TDOT contract CNZ213 bid tabulation
The construction of a concrete box beam bridge on s.r. 70 over the norfolk southern railroad (l.m. 6.19), including grading, drainage, retaining wall, and paving. Let by Tennessee DOT on August 15, 2025, Hawkins County. 2 bids received; low bid $9,392,609 by Southern Constructors, Inc..
- Owner
- Tennessee DOT
- Letting
- 15 AUG 2025
- Pay items
- 164
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Southern Constructors, Inc. | $9,392,609 | Low |
| 2 | Summers-Taylor, Inc. | $11,260,165 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Southern Constructors, Inc. | 2. Summers-Taylor, Inc. |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $100,000 | $40,200 |
| 2 | Trainee (109-10.01) | HR | 1,180 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $75,000 | $110,700 |
| 4 | Removal of pipe (15" CMP side drain, sta. 113+57) (202-02.01) | LF | 30 | $50.00 | $105.00 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 6,289 | $30.00 | $58.50 |
| 6 | Borrow excavation (unclassified) (203-03) | CY | 3,415 | $55.00 | $42.00 |
| 7 | Placing and spreading topsoil (203-04) | CY | 1,197 | $35.00 | $52.00 |
| 8 | Water (203-06) | MG | 37 | $150.00 | $15.00 |
| 9 | Furnishing & spreading topsoil (203-07) | CY | 94 | $75.00 | $129.00 |
| 10 | Construction of haul road (203-50) | LS | 1 | $450,000 | $1,502,000 |
| 11 | Brooming & degrassing shoulders (208-01.05) | LM | 1 | $1,500.00 | $5,980.00 |
| 12 | 18" temporary slope drain (209-02.07) | LF | 102 | $100.00 | $50.50 |
| 13 | Filter sock (18 inch) (209-03.22) | LF | 318 | $22.00 | $19.00 |
| 14 | Sediment removal (209-05) | CY | 62 | $100.00 | $48.50 |
| 15 | Temporary silt fence (with backing) (209-08.02) | LF | 8,115 | $7.00 | $5.90 |
| 16 | Temporary silt fence (without backing) (209-08.03) | LF | 983 | $7.00 | $4.70 |
| 17 | Rock check dam (209-08.07) | EACH | 6 | $1,500.00 | $928.00 |
| 18 | Enhanced rock check dam (209-08.08) | EACH | 9 | $2,000.00 | $1,500.00 |
| 19 | Sandbags (209-09.01) | BAG | 200 | $30.00 | $11.50 |
| 20 | Curb inlet protection (type 4) (209-09.43) | EACH | 5 | $1,000.00 | $544.00 |
| 21 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 20 | $35.00 | $38.50 |
| 22 | Mineral aggregate, type A base, grading D (303-01) | TON | 8,218 | $65.00 | $73.50 |
| 23 | Mineral aggregate (size 57) (303-10.01) | TON | 698 | $65.00 | $113.00 |
| 24 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 740 | $200.00 | $197.00 |
| 25 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 590 | $210.00 | $238.00 |
| 26 | Asp. conc. mix(PG64-22) (BPMB-HM) GR. A-S (307-01.20) | TON | 697 | $200.00 | $195.00 |
| 27 | Bituminous material for prime coat (PC) (402-01) | TON | 10 | $1,450.00 | $1,170.00 |
| 28 | Aggregate for cover material (PC) (402-02) | TON | 33 | $175.00 | $116.00 |
| 29 | Bituminous material for tack coat (TC) (403-01) | TON | 8 | $1,650.00 | $1,420.00 |
| 30 | Saw cutting asphalt pavement (407-20.05) | LF | 1,580 | $15.00 | $9.80 |
| 31 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 148 | $225.00 | $272.00 |
| 32 | Acs mix(PG64-22) grading D (411-01.10) | TON | 400 | $230.00 | $230.00 |
| 33 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 0.70 | $1,200.00 | $13,250 |
| 34 | Cold planing bituminous pavement (415-01.01) | TON | 610 | $100.00 | $43.00 |
| 35 | Retaining wall (SR-70 sta. 118+03.82 to sta. 126+84.42) (604-07.01) | SF | 5,301 | $165.00 | $201.00 |
| 36 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 72 | $300.00 | $394.00 |
| 37 | 18" pipe culvert (side drain) (607-39.02) | LF | 24 | $275.00 | $230.00 |
| 38 | Class A concrete (pipe endwalls) (611-07.01) | CY | 3 | $2,500.00 | $2,640.00 |
| 39 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 135 | $3.00 | $4.00 |
| 40 | 18IN endwall (side drain) (611-07.31) | EACH | 2 | $6,000.00 | $6,340.00 |
| 41 | Catch basins, type 51, > 4' - 8' depth (611-51.02) | EACH | 4 | $9,500.00 | $12,900 |
| 42 | Catch basins, type 52, > 4FT - 8FT depth (611-52.02) | EACH | 1 | $25,000 | $28,700 |
| 43 | 42" temporary drainage pipe (621-03.06) | LF | 85 | $250.00 | $237.00 |
| 44 | Temporary shoring (621-05.01) | SF | 5,000 | $50.00 | $52.00 |
| 45 | Portland cement concrete ditch paving (703-01) | CY | 1 | $5,000.00 | $5,670.00 |
| 46 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 1,363 | $28.00 | $34.00 |
| 47 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 6 | $1,500.00 | $1,270.00 |
| 48 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 1 | $4,000.00 | $3,490.00 |
| 49 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 4 | $4,000.00 | $2,860.00 |
| 50 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 2 | $3,500.00 | $3,700.00 |
| 51 | Radius rail (706-06.03) | LF | 194 | $45.00 | $42.50 |
| 52 | Rounded end element (706-10.26) | EACH | 3 | $500.00 | $159.00 |
| 53 | Stock fence gate (haul road) (707-03.03) | EACH | 3 | $3,000.00 | $2,330.00 |
| 54 | High-visibility construction fence (707-08.11) | LF | 2,138 | $7.50 | $4.45 |
| 55 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 11 | $500.00 | $318.00 |
| 56 | Rubble stone rip-rap (grouted) (709-02.01) | CY | 73 | $450.00 | $785.00 |
| 57 | Machined rip-rap (class A-3) (709-05.05) | TON | 100 | $85.00 | $136.00 |
| 58 | Machined rip-rap (class A-1) (709-05.06) | TON | 412 | $85.00 | $101.00 |
| 59 | Aggregate underdrains (with pipe) (710-02) | LF | 1,250 | $30.00 | $25.50 |
| 60 | Lateral underdrain (710-05) | LF | 176 | $75.00 | $62.50 |
| 61 | Lateral underdrain endwall (2:1) (710-06.11) | EACH | 3 | $1,500.00 | $2,830.00 |
| 62 | 6" perforated plastic pipe (710-10.02) | LF | 911 | $15.00 | $38.50 |
| 63 | Traffic control (712-01) | LS | 1 | $150,000 | $92,500 |
| 64 | Interconnected portable barrier rail (712-02.02) | LF | 500 | $50.00 | $89.00 |
| 65 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $10,500 | $8,470.00 |
| 66 | Flexible drums (channelizing) (712-04.01) | EACH | 10 | $55.00 | $40.00 |
| 67 | Warning lights (type A) (712-05.01) | EACH | 18 | $55.00 | $32.00 |
| 68 | Signs (construction) (712-06) | SF | 1,408 | $15.00 | $14.00 |
| 69 | Temporary barricades (type III) (712-07.03) | LF | 132 | $50.00 | $11.50 |
| 70 | Removable pavement marking (stop line) (712-09.04) | LF | 51 | $25.00 | $26.00 |
| 71 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 0.12 | $1,500.00 | $105.00 |
| 72 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 25 | $5.00 | $1.05 |
| 73 | Sign post delineation enhancement (713-02.21) | LF | 24 | $20.00 | $6.40 |
| 74 | "U" section steel posts (713-11.01) | LB | 100 | $10.00 | $5.30 |
| 75 | Perforated/knockout square tube post (713-11.02) | LB | 140 | $12.00 | $5.30 |
| 76 | U post slip base (713-11.22) | EACH | 1 | $500.00 | $571.00 |
| 77 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 43 | $20.00 | $18.50 |
| 78 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 8 | $25.00 | $19.50 |
| 79 | Removal of signs, posts and footings (713-15) | LS | 1 | $3,000.00 | $318.00 |
| 80 | Changeable message sign unit (713-16.01) | EACH | 4 | $12,000 | $11,200 |
| 81 | Barrier mounted sign support (perf/knockout) (713-30.10) | EACH | 1 | $600.00 | $1,270.00 |
| 82 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 21 | $110.00 | $65.50 |
| 83 | Removal of snowplowable reflective marker (716-01.30) | EACH | 21 | $55.00 | $19.50 |
| 84 | Painted pavement marking (4" line) (716-05.01) | LM | 2.80 | $1,500.00 | $3,260.00 |
| 85 | Painted pavement marking (stop line) (716-05.05) | LF | 71 | $15.00 | $10.00 |
| 86 | Contrast pavement marking 6" (716-09.86) | LM | 0.20 | $42,000 | $61,660 |
| 87 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1.30 | $8,200.00 | $11,400 |
| 88 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 0.20 | $8,500.00 | $5,500.00 |
| 89 | Mobilization (717-01) | LS | 1 | $950,000 | $640,000 |
| 90 | Geogrid reinforcement type 2 (740-07.04) | SY | 1,013 | $10.00 | $6.30 |
| 91 | Geotextile (type III)(erosion control) (740-10.03) | SY | 873 | $10.00 | $8.40 |
| 92 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 611 | $10.00 | $10.50 |
| 93 | Temporary sediment tube 20IN (740-11.04) | LF | 6,027 | $10.00 | $4.70 |
| 94 | Seeding (with mulch) (801-01) | UNIT | 46 | $150.00 | $111.00 |
| 95 | Temporary seeding (with mulch) (801-01.07) | UNIT | 436 | $75.00 | $43.50 |
| 96 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 24 | $175.00 | $174.00 |
| 97 | Seeding (without mulch) (801-02) | UNIT | 130 | $45.00 | $38.00 |
| 98 | Water (seeding & sodding) (801-03) | MG | 80 | $225.00 | $218.00 |
| 99 | Seed (supplemental application) (801-07) | LB | 35 | $100.00 | $65.50 |
| 100 | Fertilizer (supplemental application) (801-08) | TON | 3 | $2,200.00 | $2,290.00 |
| 101 | Sodding (new sod) (803-01) | SY | 2,542 | $12.00 | $11.00 |
| 102 | Turf reinforcement mat (class III) (805-01.03) | SY | 521 | $12.00 | $11.00 |
| 103 | Erosion control blanket (type II) (805-12.02) | SY | 11,016 | $2.00 | $1.50 |
| 104 | Project mowing (806-02.03) | CYCL | 4 | $5,000.00 | $1,480.00 |
| 105 | Removal of asbestos (existing BR. no. 37-SR070-06.19) (202-01.05) | LS | 1 | $50,000 | $26,500 |
| 106 | Removal of structures (existing BR. no. 37-SR070-06.19) (202-04.01) | LS | 1 | $200,000 | $237,000 |
| 107 | Dry excavation (bridges) (204-02.01) | CY | 554 | $85.00 | $218.00 |
| 108 | Core drilling for piles(rock) (204-14) | LF | 464 | $400.00 | $689.00 |
| 109 | Core drilling for piles(soil) (204-15) | LF | 240 | $400.00 | $215.00 |
| 110 | Granular backfill (bridges) (303-01.02) | TON | 30 | $90.00 | $197.00 |
| 111 | Epoxy coated reinforcing steel (604-02.03) | LB | 110,364 | $2.25 | $2.20 |
| 112 | Class A concrete (bridges) (604-03.01) | CY | 351 | $1,300.00 | $2,200.00 |
| 113 | Steel bar reinforcement (bridges) (604-03.02) | LB | 77,248 | $2.25 | $3.05 |
| 114 | Pavement @ bridge ends (604-03.04) | SY | 228 | $500.00 | $877.00 |
| 115 | Class D concrete (bridge deck) (604-03.09) | CY | 266 | $1,600.00 | $1,730.00 |
| 116 | Applied texture finish (new structures) (604-04.01) | SY | 1,238 | $22.00 | $19.00 |
| 117 | Three star state emblem (604-04.41) | EACH | 7 | $2,500.00 | $4,050.00 |
| 118 | Bridge deck grooving (mechanical) (604-05.31) | SY | 1,090 | $12.00 | $6.30 |
| 119 | Steel piles (12 inch) (606-03.03) | LF | 1,381 | $200.00 | $205.00 |
| 120 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 83 | $500.00 | $253.00 |
| 121 | Prestressed concrete box beam (33" X 48") (615-02.11) | LF | 1,122 | $675.00 | $800.00 |
| 122 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 1,321 | $175.00 | $210.00 |
| 123 | Chain-link fence (bridges) (707-07.01) | SF | 2,702 | $35.00 | $29.50 |
| 124 | Reinforced concrete slope pavement (709-04) | CY | 100 | $1,500.00 | $975.00 |
| 125 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 126 | $70.00 | $58.00 |
| 126 | 6" pipe underdrain (710-09.02) | LF | 44 | $70.00 | $50.00 |
| 127 | Guy marker (E3-10) (760-15.17) | EACH | 5 | $125.00 | $136.00 |
| 128 | Pole 45FT class 2 wood (790-04.02) | EACH | 7 | $2,500.00 | $2,720.00 |
| 129 | Pole 45FT class 3 wood (790-04.03) | EACH | 2 | $2,500.00 | $2,720.00 |
| 130 | Pole 50FT class 1 wood (790-05.01) | EACH | 1 | $3,800.00 | $4,080.00 |
| 131 | 1PH primary tap 15KV (790-21.09) | EACH | 1 | $500.00 | $477.00 |
| 132 | 3PH crossarm DBL prim sup LRG cond 15KV (790-25.11) | EACH | 5 | $2,500.00 | $2,270.00 |
| 133 | 3PH crossarm dde LRG cond 15KV (790-25.24) | EACH | 5 | $3,000.00 | $2,540.00 |
| 134 | 3PH crossarm double small angle 15KV (790-25.42) | EACH | 3 | $2,500.00 | $2,270.00 |
| 135 | Down guy - through bolt type (790-32.01) | EACH | 8 | $550.00 | $376.00 |
| 136 | OH guy hvy const -through bolt type (790-32.21) | EACH | 2 | $1,250.00 | $659.00 |
| 137 | Transfer capacitor bank (790-36.02) | EACH | 1 | $10,000 | $9,970.00 |
| 138 | OH cond 3/0 6/1 acsr pigeon (790-40.05) | LF | 1,452 | $4.00 | $2.70 |
| 139 | OH cond 336.4 19 aac tulip (790-40.42) | LF | 403 | $5.00 | $3.90 |
| 140 | OH cond 556.5 19 aac dahlia (790-40.46) | LF | 1,209 | $8.00 | $7.70 |
| 141 | OH cond 795 37 aac arbutus (790-40.49) | LF | 4,356 | $8.00 | $6.60 |
| 142 | Cutout knife switch, SNGL loadbreak 15KV (790-58.03) | EACH | 1 | $2,200.00 | $2,270.00 |
| 143 | Pole ground rod type (790-68.01) | EACH | 10 | $500.00 | $437.00 |
| 144 | Anchor power screw (790-72.01) | EACH | 5 | $1,500.00 | $1,360.00 |
| 145 | Fiber tangent assembly (790-74.31) | EACH | 6 | $550.00 | $474.00 |
| 146 | Fiber double deadend assembly (790-74.33) | EACH | 7 | $1,250.00 | $1,220.00 |
| 147 | Remove wire (790-98.01) | LF | 7,950 | $3.00 | $2.10 |
| 148 | Remove poles (790-98.02) | EACH | 9 | $1,000.00 | $1,040.00 |
| 149 | Remove framing/associated apparatus (790-98.03) | EACH | 20 | $500.00 | $464.00 |
| 150 | 2IN mdpe gas main (791-02.02) | LF | 153 | $60.00 | $58.00 |
| 151 | 6IN mdpe gas main (791-02.05) | LF | 390 | $75.00 | $127.00 |
| 152 | HDD 2IN PE pipe - unconsolidated (791-04.02) | LF | 100 | $70.00 | $101.00 |
| 153 | HDD 6IN PE pipe - unconsolidated (791-04.05) | LF | 60 | $100.00 | $164.00 |
| 154 | Connect to 2IN EX. PE main (791-06.02) | EACH | 2 | $3,500.00 | $7,620.00 |
| 155 | Connect to 6IN EX. PE main (791-06.04) | EACH | 2 | $5,000.00 | $13,200 |
| 156 | Pole 40FT class 4 wood (793-01.12) | EACH | 1 | $5,500.00 | $2,720.00 |
| 157 | Anchor 1IN (793-01.41) | EACH | 10 | $1,500.00 | $1,020.00 |
| 158 | Aerial splice closure (793-04.07) | EACH | 1 | $1,200.00 | $1,130.00 |
| 159 | Transfer aerial cable (793-04.08) | EACH | 9 | $400.00 | $287.00 |
| 160 | Dig splice pit 80 C.F. (793-12.01) | EACH | 2 | $1,250.00 | $3,060.00 |
| 161 | 1 duct formation @ 36IN depth (793-13.12) | LF | 30 | $110.00 | $151.00 |
| 162 | Remove poles all sizes (793-98.04) | EACH | 2 | $1,100.00 | $1,040.00 |
| 163 | Remove anchor (any size) (793-98.08) | EACH | 3 | $300.00 | $227.00 |
| 164 | Remove down guy (793-98.09) | EACH | 3 | $100.00 | $54.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 15, 2025. Compiled by Mirage Metrics.