TDOT contract CNZ276 bid tabulation

The grading, drainage, retaining walls, signals, and paving on s.r. 126 from near east center street (l.m. 3.67) in kingsport to east of briarwood road (l.m. 5.75). Let by Tennessee DOT on December 5, 2025, Sullivan County. 2 bids received; low bid $82,304,525 by Nicholas Overbay DBA East Tennessee Turf and Landscape.

Owner
Tennessee DOT
Letting
05 DEC 2025
Pay items
498
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Nicholas Overbay DBA East Tennessee Turf and Landscape$82,304,525Low
2Summers-Taylor, Inc.$88,509,364+8.0%
TDOT contract CNZ276: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Nicholas Overbay DBA East Tennessee Turf and Landscape2. Summers-Taylor, Inc.
1Construction stakes, lines and grades (105-01)LS1$1,500,000$648,856
2CPM project schedule (108-03)LS1$180,000$142,815
3Trainee (109-10.01)HR5,680$0.80$0.80
4Clearing and grubbing (201-01)LS1$1,500,000$1,200,000
5Removal of structures and obstructions (202-01)LS1$250,000$649,617
6Removal of asphalt pavement (202-03.01)SY2,028$10.00$33.77
7Road & drainage excavation (unclassified) (203-01)CY144,651$28.00$44.41
8Borrow excavation (graded solid rock) (203-02.01)TON37,043$76.00$64.38
9Borrow excavation (unclassified) (203-03.51)CY153,001$31.00$38.21
10Placing and spreading topsoil (203-04)CY8,843$22.00$41.21
11Undercutting (203-05)CY18,360$21.00$36.96
12Water (203-06)MG3,072$5.00$16.80
13Graded solid rock (in-place) (203-10.16)CY1,826$50.00$108.03
14Backfill material (flowable fill) (204-08.01)CY35$700.00$477.15
15Ditch (riprap, sand & plastic sheeting) (208-02.01)LF15,846$70.00$21.58
1612" temporary slope drain (209-02.05)LF11,000$35.00$38.22
17Filter sock (12 inch) (209-03.21)LF775$7.00$5.80
18Sediment removal (209-05)CY1,636$20.00$40.81
19Temporary silt fence (with backing) (209-08.02)LF4,483$7.00$8.96
20Temporary silt fence (without backing) (209-08.03)LF10,893$5.00$2.11
21Rock check dam (209-08.07)EACH517$650.00$567.30
22Enhanced rock check dam (209-08.08)EACH58$1,050.00$1,040.03
23Sandbags (209-09.01)BAG7,450$14.00$10.20
24Sediment filter bag (15' X 15') (209-09.03)EACH2$1,500.00$1,070.34
25Curb inlet protection (type 2) (209-09.41)EACH1$1,000.00$342.60
26Curb inlet protection (type 4) (209-09.43)EACH231$550.00$342.60
27Temporary dewatering structure (209-10.01)CY382$40.00$36.50
28Polyethylene sheeting (6 mil. minimum) (209-20.03)SY250$4.00$7.58
29Catch basin protection (type D) (209-40.33)EACH20$500.00$342.60
30Catch basin protection (type E) (209-40.34)EACH3$550.00$263.53
31Catch basin filter assembly(type 1) (209-40.41)EACH20$800.00$790.61
32Catch basin filter assembly(type 4) (209-40.44)EACH1$1,100.00$790.60
33Catch basin filter assembly(type 8) (209-40.48)EACH5$1,000.00$790.60
34Mineral aggregate, type A base, grading D (303-01)TON61,378$52.00$57.41
35Mineral aggregate (size 57) (303-10.01)TON3,627$70.00$84.53
36Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON201$285.00$214.95
37Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON3,156$211.00$233.27
38Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21)TON10,419$158.00$140.34
39Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON13,519$160.00$140.94
40Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON8,856$162.00$151.12
41Treated permeable base (313-03)SY1,671$45.00$63.91
42Bituminous material for prime coat (PC) (402-01)TON136$1,000.00$1,578.83
43Aggregate for cover material (PC) (402-02)TON456$168.00$108.23
44Bituminous material for tack coat (TC) (403-01)TON20$2,000.00$1,187.62
45Acs mix(PG64-22) grading D (411-01.10)TON1,868$273.00$272.01
46Acs mix(PG70-22) grading D (411-02.10)TON5,192$201.00$166.13
47Portland cement concrete pavement (plain) 10" (501-01.03)SY1,671$175.00$180.39
48Structural steel (602-01)LB64.45$40.00$6.79
49Class A concrete (roadway) (604-01.01)CY0.62$1,500.00$3,397.69
50Box tube safety rail (604-01.20)LF353$258.00$389.20
51Energy dissipater (usbr TY VI - 24", W = 5') (604-02.41)EACH2$10,000$36,324
52Energy dissipater (usbr TY VI - 30", W =5') (604-02.42)EACH1$10,000$36,324
53Energy dissipater (usbr TY VI - 30", W = 7') (604-02.44)EACH2$10,000$41,109
