TDOT contract CN261070 bid tabulation
The bridge rehabilitation on u.s. 19e (s.r. 37) under the bridges over laurel fork creek (l.m. 16.96), including slope repair near l.m. 17.1. Let by Tennessee DOT on October 2, 2026, Carter County. 3 bids received; low bid $1,996,731 by Baker's Construction Services, Inc..
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 52
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Baker's Construction Services, Inc. | $1,996,731 | Low |
| 2 | Summers-Taylor, Inc. | $2,140,355 | +7.0% |
| 3 | Southern Constructors, Inc. | $3,206,327 | +61% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Baker's Construction Services, Inc. | 2. Summers-Taylor, Inc. | 3. Southern Constructors, Inc. |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $48,000 | $14,600 | $45,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $75,000 | $84,400 | $150,000 |
| 3 | Sediment removal (209-05) | CY | 2 | $90.00 | $405.00 | $95.00 |
| 4 | Road & drainage excavation (unclassified) (203-01) | CY | 1,184 | $43.56 | $114.00 | $120.00 |
| 5 | Borrow excavation (graded solid rock) (203-02.01) | TON | 5,972 | $84.00 | $74.10 | $120.00 |
| 6 | Furnishing & spreading topsoil (203-07) | CY | 151.35 | $83.14 | $100.00 | $120.00 |
| 7 | Sediment filter bag(15' X 10') (209-09.04) | EACH | 2 | $1,800.00 | $3,570.00 | $880.00 |
| 8 | Construction of haul road (203-50) | LS | 1 | $250,000 | $199,900 | $700,000 |
| 9 | Temporary in stream diversion (209-65.04) | LF | 400 | $158.00 | $77.20 | $100.00 |
| 10 | Mineral aggregate (size 57) (303-10.01) | TON | 120 | $84.26 | $110.00 | $85.00 |
| 11 | Flowable fill (general) (204-06.01) | CY | 444 | $250.00 | $258.00 | $260.00 |
| 12 | Brooming & degrassing shoulders (208-01.05) | LM | 0.30 | $21,424 | $18,391 | $2,200.00 |
| 13 | Temporary silt fence (with backing) (209-08.02) | LF | 742 | $14.00 | $13.00 | $10.00 |
| 14 | Bag barrier system (2 foot tall) (209-09.60) | LF | 1,050 | $340.00 | $386.00 | $370.00 |
| 15 | Warning lights (type A) (712-05.01) | EACH | 35 | $6.37 | $37.75 | $30.00 |
| 16 | Catch basin protection (type D) (209-40.33) | EACH | 2 | $525.77 | $882.00 | $960.00 |
| 17 | Bituminous material for tack coat (TC) (403-01) | TON | 1 | $1,719.04 | $1,350.00 | $1,600.00 |
| 18 | Acs mix(PG64-22) grading D (411-01.10) | TON | 34 | $732.18 | $575.00 | $700.00 |
| 19 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 0.30 | $8,276.83 | $37,818 | $9,000.00 |
| 20 | Cold planing bituminous pavement (415-01.01) | TON | 108 | $109.51 | $86.00 | $100.00 |
| 21 | 18" temporary drainage pipe (621-03.02) | LF | 60 | $89.09 | $113.00 | $130.00 |
| 22 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 680 | $38.20 | $38.00 | $35.00 |
| 23 | Guardrail removed (706-01) | LF | 680 | $10.00 | $1.90 | $2.00 |
| 24 | High-visibility construction fence (707-08.11) | LF | 110 | $6.37 | $6.20 | $6.00 |
| 25 | Machined rip-rap (class A-3) (709-05.05) | TON | 282 | $89.98 | $72.65 | $100.00 |
| 26 | Traffic control (712-01) | LS | 1 | $3,820.08 | $84,000 | $150,000 |
| 27 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 1,590 | $107.71 | $109.00 | $75.00 |
| 28 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 200 | $131.20 | $139.00 | $200.00 |
| 29 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 5 | $8,531.51 | $6,500.00 | $8,000.00 |
| 30 | Flexible drums (channelizing) (712-04.01) | EACH | 110 | $39.48 | $77.50 | $40.00 |
| 31 | Barrier rail delineator (712-04.50) | EACH | 90 | $10.19 | $64.94 | $35.00 |
| 32 | Signs (construction) (712-06) | SF | 601 | $9.68 | $17.95 | $15.00 |
| 33 | Temporary barricades (type III) (712-07.03) | LF | 22 | $20.37 | $55.35 | $20.00 |
| 34 | Arrow board (type C) (712-08.03) | EACH | 3 | $764.02 | $1,380.00 | $4,500.00 |
| 35 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 2,000 | $5.09 | $5.55 | $5.00 |
| 36 | Removable pavement marking (6" line) (712-09.08) | LF | 1,850 | $3.82 | $4.95 | $4.50 |
| 37 | Removable black-out tape (8IN) (712-09.31) | LF | 720 | $6.37 | $5.55 | $5.00 |
| 38 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 10 | $445.68 | $124.00 | $120.00 |
| 39 | Removal of snowplowable reflective marker (716-01.30) | EACH | 10 | $95.50 | $30.94 | $30.00 |
| 40 | Plastic pavement marking (6" dotted line) (716-02.11) | LF | 710 | $2.86 | $1.55 | $1.50 |
| 41 | Painted pavement marking (6" line) (716-05.20) | LM | 0.20 | $9,422.90 | $3,094.15 | $3,000.00 |
| 42 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.30 | $22,920 | $15,471 | $15,000 |
| 43 | Mobilization (717-01) | LS | 1 | $45,000 | $110,000 | $300,000 |
| 44 | Geotextile (type III)(erosion control) (740-10.03) | SY | 670 | $8.50 | $8.00 | $15.00 |
| 45 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 1,640 | $14.80 | $37.20 | $10.00 |
| 46 | Temporary sediment tube 18IN (740-11.03) | LF | 384 | $10.00 | $6.20 | $15.00 |
| 47 | Seeding (with mulch) (801-01) | UNIT | 3 | $150.00 | $92.83 | $150.00 |
| 48 | Seeding (without mulch) (801-02) | UNIT | 5 | $130.00 | $74.30 | $125.00 |
| 49 | Temporary seeding (without mulch) (801-02.08) | UNIT | 5 | $120.00 | $61.88 | $125.00 |
| 50 | Fertilizer (801-02.15) | TON | 0.10 | $3,500.00 | $1,856.60 | $1,200.00 |
| 51 | Water (seeding & sodding) (801-03) | MG | 1.70 | $1,200.00 | $124.00 | $300.00 |
| 52 | Erosion control blanket (type II) (805-12.02) | SY | 908 | $12.00 | $1.85 | $25.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.