Baker's Construction Services, Inc.: TDOT bid record
Baker's Construction Services, Inc. submitted 13 bids on Tennessee DOT contracts in the data, from 23 MAR 2018 to 02 OCT 2026, and was the low bidder on 5 of them (38%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $23,069,799
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2024 | 5 | 2 | 40% |
| 2025 | 4 | 1 | 25% |
| 2026 | 3 | 2 | 67% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Carter County | 3 | 1 | 33% |
| Counties Greene, Hawkins, Sullivan, And Washington | 1 | 0 | 0% |
| Carter And Johnson Counties | 1 | 1 | 100% |
| Unicoi And Washington Counties | 1 | 1 | 100% |
| Cocke County | 1 | 0 | 0% |
| Hancock County | 1 | 0 | 0% |
| Sullivan County | 1 | 0 | 0% |
| Sullivan And Washington Counties | 1 | 0 | 0% |
| Washington County | 1 | 1 | 100% |
| Johnson County | 1 | 1 | 100% |
| Sullivan | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Road & drainage excavation (unclassified) | 203-01 | CY | 9 | 7 (78%) | $37.00 | $35.00 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 8 | 5 (63%) | $76.00 | $45.00 |
| Machined rip-rap (class A-1) | 709-05.06 | TON | 6 | 4 (67%) | $75.46 | $70.00 |
| Mineral aggregate (size 57) | 303-10.01 | TON | 5 | 4 (80%) | $77.77 | $65.00 |
| Sediment removal | 209-05 | CY | 7 | 3 (43%) | $50.09 | $31.36 |
| Water (seeding & sodding) | 801-03 | MG | 6 | 3 (50%) | $78.82 | $100.00 |
| Enhanced rock check dam | 209-08.08 | EACH | 6 | 3 (50%) | $904.75 | $1,000.00 |
| Borrow excavation (graded solid rock) | 203-02.01 | TON | 6 | 3 (50%) | $75.28 | $45.00 |
| Furnishing & spreading topsoil | 203-07 | CY | 5 | 3 (60%) | $83.14 | $65.00 |
| Signs (construction) | 712-06 | SF | 8 | 2 (25%) | $9.97 | $8.00 |
| Acs mix(PG64-22) grading D | 411-01.10 | TON | 7 | 2 (29%) | $273.90 | $171.29 |
| Machined rip-rap (class A-3) | 709-05.05 | TON | 7 | 2 (29%) | $89.98 | $67.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Summers-Taylor, Inc. | 9 | 3 of 9 |
| Southern Constructors, Inc. | 3 | 1 of 3 |
| Rock Supremacy, LLC | 2 | 1 of 2 |
| Nicholas Overbay DBA East Tennessee Turf and Landscape | 1 | 0 of 1 |
| Charles Blalock & Sons, Inc. | 1 | 1 of 1 |
| Jones Bros. Contractors, LLC | 1 | 0 of 1 |
| Wright Brothers Civil Construction, LLC | 1 | 1 of 1 |
| Tim's Tree Service, Incorporated | 1 | 1 of 1 |
| Adams Contracting, LLC | 1 | 0 of 1 |
| Eclipse Companies,LLC | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261070 | Carter County | The bridge rehabilitation on u.s. 19e (s.r. 37) under the bridges over laurel fork creek (l.m. 16.96), including slope repair near l.m. 17.1 | 1 of 3 | $1,996,731 | Low, 7.0% under the second |
| 02 OCT 2026 | CN261067 | Carter County | The slope stabilization on s.r. 143 near l.m. 9.8 | 2 of 4 | $1,138,085 | +14% |
| 02 OCT 2026 | CN261072 | Johnson County | 34(146),46s034-f3-006 the slope repair on u.s. 421 (s.r. 34) near l.m. 21.14, and on s.r. 167 near l.m. 7.3 and 16.54 | 1 of 1 | $4,371,868 | Low |
| 03 OCT 2025 | CNZ271 | Washington County | The grading, drainage, signals, and paving on u.s. 11e (s.r. 34) at the intersection of stockyard road and precision boulevard (l.m. 4.89 - | 1 of 3 | $3,283,917 | Low, 11% under the second |
| 15 AUG 2025 | CNZ211 | Hancock County | The installation of rock buttresses on s.r. 31 near l.m. 5.54, including grading, drainage, and paving | 2 of 2 | $5,515,266 | +24% |
| 15 AUG 2025 | CNZ214 | Sullivan County | The rockfall mitigation on i-26 near m.m. 1.7 | 3 of 3 | $3,053,654 | +75% |
| 15 AUG 2025 | CNZ223 | Sullivan And Washington Counties | The ada curb ramp upgrades on various state routes | 2 of 3 | $631,696 | +45% |
| 06 DEC 2024 | CNY314 | Carter County | The installation of soil nail reinforcement on u.s. 19e (s.r. 37) between l.m. 1.48 and l.m. 1.52 (hurricane helene) | 2 of 2 | $1,707,041 | +42% |
| 06 DEC 2024 | CNY315 | Cocke County | The installation of soil nail reinforcement and rock anchors on i-40 near mile markers 450.7, 451.0, and 451.6 (hurricane helene) | 2 of 3 | $32,454,890 | +22% |
| 25 OCT 2024 | CNY311 | Carter And Johnson Counties | The emergency spot repairs and reconstruction on u.s. 321 (s.r. 159) from u.s. 321 (s.r. 67) (l.m. 0.00) in carter county to the north carol | 1 of 2 | $10,068,782 | Low, 26% under the second |
| 25 OCT 2024 | CNY313 | Unicoi And Washington Counties | The emergency spot repairs and reconstruction on s.r. 81 from l.m. 1.7 in unicoi county to l.m. 0.63 in washington county | 1 of 3 | $3,348,501 | Low, 12% under the second |
| 04 OCT 2024 | CNY235 | Counties Greene, Hawkins, Sullivan, And Washington | The ada curb ramp upgrades on various state routes | 2 of 3 | $778,955 | +3.0% |
| 23 MAR 2018 | CNS145 | Sullivan | The grading, drainage, signals and paving on s.r. 357 from south of hospitality place/flagship drive (l.m. 2.15) to i-81 (l.m. 2.37) | 2 of 2 | $1,282,481 | +38% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.