54Retaining wall (sta. 253+00 - sta. 255+00 LT) (604-07.01)SF1,427$160.00$292.84
55Retaining wall (glenwood sta. 48+00 - sta. 48+85 LT) (604-07.02)SF982$150.00$192.92
56Retaining wall (sta 287+50 to sta 291+50 RT) (604-07.03)SF4,601$150.00$244.81
57Retaining wall (sta 291+50 to sta 292+00 RT) (604-07.04)SF512$150.00$193.50
58Retaining wall (harbor chapel 50+75 to 278+75 RT) (604-07.05)SF5,377$160.00$130.23
59Retaining wall (sta. 282+25 to sta. 286+75 LT) (604-07.06)SF2,945$180.00$564.65
60Retaining wall (sta 291+00 to sta 297+00 LT) (604-07.07)SF10,382$111.00$147.68
61Retaining wall (ramp C) (604-07.08)SF1,360$265.00$235.86
6218" concrete pipe culvert (class III) (607-03.02)LF7,388$150.00$281.73
6318" concrete pipe culvert (class V) (607-03.04)LF27$200.00$285.65
6424" concrete pipe culvert (class III) (607-05.02)LF2,640$175.00$339.90
6530" concrete pipe culvert (class III) (607-06.02)LF1,396$200.00$362.38
6630" concrete pipe culvert (class V) (607-06.04)LF154$225.00$387.30
6736" concrete pipe culvert (class III) (607-07.02)LF912$260.00$379.71
6842" concrete pipe culvert (class III) (607-08.02)LF429$300.00$450.02
6948" concrete pipe culvert (class III) (607-09.02)LF626$380.00$534.56
7060" concrete pipe culvert (class III) (607-11.03)LF466$700.00$927.25
7118" corrugated metal pipe culvert (607-37.02)LF16$100.00$253.66
7218" pipe culvert (side drain) (607-39.02)LF523$85.00$146.77
7324" pipe culvert (side drain) (607-39.03)LF202$100.00$153.75
7460" pipe culvert (side drain) (607-39.09)LF81$280.00$322.46
7518" slotted drain pipe (607-45.02)LF40$250.00$195.14
76Manholes, > 4' - 8' depth (611-01.02)EACH2$6,000.00$9,370.21
77Manholes, > 8' - 12' depth (611-01.03)EACH3$12,000$10,548
78Manholes, > 12' - 16' depth (611-01.04)EACH1$15,000$14,528
79Manholes, > 16' - 20' depth (611-01.05)EACH1$20,000$21,116
80Manholes, > 20' - 24' depth (611-01.06)EACH1$30,000$22,234
81Manholes, > 24' - 28' depth (611-01.07)EACH2$40,000$25,250
82Junction box, type 2 (611-02.11)EACH1$8,000.00$5,120.00
83Class A concrete (pipe endwalls) (611-07.01)CY139$2,200.00$1,986.39
84Steel bar reinforcement (pipe endwalls) (611-07.02)LB6,353$5.50$2.87
85Structural steel (pipe endwalls) (611-07.03)LB728$10.00$9.35
8618IN endwall (side drain) (611-07.31)EACH2$3,000.00$5,723.73
8718IN endwall (cross drain) 3:1 (611-07.54)EACH16$3,000.00$2,904.07
8824IN endwall (cross drain) 3:1 (611-07.57)EACH1$3,800.00$3,587.93
8930IN endwall (cross drain) 3:1 (611-07.60)EACH1$5,000.00$5,592.38
9036IN endwall (cross drain) 3:1 (611-07.63)EACH1$6,500.00$6,907.00
9136IN endwall (cross drain) 4:1 (611-07.64)EACH2$6,500.00$8,354.82
9242IN endwall (cross drain) 3:1 (611-07.66)EACH1$7,500.00$13,614
9348IN endwall (cross drain) 3:1 (611-07.69)EACH2$9,000.00$6,990.75
94Catch basins, type 12, 0' - 4' depth (611-12.01)EACH16$5,500.00$7,643.85
95Catch basins, type 12, > 4' - 8' depth (611-12.02)EACH55$6,500.00$8,811.99
96Catch basins, type 12, > 8' - 12' depth (611-12.03)EACH18$10,000$12,153
97Catch basins, type 12, > 12' - 16' depth (611-12.04)EACH8$17,000$18,281
98Catch basins, type 12, > 16' - 20' depth (611-12.05)EACH1$22,000$20,842
99Catch basins, type 12, > 20' - 24' depth (611-12.06)EACH1$29,000$23,749
100Catch basins, type 13, > 4' - 8' depth (611-13.02)EACH1$7,500.00$7,002.06
101Catch basins, type 13, > 12' - 16' depth (611-13.04)EACH1$15,000$9,336.05
102Catch basins, type 14, 0' - 4' depth (611-14.01)EACH2$7,000.00$11,184
103Catch basins, type 14, > 4' - 8' depth (611-14.02)EACH20$13,500$12,117
104Catch basins, type 14, > 8' - 12' depth (611-14.03)EACH6$17,000$23,620
105Catch basins, type 14, > 12' - 16' depth (611-14.04)EACH3$22,000$42,208
106Catch basins, type 16, > 4' - 8' depth (611-16.02)EACH3$12,000$13,480
107Catch basins, type 25, > 4' - 8' depth (611-25.02)EACH2$6,000.00$8,258.38
108Catch basins, type 26, > 4' - 8' depth (611-26.02)EACH5$7,500.00$11,870
109Catch basins, type 27, > 4' - 8' depth (611-27.02)EACH1$13,000$16,806
110Catch basins, type 27, > 12' - 16' depth (611-27.04)EACH1$17,000$27,694
111Catch basins, type 28, > 4' - 8' depth (611-28.02)EACH6$13,000$6,922.50
112Catch basins, type 28, > 12' - 16' depth (611-28.04)EACH1$18,000$14,889
113Catch basins, type 28, > 20' - 24' depth (611-28.06)EACH1$30,000$15,071
114Catch basins, type 28, >( ' - ' depth) (611-28.08)EACH1$25,000$25,326
115Catch basins, type 29, > 4' - 8' depth (611-29.02)EACH1$16,000$13,444
116Catch basins, type 39, > 4' - 8' depth (611-39.02)EACH1$25,000$24,518
117Catch basins, type 41, 0' - 4' depth (611-41.01)EACH1$5,500.00$7,333.94
118Catch basins, type 41, > 4' - 8' depth (611-41.02)EACH1$7,500.00$7,595.78
119Catch basins, type 42, 0' - 4' depth (611-42.01)EACH18$7,500.00$7,035.38
120Catch basins, type 42, > 4' - 8' depth (611-42.02)EACH17$10,000$8,173.59
121Catch basins, type 42, > 8' - 12' depth (611-42.03)EACH2$18,000$17,071
122Catch basins, type 42, > 12' - 16' depth (611-42.04)EACH1$23,000$22,184
123Catch basins, type 43, 0' - 4' depth (611-43.01)EACH2$12,000$12,686
124Catch basins, type 43, > 4' - 8' depth (611-43.02)EACH7$16,000$13,506
125Catch basins, type 43, > 8' - 12' depth (611-43.03)EACH1$20,000$19,903
126Catch basins, type 44, > 4' - 8' depth (611-44.02)EACH2$35,000$35,483
127Catch basins, type 44, > 8' - 12' depth (611-44.03)EACH1$48,000$46,201
128Catch basins, type 45, > 4' - 8' depth (611-45.02)EACH1$15,000$16,213
129Catch basins, (type >4'-8'depth) (611-90.01)EACH1$18,000$13,885
130Conc parapet single slope (STD-1-1SS) (620-05.01)LF450$155.00$148.73
13124" temporary drainage pipe (621-03.03)LF70$65.00$141.24
13236" temporary drainage pipe (621-03.05)LF72$150.00$189.34
133Steel mesh & plates (622-02.01)SF124$65.00$298.64
134Concrete sidewalk (4 ") (701-01.01)SF77,943$10.25$12.33
135Concrete driveway (701-02)SF16,028$16.00$17.63
136Concrete curb ramp (701-02.03)SF3,769$30.00$56.33
137Concrete curb (702-01.02)LF10,350$38.00$34.74
138Concrete combined curb & gutter (702-03)CY1,700$600.00$609.40
139Portland cement concrete ditch paving (703-01)CY32.20$900.00$802.13
140Single guardrail (type 2) (705-02.02)LF5,300$29.25$27.29
141Earth pad for guard rail end treatment (705-04.10)EACH6$2,400.00$2,086.88
142W beam GR (type 2) MASH TL-3 (705-06.01)LF175$30.00$26.22
143GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH11$2,000.00$1,658.80
144GR terminal (in-inline) MASH TL-3 (705-06.11)EACH4$1,800.00$1,284.23
145GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH6$4,000.00$3,424.62
146Permanent impact attenuator NCHRP350 TL-3 (705-08.13)EACH2$34,800$33,176
147Guardrail removed (706-01)LF4,119$3.73$2.68
148Radius rail (706-06.03)LF4$50.00$33.18
149Rounded end element (706-10.26)EACH4$300.00$240.80
150High-visibility construction fence (707-08.11)LF750$5.00$4.74
151Markers (concrete R.O.W. posts) (708-02.01)EACH227$525.00$615.97
152Machined rip-rap (class A-3) (709-05.05)TON10$90.00$96.77
153Machined rip-rap (class A-1) (709-05.06)TON1,402$68.00$86.74
154Machined rip-rap (class A-2) (709-05.07)TON579$68.00$85.96
155Machined rip-rap (class B) (709-05.08)TON3,758$60.00$84.13
156Machined rip-rap (class C) (709-05.09)TON8,010$82.00$85.11
157Aggregate underdrains (with pipe) (710-02)LF19,353$15.50$15.49
158Lateral underdrain (710-05)LF354$15.00$29.22
159Lateral underdrain endwall (2:1) (710-06.11)EACH2$2,000.00$1,318.91
160Lateral underdrain endwall (3:1) (710-06.12)EACH8$2,000.00$1,318.90
161Lateral underdrain endwall (4:1) (710-06.13)EACH2$2,000.00$1,318.91
162Lateral underdrain endwall (6:1) (710-06.15)EACH1$2,000.00$1,318.90
163Traffic control (712-01)LS1$2,600,000$1,750,000
164Flexible drums (channelizing) (712-04.01)EACH273$65.00$64.30
165Signs (construction) (712-06)SF944$11.00$6.85
166Temporary barricades (type II) (712-07.02)LF75$25.00$23.19
167Temporary barricades (type III) (712-07.03)LF994$22.00$21.08
168Arrow board (type C) (712-08.03)EACH4$2,000.00$2,319.11
169Removable pavement marking (arrow) (712-09.05)EACH131$480.00$421.66
170Sign post delineation enhancement (713-02.21)LF10$15.00$6.33
171"U" section steel posts (713-11.01)LB270$6.25$5.27
172Perforated/knockout square tube post (713-11.02)LB2,745$7.50$6.17
173U post slip base (713-11.22)EACH2$550.00$606.13
174Flat sheet aluminum signs (0.064" thick) (713-13.01)SF1,270.50$12.00$9.49
175Street name sign (rigid 0.100IN thick (713-14.21)SF271$28.00$24.25
176Removal of signs, posts and footings (713-15)LS1$30,000$1,054.14
177Changeable message sign unit (713-16.01)EACH2$12,000$11,596
178LED luminaires (275 watt) (714-09.46)EACH4$1,800.00$1,581.21
179Plastic pavement marking(channelization striping) (716-02.04)SY6,641$28.00$29.52
180Plastic pavement marking (6" dotted line) (716-02.11)LF957$3.00$3.43
181Plastic word pavement marking (only) (716-03.01)EACH4$350.00$263.54
182Plastic pavement marking-bike symbol/arrow shared (716-04.15)EACH34$470.00$500.72
183Painted pavement marking (4" line) (716-05.01)LM16.70$1,400.00$1,844.74
184Painted pavement marking (cross-walk) (716-05.03)LF638$8.00$7.91
185Painted pavement marking (stop line) (716-05.05)LF700$7.00$7.91
186Painted pavement marking (turn lane arrow) (716-05.06)EACH50$175.00$158.12
187Painted pavement marking(straight-turn arrow) (716-05.09)EACH5$200.00$184.48
188Painted pavement marking(straight arrow) (716-05.11)EACH2$165.00$158.12
189Painted pavement marking(4"dotted line) (716-05.21)LF429$1.35$0.53
190Removal of pavement marking (line) (716-08.01)LF6,363$1.20$1.32
191Removal of pavement marking (channelization striping) (716-08.04)SY593$18.00$23.19
192Removal of pavement marking (stop line) (716-08.05)LF34$6.35$8.17
193Removal of pavement marking (turn lane arrow) (716-08.06)EACH4$200.00$105.42
194Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM11.20$7,750.00$7,906.05
195Mobilization (717-01)LS1$5,800,000$3,900,000
196Video detection cable (725-03.99)LF4,550$3.50$1.05
197Removal of signal equipment (730-01.02)EACH4$10,000$5,270.70
198Signal head assembly (130 pole mounted) (730-02.08)EACH1$1,500.00$1,528.50
199Signal head assembly (130 with backplate) (730-02.09)EACH30$1,750.00$1,528.50
200Signal head assembly (140 A4F with backplate) (730-02.30)EACH8$2,000.00$1,686.62
201Install pull box (type B) (730-03.21)EACH43$1,200.00$2,635.35
202Install pull box (fiber optic-type B) (730-03.24)EACH16$5,500.00$5,270.70
203Fiber optic splice fusion (730-03.33)EACH165$450.00$26.35
204Electrical service connection (730-05.01)EACH6$6,500.00$3,689.49
205Signal cable - 3 conductor (730-08.01)LF4,600$3.50$2.68
206Signal cable - 5 conductor (730-08.02)LF6,500$3.80$2.95
207Signal cable - 7 conductor (730-08.03)LF5,700$3.80$3.45
208Signal cable - 9 conductor (730-08.04)LF150$5.35$4.15
209Interconnect cable - fiber optic (12 fiber single-mode) (730-08.40)LF7,692$4.50$4.74
210Interconnect cable - fiber optic (6 fiber drop) (730-08.41)LF1,126$6.00$26.35
211Conduit 2" diameter (PVC schedule 40) (730-12.02)LF9,938$17.00$9.03
212Conduit 3" diameter (PVC schedule 40) (730-12.03)LF420$19.00$10.51
213Conduit 2" diameter (jack and bore) (730-12.13)LF526$33.00$20.82
214Conduit 2" diameter (directional bore) (730-12.23)LF440$35.00$20.82
215Conduit 3" diameter (directional bore) (730-12.24)LF970$40.00$22.30
216Vehicle detector (video) (730-13.02)EACH22$15,000$10,541
217Cabinet (pedestrian hybrid beacon) (730-15.07)EACH2$29,000$36,895
218Cabinet (eight phase base mounted) (730-15.32)EACH4$29,000$36,895
219Controller (atc) (730-16.04)EACH4$8,800.00$8,433.12
220Controller (pedestrian hybrid beacon) (730-16.14)EACH2$8,800.00$8,433.12
221Pedestal pole (description) (730-23.31)EACH18$3,300.00$5,270.70
222Cantilever signal support (1 arm @ 40') (730-23.80)EACH1$42,000$42,561
223Cantilever signal support (2 @ 45' & 50') (730-24.90)EACH5$48,000$50,203
224Cantilever signal support (2 @ 45' & 55') (730-24.91)EACH1$60,000$58,373
225Cantilever signal support (1 arm @ 50') (730-25.01)EACH1$40,000$43,615
226Cantilever signal support (1 arm @ 55') (730-25.07)EACH1$48,000$49,940
227Cantilever signal support (1 arm @ 60') (730-25.11)EACH1$50,000$51,521
228Cantilever signal support (1 arm @ 65') (730-25.13)EACH3$50,000$52,048
229Cantilever signal support (1 arm @ 70') (730-25.14)EACH3$52,000$52,312
230Pedestrian pushbutton with 12" sign (730-26.02)EACH22$2,500.00$1,317.67
231Countdown pedestrian signal (730-26.05)EACH22$2,500.00$1,317.67
232Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11)EACH22$3,100.00$2,635.35
233Battery back-UP system (730-35.06)EACH4$15,000$12,650
234Temporary traffic signal system (730-40)EACH2$35,000$84,152
235Pedestrian hybrid beacon assembly (730-50.25)EACH4$42,000$2,635.35
236Geotextile (type III)(erosion control) (740-10.03)SY13,994$4.00$2.86
237Geotextile (type IV)(stabilization) (740-10.04)SY40,626$5.00$8.17
238Temporary sediment tube 12IN (740-11.02)LF775$5.50$4.48
2398IN dip gravity sewer 0FT-6FT depth (797-05.01)LF225$150.00$325.95
2408IN dip gravity sewer 6FT-12FT depth (797-05.02)LF293$225.00$383.72
24148IN manhole 4FT-6FT depth (797-07.02)EACH2$10,000$8,517.20
24248IN manhole 6FT-8FT depth (797-07.03)EACH2$14,000$9,551.56
24348IN manhole 10FT-12FT depth (797-07.05)EACH1$18,000$14,441
244Seeding (with mulch) (801-01)UNIT945$60.00$47.44
245Temporary seeding (with mulch) (801-01.07)UNIT500$50.00$42.17
246Natve seed MX final stablizatn of slopes (801-01.38)UNIT48$200.00$105.41
247Seeding (without mulch) (801-02)UNIT1,421$55.00$27.41
248Water (seeding & sodding) (801-03)MG242$100.00$68.52
249Seed (supplemental application) (801-07)LB2,931$5.00$3.43
250Sodding (new sod) (803-01)SY2,424$9.00$9.49
251Turf reinforcement mat (class II) (805-01.02)SY5,675$5.00$6.85
252Erosion control blanket (type II) (805-12.02)SY70,322$1.75$1.21
253Project mowing (806-02.03)CYCL4$5,000.00$2,082.22
254Pole 35FT class 4 wood (790-02.03)EACH14$1,200.00$954.81
255Pole 40FT class 4 wood (790-03.03)EACH8$1,500.00$1,049.70
256Pole 45FT class 2 wood (790-04.02)EACH2$1,645.00$1,369.77
257Pole 45FT class 3 wood (790-04.03)EACH11$1,525.00$1,250.85
258Pole 50FT class 1 wood (790-05.01)EACH6$2,100.00$1,742.97
259Pole 50FT class 2 wood (790-05.02)EACH71$2,100.00$1,620.26
260Pole 55FT class 1 wood (790-06.01)EACH31$2,500.00$1,948.51
261Pole 55FT class 2 wood (790-06.02)EACH3$2,400.00$1,880.78
262Pole 55FT class H1 wood (790-06.19)EACH2$2,800.00$2,241.35
263Pole 60FT class 1 wood (790-07.01)EACH6$3,000.00$2,433.54
264Pole 65FT class 1 wood (790-08.30)EACH4$3,350.00$2,901.63
265Pole 70FT class 1 wood (790-09.01)EACH4$3,665.00$3,220.36
266Top existing pole (790-20.30)EACH3$300.00$125.16
267Field pole modifiction (790-20.31)EACH10$400.00$250.31
2681PH SGL primary support 15KV (790-21.01)EACH2$450.00$459.98
2691PH DBL primary support 15KV (790-21.05)EACH1$650.00$644.46
2701PH primary LG angle 15KV (790-21.07)EACH8$600.00$532.21
2711PH deadend 15KV (790-21.08)EACH12$525.00$498.24
2721PH primary tap 15KV (790-21.09)EACH39$520.00$449.53
2733PH crossarm SGL 15KV (790-25.01)EACH6$1,400.00$965.78
2743PH narrow profile SGL LG cond 15KV (790-25.03)EACH2$1,600.00$1,297.84
2753PH crossarm DBL prim support 15KV (790-25.10)EACH36$1,900.00$1,570.49
2763PH crossarm DBL prim sup LRG cond 15KV (790-25.11)EACH38$1,900.00$1,558.86
2773PH narrow profile LG cond SM angle 15KV (790-25.14)EACH3$1,200.00$1,071.68
2783PH vertical deadend LRG ang LG cond 15KV (790-25.18)EACH5$1,900.00$1,571.35
2793PH vertical deadend LG cond 15KV (790-25.20)EACH3$1,300.00$903.80
2803PH crossarm deadend SGL 15KV (790-25.21)EACH27$1,550.00$1,286.53
2813PH crossarm dde 15KV (790-25.23)EACH19$2,600.00$2,005.90
282Service assembly-pole type (790-31.02)EACH131$200.00$172.74
283Service conductor 6 AL duplex (790-31.04)LF8,620$3.75$2.97
284Service conductor 2 AL triplex (790-31.11)LF3,692$5.40$4.54
285Service conductor 1/0 AL qplex (790-31.20)LF211$10.00$6.84
286Down guy - through bolt type (790-32.01)EACH84$480.00$328.21
287Down guy - insulated (790-32.06)EACH147$465.00$356.12
288Guy guard (790-32.23)EACH248$30.00$22.46
289Overhead guy light construction - preform (790-32.27)EACH34$400.00$258.18
290Screw type anchor 23,000LB (F1-5D-P) (790-33.31)EACH121$685.00$543.72
291Screw type anchor 36,000LB (F1-6T-P) (790-33.32)EACH17$1,500.00$1,279.44
292Transfer service (790-36.04)EACH11$340.00$333.05
293Transfer - light assembly (790-36.10)EACH7$340.00$343.27
294Transfer existing 3PH transformer/recloser (790-36.12)EACH3$6,000.00$4,819.58
295Switch-900A-underslung (three phase) (790-36.21)EACH9$4,600.00$3,853.20
296OH cond 4 7/1 acsr swanate (790-40.01)LF333$2.95$2.08
297OH cond 2 7/1 acsr sparate (790-40.02)LF7,954$2.88$2.65
298OH cond 1/0 6/1 acsr raven (790-40.03)LF137$3.00$2.42
