
48Signs (construction) (712-06)SF331$15.00$7.85$10.95
49Temporary barricades (type III) (712-07.03)LF30$35.00$15.00$20.93
50Removable pavement marking (stop line) (712-09.04)LF48$30.00$17.00$33.49
51Removable pavement marking (6" line) (712-09.08)LF7,250$3.50$3.00$5.09
52Removable black-out tape (6") (712-09.30)LF750$3.50$5.00$5.37
53Raised PVMT markers (BI-directional) (1 color lens) (716-01.11)EACH72$15.00$15.00$20.93
54Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH16$100.00$220.00$139.55
55Painted pavement marking (6" line) (716-05.20)LM1$2,500.00$1,900.00$3,837.54
56Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02)LM1$9,000.00$6,600.00$8,721.69
57Mobilization (717-01)LS1$700,000$765,000$625,000
58Temporary traffic signal system (730-40.02)LS1$100,000$300,000$107,989
59Geomembrane (740-06.01)SY117$115.00$12.00$42.24
60Geogrid reinforcement type 2 (740-07.04)SY1,430$12.00$10.00$11.95
61Geotextile (type III)(erosion control) (740-10.03)SY531$12.00$4.00$7.87
62Geotextile (type IV)(stabilization) (740-10.04)SY507$12.00$3.00$7.86
63Temporary sediment tube 12IN (740-11.02)LF2,823$10.00$5.00$4.40
64Seeding (with mulch) (801-01)UNIT1$550.00$250.00$697.73
65Seeding (without mulch) (801-02)UNIT38$225.00$70.00$48.84
66Water (seeding & sodding) (801-03)MG6.50$225.00$150.00$209.32
67Sodding (new sod) (803-01)SY277$25.00$20.00$14.65
68Erosion control blanket (type II) (805-12.02)SY3,268$6.00$1.50$1.74
69Removal of structures (exist. BR. no. 37-0A352-0.46) (202-04.01)LS1$275,000$500,000$319,240
70Dry excavation (bridges) (204-02.01)CY214$125.00$125.00$89.63
71Core drilling and sampling (204-05.01)LF184$450.00$115.00$170.75
72Granular backfill (bridges) (303-01.02)TON32$200.00$150.00$112.89
73Epoxy coated reinforcing steel (604-02.03)LB101,237$2.25$2.50$2.68
74Class A concrete (bridges) (604-03.01)CY293$1,600.00$2,000.00$2,710.30
75Steel bar reinforcement (bridges) (604-03.02)LB66,898$3.00$2.00$3.27
76Pavement @ bridge ends (604-03.04)SY204$650.00$600.00$814.30
77Class DS concrete (604-03.32)CY281$1,800.00$1,750.00$2,349.22
78Applied texture finish (new structures) (604-04.01)SY1,227$22.00$14.50$20.23
79Bridge deck grooving (mechanical) (604-05.31)SY1,117$10.00$6.76$10.76
80Steel piles (10 inch) (606-02.03)LF390$400.00$130.00$297.02
81Pile tips (steel piles, 10 inch) (606-02.06)EACH24$500.00$300.00$208.65
82Drainage system - bridge deck(span no.3) (610-10.04)LS1$45,000$50,000$22,835
83Prestressed concrete bulb tee beam (6" web)(BT-63) (615-01.11)LF1,088$725.00$600.00$871.78
84Bridge deck crack sealing (617-02)LF225$50.00$25.00$9.62
85Sealant (HMWM) (617-05)GAL2$750.00$400.00$432.07
86Conc parapet single slope (STD-1-1SS) (620-05.01)LF525$200.00$160.00$168.98
87Temporary shoring (621-05.02)LS1$100,000$50,000$121,204
88Camera inspection - drilled shaft (dry) (625-01.10)EACH4$4,000.00$1,500.00$8,372.83
89Drilled shaft-soil (12-0" dia.) (625-02.01)VF33$5,000.00$10,000$1,542.49
90Drilled shaft-rock (8'-0" dia.) (625-02.13)VF48$5,500.00$8,000.00$4,630.19
91Drilled shaft (SH-SCC) concrete (625-02.40)CY90$2,500.00$1,000.00$993.09
92Chain-link fence (bridges) (707-07.01)SF2,360$35.00$30.00$41.86
93Reinforced concrete slope pavement (709-04)CY125$1,450.00$850.00$1,263.97
946" perforated pipe with vertical drain system (710-09.01)LF142$75.00$50.00$50.92
956" pipe underdrain (710-09.02)LF38$75.00$10.00$50.46
966IN dip restrained joint water line (795-01.03)LF487$135.00$620.00$171.53
976IN PVC water line (795-03.05)LF1,022$85.00$98.00$86.38
98Connect to 4IN water line (795-06.03)EACH2$8,500.00$2,000.00$8,304.66
996IN gate valve assembly (795-08.04)EACH2$5,000.00$2,500.00$4,981.10
1001IN auto air release valve assembly (795-10.03)EACH1$8,000.00$6,000.00$9,389.70
101DI fittings (795-13.01)LB50$70.00$10.00$83.09
102Bridge hanger system (795-13.04)LS1$80,000$100,000$132,969
10314IN steel casing pipe open cut method (795-15.03)LF260$240.00$250.00$396.57
104__in dip force main (797-01.11)LF338$170.00$750.00$254.07
1053IN PVC force main (797-03.05)LF563$90.00$77.00$58.93
106Open cut 12IN steel casing pipe (797-06.89)LF80$110.00$200.00$236.79
107DI fittings (797-08.01)LB50$70.00$10.00$8.31
108Bridge hanger system (797-11.43)LS1$60,000$100,000$98,858
TDOT contract CN261079: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy