TDOT contract CN261067 bid tabulation
The slope stabilization on s.r. 143 near l.m. 9.8. Let by Tennessee DOT on October 2, 2026, Carter County. 4 bids received; low bid $996,878 by Eclipse Companies,LLC.
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 29
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Eclipse Companies,LLC | $996,878 | Low |
| 2 | Baker's Construction Services, Inc. | $1,138,085 | +14% |
| 3 | Summers-Taylor, Inc. | $1,138,211 | +14% |
| 4 | Rock Supremacy, LLC | $1,579,815 | +58% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eclipse Companies,LLC | 2. Baker's Construction Services, Inc. | 3. Summers-Taylor, Inc. | 4. Rock Supremacy, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Road & drainage excavation (unclassified) (203-01) | CY | 824 | $113.00 | $117.00 | $175.00 | $205.00 |
| 2 | Temporary silt fence (with backing) (209-08.02) | LF | 300 | $27.00 | $15.92 | $15.80 | $5.00 |
| 3 | Mineral aggregate, type A base, grading D (303-01) | TON | 64 | $142.75 | $128.55 | $166.00 | $140.00 |
| 4 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 4 | $1,566.00 | $1,846.37 | $1,450.00 | $500.00 |
| 5 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 3 | $1,944.00 | $2,292.05 | $1,800.00 | $500.00 |
| 6 | Bituminous material for tack coat (TC) (403-01) | TON | 0.03 | $1,458.00 | $1,719.00 | $1,350.00 | $2,000.00 |
| 7 | Acs mix(PG64-22) grading D (411-01.10) | TON | 69 | $361.75 | $426.58 | $335.00 | $140.00 |
| 8 | Cold planing bituminous pavement (415-01.01) | TON | 68 | $162.00 | $178.27 | $140.00 | $100.00 |
| 9 | Retaining wall (wall 1) (604-07.01) | SF | 1,812 | $286.75 | $357.00 | $308.00 | $499.00 |
| 10 | Horizontal drains (610-12.02) | LF | 400 | $76.75 | $59.85 | $61.29 | $50.00 |
| 11 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 150 | $32.50 | $38.20 | $35.43 | $30.00 |
| 12 | Guardrail removed (706-01) | LF | 150 | $1.50 | $1.28 | $3.80 | $4.00 |
| 13 | High-visibility construction fence (707-08.11) | LF | 300 | $10.75 | $6.37 | $6.30 | $4.00 |
| 14 | Machined rip-rap (class A-3) (709-05.05) | TON | 100 | $182.75 | $125.00 | $113.00 | $200.00 |
| 15 | Traffic control (712-01) | LS | 1 | $15,000 | $45,000 | $34,400 | $89,500 |
| 16 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 500 | $86.75 | $85.00 | $166.00 | $76.00 |
| 17 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 2 | $7,344.00 | $8,658.85 | $12,300 | $7,000.00 |
| 18 | Flexible drums (channelizing) (712-04.01) | EACH | 20 | $37.75 | $44.57 | $46.30 | $30.00 |
| 19 | Barrier rail delineator (712-04.50) | EACH | 25 | $8.75 | $10.19 | $12.35 | $25.00 |
| 20 | Signs (construction) (712-06) | SF | 363 | $8.25 | $9.75 | $12.35 | $30.00 |
| 21 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 810 | $4.50 | $5.41 | $5.70 | $7.00 |
| 22 | Removable pavement marking (stop line) (712-09.04) | LF | 22 | $27.00 | $31.83 | $25.30 | $40.00 |
| 23 | Removable pavement marking (6" line) (712-09.08) | LF | 2,000 | $4.00 | $4.77 | $5.06 | $3.00 |
| 24 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 6 | $162.00 | $250.00 | $63.10 | $600.00 |
| 25 | Removal of snowplowable reflective marker (716-01.30) | EACH | 6 | $30.50 | $50.00 | $63.10 | $150.00 |
| 26 | Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01) | LM | 0.20 | $18,900 | $22,284 | $5,029.20 | $5,000.00 |
| 27 | Mobilization (717-01) | LS | 1 | $153,024 | $85,000 | $108,700 | $218,000 |
| 28 | Temporary traffic signal system (730-40) | EACH | 1 | $12,960 | $65,000 | $58,200 | $39,402 |
| 29 | Geotextile (type III)(erosion control) (740-10.03) | SY | 86 | $15.50 | $14.71 | $16.40 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.