299OH cond 4/0 6/1 acsr penguin (790-40.06)LF137$3.00$3.29
300OH cond 2 7 aac iris (790-40.35)LF5,492$2.22$1.40
301OH cond 1/0 7 aac poppy (790-40.36)LF160$5.00$6.12
302OH cond 4/0 7 aac oxlip (790-40.39)LF18,854$4.35$3.54
303OH cond 556.5 19 aac dahlia (790-40.46)LF61,664$7.44$6.57
304UG pri cond 2 AL 15KV (790-41.01)LF8$100.00$69.68
305UG pri cond 1/0 AL 15KV (790-41.03)LF11$100.00$67.81
306UG sec cond 4/0 AL QPLX (790-41.58)LF86$19.50$19.97
3072IN dia PVC pipe (790-42.08)LF35$30.00$10.49
3084IN dia PVC pipe (790-42.10)LF86$50.00$17.89
309__ duct bank @ __in-__in depth (790-42.26)LF105$30.00$12.89
310Loadbreak elbow 200A 15KV (790-43.01)EACH7$600.00$397.39
311Loadbreak junction 3 PT 200A 15KV (790-43.05)EACH4$800.00$550.56
312Secondary pullbox large (790-43.46)EACH1$2,700.00$2,266.37
313Secondary riser W/ 3IN conduit (790-43.51)EACH1$1,300.00$815.73
3141PH primary riser W/ 3IN conduit (790-43.53)EACH1$3,200.00$2,092.96
3151PH transformer (790-46.01)EACH3$1,200.00$1,108.30
3161PH transformer conv W/pole MTD fuse & LA (790-46.02)EACH6$1,600.00$1,179.93
3171PH fuse cutout xarm mount 15KV (790-60.01)EACH20$650.00$446.55
318Lightning arrester arm MTD 9 KV (790-65.03)EACH12$550.00$296.90
319Pole ground rod type (790-68.01)EACH155$625.00$512.32
320SGL phase mounting bracket - fiberglass (790-68.13)EACH2$400.00$387.81
321Pole top pin (790-69.22)EACH1$350.00$299.55
322Stick pin (790-69.31)EACH12$165.00$83.63
323Arm pin (790-69.32)EACH151$140.00$81.81
324Street light on wood pole (790-70.01)EACH61$1,620.00$1,648.60
325Remove wire (790-98.01)LF99,975$1.45$1.32
326Remove poles (790-98.02)EACH183$475.00$375.47
327Remove framing/associated apparatus (790-98.03)EACH1,091$490.00$500.62
328Tree and brush removal off row (790-98.20)LS1$65,000$10,012
3292IN steel gas main (791-01.02)LF20$400.00$637.12
3306IN steel gas main (791-01.05)LF20$1,200.00$1,392.03
3312IN HDPE gas main (791-03.02)LF1,660$130.00$218.44
3324IN HDPE gas main (791-03.04)LF1,835$160.00$229.15
3336IN HDPE gas main (791-03.05)LF9,654$200.00$277.34
334HDD <2IN PE pipe - unconsolidated (791-04.01)LF2,003$140.00$182.04
335HDD 2IN PE pipe - unconsolidated (791-04.02)LF540$160.00$203.45
336HDD 4IN PE pipe - unconsolidated (791-04.04)LF115$200.00$364.07
337HDD 6IN PE pipe - unconsolidated (791-04.05)LF2,764$225.00$380.13
338Connect to 2IN EX. PE main (791-06.02)EACH11$3,500.00$8,298.66
339Connect to 4IN EX. PE main (791-06.03)EACH3$5,000.00$8,566.36
340Connect to 2IN EX. STL main (791-06.10)EACH1$6,500.00$21,416
341Connect to 6IN EX. STL main (791-06.12)EACH1$18,000$44,973
3422IN PE gas valve assembly (791-07.01)EACH8$1,000.00$3,747.78
3434IN PE gas valve assembly (791-07.02)EACH5$1,500.00$4,550.88
3446IN PE gas valve assembly (791-07.03)EACH7$3,200.00$6,157.07
3453/4IN service assembly (791-08.02)EACH32$4,200.00$1,980.97
3463/4IN PE service pipe (791-08.07)LF3,097$55.00$74.96
347Retire gas main (791-10.10)LS1$30,000$10,708
348Pole 35FT class 5 wood (793-01.08)EACH17$1,465.00$2,429.59
349Anchor 3/4IN (793-01.40)EACH152$777.00$640.75
350Guy wire 10M or 3/8IN (793-02.08)EACH152$380.00$201.13
351Overhead guy wire (10M) (793-02.92)EACH28$450.00$626.05
352Install guy guard (793-02.99)EACH152$35.00$34.58
35325 pair group aerial splice (793-03.01)EACH20$200.00$218.49
35410M strand (793-03.03)LF48,095$3.33$3.87
355Relash/delash cable (793-04.01)LF12,020$2.60$4.39
356Ready access closure (793-04.06)EACH2$1,000.00$864.84
357Aerial splice closure (793-04.07)EACH19$8,000.00$1,636.77
358Transfer aerial cable (793-04.08)EACH86$288.00$400.51
359Underground splice closure (793-04.12)EACH9$1,000.00$1,473.53
360288 fiber(material only) (793-07.10)LF14,535$3.33$2.60
36112-96 fiber(installation only) (793-07.16)LF22,665$2.88$3.14
362108-144 fiber(installation only) (793-07.17)LF24,335$2.88$3.14
363288-432 fiber(installation only) (793-07.19)LF14,535$2.88$4.21
364Fiber optic maintenance loop (793-07.23)EACH69$288.00$292.11
365Single fiber optic cable splice (793-07.25)EACH4,134$58.00$58.36
366Single fiber aerial drop (793-07.31)LF45,320$2.00$3.36
36772 fiber (material only) (793-07.51)LF22,665$1.00$0.76
368Fiber distribution tap (793-07.80)EACH7$522.00$1,151.14
369Fiber terminal (793-07.81)EACH21$322.00$1,523.80
370Rearrange fiber jumper (793-07.82)LF43,805$2.00$3.00
371Rearrange fiber drop (793-07.83)LF24,285$2.00$3.00
372Test bare fiber (793-07.99)EACH3,384$38.44$16.80
373Buried riser guard (793-11.13)EACH8$222.00$324.24
374Rearrange existing splice case (793-11.50)EACH12$600.00$471.09
375Rearrangement existing cable (793-12.02)EACH2$500.00$1,580.97
37625 pair group UG splice (793-13.06)EACH181$144.00$252.75
3771 duct formation @ 36IN depth (793-13.12)LF1,260$65.00$52.74
3782 duct formation @ 36IN depth (793-13.17)LF8,090$65.00$54.55
379Concrete encasement per duct (793-14.02)LF17,440$19.00$56.73
380MH precast (description) (793-14.07)EACH19$18,000$11,238
3814IN core drill into manhole (793-14.10)EACH3$2,000.00$1,171.09
3821 1/4IN innerduct (793-14.12)LF29,520$5.55$2.56
383MH(retire/remove/gravel backfill) (793-16.01)EACH7$5,555.00$3,009.19
384Relocate cable/inner duct from inside manhole (793-80.02)LF490$16.00$5.85
385Remove aerial cable and wire (793-98.01)LF153,296$1.70$1.99
386Remove crossconnect cabinet (793-98.02)EACH1$1,500.00$2,049.39
387Remove carrier cabinet (793-98.03)EACH1$1,500.00$2,049.39
388Remove poles all sizes (793-98.04)EACH140$250.00$585.54
389Retire buried facilities in place (793-98.05)LF5,170$10.00$1.76
390Remove pedestals (793-98.06)EACH4$100.00$117.10
391Remove underground to overhead riser (793-98.07)EACH23$100.00$175.66
392Remove anchor (any size) (793-98.08)EACH190$100.00$105.39
393Remove down guy (793-98.09)EACH196$100.00$58.56
3946IN dip restrained joint water line (795-01.03)LF1,850$125.00$167.53
3956IN dip slip joint water line (795-01.04)LF3,450$140.00$157.73
3968IN dip restrained joint water line (795-01.05)LF1,300$155.00$187.56
3978IN dip slip joint water line (795-01.06)LF4,000$155.00$174.91
39812IN dip restrained joint water line (795-01.09)LF1,650$190.00$224.01
39912IN dip slip joint water line (795-01.10)LF8,950$200.00$206.12
40020IN dip restrained joint water line (795-01.17)LF330$420.00$439.97
4012IN PVC water line (795-03.02)LF2,100$65.00$78.23
402Connect to 2IN water line (795-06.01)EACH7$5,000.00$3,854.59
403Connect to 6IN water line (795-06.04)EACH12$6,000.00$6,163.55
404Connect to 8IN water line (795-06.05)EACH7$7,000.00$7,647.10
405Connect to 12IN water line (795-06.07)EACH5$10,000$11,454
406Connect to 20IN water line (795-06.11)EACH2$18,000$37,308
407Cut and cap 2IN water line (795-06.31)EACH7$2,500.00$2,357.43
408Cut and cap 6IN water line (795-06.33)EACH13$5,000.00$3,302.03
409Cut and cap 8IN water line (795-06.34)EACH7$6,000.00$4,005.69
410Cut and cap 12IN water line (795-06.37)EACH4$10,000$4,941.56
411Cut and cap 20IN water line (795-06.42)EACH1$10,000$9,454.25
4122IN gate valve assembly (795-08.01)EACH13$4,500.00$2,811.81
4136IN gate valve assembly (795-08.04)EACH28$6,000.00$5,130.06
4148IN gate valve assembly (795-08.05)EACH24$7,500.00$6,224.60
41512IN gate valve assembly (795-08.09)EACH24$10,000$13,354
41620IN butterfly valve assembly (795-08.17)EACH1$19,000$38,908
4171IN water service meter assembly (795-09.02)EACH5$2,000.00$5,914.54
4182IN water service meter assembly (795-09.04)EACH2$6,000.00$9,848.54
4193/4IN HDPE service pipe (795-09.14)LF1,060$60.00$79.60
4201IN HDPE service pipe (795-09.15)LF160$100.00$79.94
4212IN HDPE service pipe (795-09.17)LF185$80.00$94.80
422Reconnect service assembly (795-09.51)EACH41$2,000.00$4,430.73
4235/8IN water service meter assembly (795-09.70)EACH21$1,800.00$4,758.57
4241IN auto air release valve assembly (795-10.03)EACH1$6,500.00$5,861.46
4252IN auto air release valve assembly (795-10.05)EACH3$8,000.00$9,973.29
426Blow-off assembly (795-11.01)EACH3$4,000.00$10,476
427Fire hydrant assembly (795-11.02)EACH21$11,000$15,223
428Remove fire hydrant (795-12.01)EACH15$2,000.00$3,153.44
429Removal of existing line (795-12.02)LS1$120,000$74,440
430Pipe grouting (795-12.03)LS1$250,000$131,695
431Remove blow-off assembly (795-12.05)EACH3$2,000.00$2,685.65
432Concrete encasement (795-14.05)LF800$500.00$236.49
433Flowable fill excavatable encasement (795-14.16)LF6,360$300.00$49.93
43412IN steel casing pipe open cut method (795-15.02)LF280$180.00$291.95
43524IN steel casing pipe open cut method (795-15.07)LF230$250.00$524.72
43616IN steel casing pipe open cut method (795-15.25)LF85$240.00$369.08
4378IN dip gravity sewer 0FT-6FT depth (797-05.01)LF3,712$155.00$359.10
4388IN dip gravity sewer 6FT-12FT depth (797-05.02)LF2,852$200.00$416.87
4398IN dip gravity sewer 12FT-18FT depth (797-05.03)LF147$265.00$567.31
4408IN dip gravity sewer >18FT depth (797-05.04)LF37$400.00$950.09
4418IN PVC gravity sewer 0FT-6FT depth (797-05.51)LF2,520$125.00$275.48
4428IN PVC gravity sewer 6FT-12FT depth (797-05.52)LF3,792$165.00$345.55
4438IN PVC gravity sewer 12FT-18FT depth (797-05.53)LF609$245.00$928.97
44448IN manhole 4FT-6FT depth (797-07.02)EACH23$10,000$8,517.20
44548IN manhole 6FT-8FT depth (797-07.03)EACH27$14,000$9,551.56
44648IN manhole 8FT-10FT depth (797-07.04)EACH17$16,000$9,885.95
44748IN manhole 10FT-12FT depth (797-07.05)EACH9$18,000$14,441
44848IN manhole 12FT-14FT depth (797-07.06)EACH6$20,000$18,153
44948IN manhole 14FT-16FT depth (797-07.07)EACH3$24,000$25,583
45048IN manhole 16FT-20FT depth (797-07.08)EACH5$30,000$32,412
451Manhole drop connection assembly (797-07.56)EACH22$5,000.00$10,121
452Adjust existing manhole (797-07.60)EACH1$5,000.00$5,273.34
453Traffic rated frames and covers (797-07.75)EACH53$1,500.00$1,793.27
454Remove sewer manhole (797-07.80)EACH44$2,500.00$1,960.55
4556IN PVC pipe for service lateral (797-08.05)LF1,350$95.00$172.81
4566IN clean out assembly (797-08.08)EACH55$1,500.00$2,617.41
457Connect 6IN lateral to sewer line (797-10.06)EACH55$1,500.00$3,825.96
458Connect EX. 8IN sewer to new manhole (797-10.09)EACH27$10,000$3,398.34
459Pump station retire in place (797-10.36)LS1$20,000$11,557
460Retirein place 48IN manhole (797-11.25)EACH7$2,500.00$3,501.84
461Retirein place existing sewer 8IN-14IN (797-11.31)LF11,420$25.00$20.82
462By-pass pumping (797-11.38)LS1$150,000$328,828
463Fiber optic cable enclosure (798-05.02)EACH3$2,400.00$1,241.84
464Fiber optic cable splice (798-05.03)EACH46$450.00$241.29
4653/8IN ehs steel strand (798-05.06)LF24,316$8.15$4.70
466Trunk/feeder cable .565 (798-05.08)LF34,199$7.65$4.33
467Trunk/feeder cable .750 (798-05.13)LF2,603$7.65$4.33
468Trunk/feeder cable 1.00 (798-05.17)LF13,902$7.65$4.33
469Drop cable 22 AWG (798-05.22)LF2,608$8.15$4.62
470Communication assembly (tap) (798-05.26)EACH50$1,111.00$601.43
471Communication assembly (bond) (798-05.27)EACH52$750.00$338.11
472Communication assembly (CSC) (798-05.29)EACH61$750.00$340.47
473Communication assembly (DC) (798-05.30)EACH18$1,111.00$601.42
474Communication assembly (dde) (798-05.32)EACH38$1,220.00$665.67
475Communication assembly (DE) (798-05.33)EACH56$750.00$340.06
476Communication assembly (E1-2) (798-05.34)EACH111$450.00$202.14
477Communication assembly (E2-2) (798-05.35)EACH25$1,300.00$629.40
478Communication assembly (F2&F3) (798-05.37)EACH111$1,300.00$642.85
479Communication assembly (split) (798-05.48)EACH12$1,500.00$601.42
480Communication assembly (lxtap) (798-05.50)EACH2$1,700.00$895.14
481Communication assy(amptap) (798-05.51)EACH16$1,700.00$895.14
482Communication assembly (loop) (798-05.52)EACH42$800.00$293.07
483Communication assembly (splice) (798-05.53)EACH15$1,400.00$601.42
484Fiber optic cable (4F) (798-06.02)LF561$8.88$4.86
485Fiber optic cable (6F) (798-06.03)LF2,017$8.88$4.86
486Fiber optic cable (12F) (798-06.04)LF2,895$8.88$4.86
487Fiber optic cable (20F) (798-06.05)LF2,167$9.40$5.03
488Fiber optic cable (44 F) (798-06.07)LF14,841$9.40$5.03
489Fiber optic cable (72F) (798-06.08)LF1,683$9.80$5.22
490Fiber optic cable (96F) (798-06.11)LF14,841$9.80$5.50
491Fiber optic cable (8F) (798-06.15)LF361$8.88$4.86
492Fiber optic cable (36F) (798-06.16)LF1,122$9.40$5.03
493Remove steel strand (798-09.01)LF24,838$4.00$2.00
494Remove aerial cable/terminals (798-09.02)LF82,295$3.55$2.00
495Remove poles, guys, anchors (798-09.03)EACH319$400.00$164.49
496Remove strand pole framing (798-09.08)EACH223$250.00$105.74
497Power supply (798-10.10)EACH1$25,000$12,761
498Amplifier assembly (798-10.15)EACH13$5,000.00$895.14
TDOT contract CNZ276: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy